CAUSES OF TIME OVERRUN IN ROAD CONSTRUCTION PROJECTS
View through CrossRef
Time overrun is a situation in which construction project exceeds the specified completion date or the period agreed upon by the parties for handover. The concept is also known as overtime and has become a major problem for most construction projects worldwide due to significant waste and missed opportunities for several relevant stakeholders. Therefore, this study aimed to determine the causes of time overrun and mitigate time overrun in road construction projects. The method used includes interviews and questionnaires, which were subjected to focus group discussions (FGDs) with several experts before distribution to competent parties in construction sector. The data collected were analyzed using exploratory factor analysis to ensure accuracy and for optimization. A total of 132 questionnaires were answered correctly and returned. The results identified 7 factors affecting time overrun, which included (1) politics and government, (2) finance and planning, (3) management, (4) resources, (5) delays and errors, (6) projects, and (7) others. A total of 17 causes were also observed including political situations, political interference, economic determinants, land disputes, and late payments for additional work by the owner, followed by 12 other causes. Moreover, mitigation efforts were recommended to prevent and reduce the causes of project time overrun.
Centre for Evaluation in Education and Science (CEON/CEES)
Title: CAUSES OF TIME OVERRUN IN ROAD CONSTRUCTION PROJECTS
Description:
Time overrun is a situation in which construction project exceeds the specified completion date or the period agreed upon by the parties for handover.
The concept is also known as overtime and has become a major problem for most construction projects worldwide due to significant waste and missed opportunities for several relevant stakeholders.
Therefore, this study aimed to determine the causes of time overrun and mitigate time overrun in road construction projects.
The method used includes interviews and questionnaires, which were subjected to focus group discussions (FGDs) with several experts before distribution to competent parties in construction sector.
The data collected were analyzed using exploratory factor analysis to ensure accuracy and for optimization.
A total of 132 questionnaires were answered correctly and returned.
The results identified 7 factors affecting time overrun, which included (1) politics and government, (2) finance and planning, (3) management, (4) resources, (5) delays and errors, (6) projects, and (7) others.
A total of 17 causes were also observed including political situations, political interference, economic determinants, land disputes, and late payments for additional work by the owner, followed by 12 other causes.
Moreover, mitigation efforts were recommended to prevent and reduce the causes of project time overrun.
Related Results
Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry
Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry
Many construction projects exceed time and budget. The Saudi Arabian construction projects are not an exception to this phenomenon. However, the causes of time and cost overrun of ...
A BESPOKE APPROACH FOR RELATING MATERIAL WASTE TO COST OVERRUN IN THE CONSTRUCTION INDUSTRY
A BESPOKE APPROACH FOR RELATING MATERIAL WASTE TO COST OVERRUN IN THE CONSTRUCTION INDUSTRY
The problems of material waste and cost overruns are common in the construction industry. These problems occur at different stages of a construction project, from planning, design ...
Unstructured Road Region Detection and Road Classification Algorithm Based on Machine Vision
Unstructured Road Region Detection and Road Classification Algorithm Based on Machine Vision
<div class="section abstract"><div class="htmlview paragraph">Accurate sensing of road conditions is one of the necessary technologies for safe driving of intelligent v...
Evaluation Of Road Channel As A Drainage Function For Agricultural Land Remediation
Evaluation Of Road Channel As A Drainage Function For Agricultural Land Remediation
The Ring Road section on the West Ring Road - Madiun City is an alternative road which connecting the outside of Madiun city to the Madiun city. That road is a road with both side ...
Contingency Management in Indian Construction Projects
Contingency Management in Indian Construction Projects
The successful completion of Indian construction projects possesses an inherent uncertainty due to the nature of the construction industry along with prevailing tepid recovery of t...
ANALISIS COST OVERRUNS PADA PROYEK X
ANALISIS COST OVERRUNS PADA PROYEK X
Industri konstruksi merupakan salah satu sektor penting dalam perekonomian suatu negara. Sektor ini berperan dalam pembangunan infrastruktur, sarana dan prasarana, serta berbagai f...
Significant factors affecting the Vietnam Roads Infrastructure Construction Cost Overrun - A Review
Significant factors affecting the Vietnam Roads Infrastructure Construction Cost Overrun - A Review
Cost overrun represents a significant challenge faced in construction projects, particularly in the realm of transportation infrastructure. The investigation into the causes of cos...
KEPUASAN PENGGUNA JALAN TERHADAP PELAYANAN JALAN PROVINSI DI KALIMANTAN BARAT
KEPUASAN PENGGUNA JALAN TERHADAP PELAYANAN JALAN PROVINSI DI KALIMANTAN BARAT
Abstract
The quality of road services includes the performance of road infrastructure components, which include road pavement structures, road geometry, road complementary buil...