Efektivitas Metode Pekerjaan Pelat Lantai Bondek, Half Precast dan Konvensional Gedung Asrama Putra Al-Azhar

View through CrossRef
The floor plate is one of the important components in a multi-story building. Conventional methods are still widely used for building floor slabs. This method requires a lot of labor and time, which can reduce productivity. Other methods, such as bondek and half precast in floor slab work, are expected to increase work effectiveness and efficiency. This study aims to determine which method is most effective in floor slab work by reviewing cost, time, and work productivity. Floor plate planning consists of calculating each method's structural strength and volume of work, including formwork, reinforcement, concrete, and formwork dismantling. Cost analysis is carried out by collecting data on material prices and labor wages for the building's Draft Budget (RAB). Estimated work time involves formwork preparation, installation of reinforcement, and concrete casting for the three work methods. Based on the results of the calculation analysis on the floor slab work of the Al-Azhar Boys Dormitory Building  with an area of the floor plate of 375,318 m2. Conventional floor slab work is more economical than bondek slab work by around 31.23%, but requires the longest work time. Meanwhile bondek floor slabs offer the fastest processing time, even though the cost is higher than conventional slabs, around 31.19% and 5.18% lower than half precast slabs. This can be a recommendation in choosing a floor slab work method.
Title: Efektivitas Metode Pekerjaan Pelat Lantai Bondek, Half Precast dan Konvensional Gedung Asrama Putra Al-Azhar
Description:
The floor plate is one of the important components in a multi-story building.
Conventional methods are still widely used for building floor slabs.
This method requires a lot of labor and time, which can reduce productivity.
Other methods, such as bondek and half precast in floor slab work, are expected to increase work effectiveness and efficiency.
This study aims to determine which method is most effective in floor slab work by reviewing cost, time, and work productivity.
Floor plate planning consists of calculating each method's structural strength and volume of work, including formwork, reinforcement, concrete, and formwork dismantling.
Cost analysis is carried out by collecting data on material prices and labor wages for the building's Draft Budget (RAB).
Estimated work time involves formwork preparation, installation of reinforcement, and concrete casting for the three work methods.
Based on the results of the calculation analysis on the floor slab work of the Al-Azhar Boys Dormitory Building  with an area of the floor plate of 375,318 m2.
Conventional floor slab work is more economical than bondek slab work by around 31.
23%, but requires the longest work time.
Meanwhile bondek floor slabs offer the fastest processing time, even though the cost is higher than conventional slabs, around 31.
19% and 5.
18% lower than half precast slabs.
This can be a recommendation in choosing a floor slab work method.

Related Results

PERBANDINGAN POLA RETAK DAN LENDUTAN PADA PELAT BETON MENGGUNAKAN TULANGAN KONVENSIONAL DAN WIREMESH
PERBANDINGAN POLA RETAK DAN LENDUTAN PADA PELAT BETON MENGGUNAKAN TULANGAN KONVENSIONAL DAN WIREMESH
Penelitian dengan judul melakukan Pengujian Eksperimental Perbandingan Pola Retak dan Lendutan pada Pelat Beton Menggunakan Tulangan Konvensional dan Wiremesh ...
Perilaku Shearwall Pelat Bergelombang Terhadap Beban Gempa Lateral Statik
Perilaku Shearwall Pelat Bergelombang Terhadap Beban Gempa Lateral Statik
Portal bangunan gedung dengan konstruksi baja profil sudah sangat umum digunakan. Namun dengan potensi gempa di Indonesia yang memiliki resiko sangat besar, maka geometri portal ha...
Analisis Penggunaan Dinding Façade Beton Precast Pada Gedung 4 Lantai
Analisis Penggunaan Dinding Façade Beton Precast Pada Gedung 4 Lantai
Pekerjaan dinding façade adalah pekerjaan dengan utilitas yang kompleks dan merupakan sumber aktifitas kerja yang dapat menimbulkan bahaya (Hazard) kece...
ANALISIS PERBANDINGAN WAKTU PELAKSANAAN PEKERJAAN PENGECORAN MENGGUNAKAN TOWER CRANE DENGAN CONCRETE PUMP
ANALISIS PERBANDINGAN WAKTU PELAKSANAAN PEKERJAAN PENGECORAN MENGGUNAKAN TOWER CRANE DENGAN CONCRETE PUMP
Pemilihan alat yang tepat untuk melakukan pekerjaan konstruksi sangat dibutuhkan, agar pelaksanaan pekerjaan menjadi efektif dan efesien. Menggunakan alat yang tepat akan mempengar...
TINJAUAN KUAT LENTUR PELAT BETON DENGAN PENAMBAHAN KAWAT DI ANTARA TULANGAN PELAT
TINJAUAN KUAT LENTUR PELAT BETON DENGAN PENAMBAHAN KAWAT DI ANTARA TULANGAN PELAT
<p>Seiring berkembangnya zaman, inovasi pada bidang konstruksi bangunan turut mengalami kemajuan tak terkecuali pada struktur beton bertulang, pada penelitian ini dilakukan m...
PERHITUNGAN KAPASITAS LIFT SEBAGAI SARANA TRANSPORTASI VERTIKAL PADA GEDUNG BERTINGKAT
PERHITUNGAN KAPASITAS LIFT SEBAGAI SARANA TRANSPORTASI VERTIKAL PADA GEDUNG BERTINGKAT
Pada Gedung 454 Politeknik Negeri Banyuwangi dengan tinggi 4 lantai pada gedung A dan C, tinggi 5 lantai pada gedung B masih menggunakan tangga sebagai alat transportasi vertikal u...
Sistem Perekaman Pelat Nomor Mobil pada Palang Pintu Parkir Menggunakan Web Kamera dan Mikrokontroler
Sistem Perekaman Pelat Nomor Mobil pada Palang Pintu Parkir Menggunakan Web Kamera dan Mikrokontroler
Ilmu dan teknologi pengolahan citra bermanfaat bagi kehidupan, salah satunya ialah membaca dan mengenali nomor pelat kendaraan dengan pengolahan citra sehingga sistem ini dapat men...
PERENCANAAN STRUKTUR GEDUNG DELAPAN LANTAI RUMAH SAKIT AWAL BROS, BATU AJI – KOTA BATAM
PERENCANAAN STRUKTUR GEDUNG DELAPAN LANTAI RUMAH SAKIT AWAL BROS, BATU AJI – KOTA BATAM
Rumah Sakit Awal Bros merupakan rumah sakit swasta yang terletak di Batu Aji-Kota Batam. Saat ini Pihak Rumah Sakit Awal Bros fokus pada pembangunan gedung 8 lantai di Batu aji-Kot...

Back to Top