Contractor-Based Evaluation of Construction Cost Overrun Factors Using Matrix Analysis
View through CrossRef
The construction cost overrun is an important issue that should be addressed, as it directly impacts many construction companies. Our research objective is to study and rank the impacts of empirical attitudes on construction cost overruns using the matrix analysis method. The research began with a focus group of 78 respondents, including 40 project engineers from contractor construction companies, 18 heads of government sectors related to construction projects, and 20 construction academicians. Based on expert interviews and the focus group discussion, 13 relevant factors were identified, and a questionnaire survey was subsequently conducted for data collection. The results showed that labor shortages were the most important factor influencing construction cost overruns, with the highest eigenvector value of 0.1687. The ranking of factors based on the percentages of average construction cost overruns includes labor shortages, variation orders, financial capacity, material price fluctuations, and drawing conditions, accounting for 18.3%, 15.7%, 12.8%, 10.2%, and 9.0%, respectively. These findings demonstrate the applicability of matrix analysis as a systematic approach for prioritizing empirical managerial attitudes influencing construction cost overruns, thereby providing a structured basis for decision-making in construction cost risk management.
Title: Contractor-Based Evaluation of Construction Cost Overrun Factors Using Matrix Analysis
Description:
The construction cost overrun is an important issue that should be addressed, as it directly impacts many construction companies.
Our research objective is to study and rank the impacts of empirical attitudes on construction cost overruns using the matrix analysis method.
The research began with a focus group of 78 respondents, including 40 project engineers from contractor construction companies, 18 heads of government sectors related to construction projects, and 20 construction academicians.
Based on expert interviews and the focus group discussion, 13 relevant factors were identified, and a questionnaire survey was subsequently conducted for data collection.
The results showed that labor shortages were the most important factor influencing construction cost overruns, with the highest eigenvector value of 0.
1687.
The ranking of factors based on the percentages of average construction cost overruns includes labor shortages, variation orders, financial capacity, material price fluctuations, and drawing conditions, accounting for 18.
3%, 15.
7%, 12.
8%, 10.
2%, and 9.
0%, respectively.
These findings demonstrate the applicability of matrix analysis as a systematic approach for prioritizing empirical managerial attitudes influencing construction cost overruns, thereby providing a structured basis for decision-making in construction cost risk management.
Related Results
A BESPOKE APPROACH FOR RELATING MATERIAL WASTE TO COST OVERRUN IN THE CONSTRUCTION INDUSTRY
A BESPOKE APPROACH FOR RELATING MATERIAL WASTE TO COST OVERRUN IN THE CONSTRUCTION INDUSTRY
The problems of material waste and cost overruns are common in the construction industry. These problems occur at different stages of a construction project, from planning, design ...
Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry
Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry
Many construction projects exceed time and budget. The Saudi Arabian construction projects are not an exception to this phenomenon. However, the causes of time and cost overrun of ...
A study of causes of delay and cost overrun in office construction projects in the eThekwini Municipal Area, South Africa
A study of causes of delay and cost overrun in office construction projects in the eThekwini Municipal Area, South Africa
On-time completion and conformity with assigned cost of every project are the most important factors in the success of project plans. Cost overruns and time overrun (delays) have b...
ANALISIS COST OVERRUNS PADA PROYEK X
ANALISIS COST OVERRUNS PADA PROYEK X
Industri konstruksi merupakan salah satu sektor penting dalam perekonomian suatu negara. Sektor ini berperan dalam pembangunan infrastruktur, sarana dan prasarana, serta berbagai f...
Revisiting Causative Factors of Project Cost Overrun in Building Construction Projects in Nigeria
Revisiting Causative Factors of Project Cost Overrun in Building Construction Projects in Nigeria
Abstract
The growing need for construction of all types coupled with a tight monetary supply has provided the construction industry with a big challenge to cut cost....
CAUSES OF TIME OVERRUN IN ROAD CONSTRUCTION PROJECTS
CAUSES OF TIME OVERRUN IN ROAD CONSTRUCTION PROJECTS
Time overrun is a situation in which construction project exceeds the specified completion date or the period agreed upon by the parties for handover. The concept is also known as ...
Significant factors affecting the Vietnam Roads Infrastructure Construction Cost Overrun - A Review
Significant factors affecting the Vietnam Roads Infrastructure Construction Cost Overrun - A Review
Cost overrun represents a significant challenge faced in construction projects, particularly in the realm of transportation infrastructure. The investigation into the causes of cos...
Contingency Management in Indian Construction Projects
Contingency Management in Indian Construction Projects
The successful completion of Indian construction projects possesses an inherent uncertainty due to the nature of the construction industry along with prevailing tepid recovery of t...