Contingency Management in Indian Construction Projects

View through CrossRef
The successful completion of Indian construction projects possesses an inherent uncertainty due to the nature of the construction industry along with prevailing tepid recovery of the Indian economy, which has made it difficult for construction companies to achieve required operational and financial performance. This necessitates having accurate project cost estimation and efficient contingency management to shield unknown project risk and address cost overrun problems. Therefore, this study aims to assess the current state, the issues faced in contingency management and evaluating the effectiveness of contingency in overcoming cost overrun problems in Indian construction companies. The study preferred a quantitative approach in capturing the required data by using structured questionnaires collected from 100 Indian construction companies (of contractors, vendors/suppliers, customers, and consultants) out of 335 companies with a response rate of 29.85%. This, along with archival data analysis of 50 Indian construction projects completed between Calendar Year (CY) 2014 to 2019. The captured data were analysed using simple statistical tools like Relative Importance Index (RII), mean score, standard deviation and ranking methods to ensure relevant results aligned with research objectives. The result findings of the study revealed that 60% of Indian construction companies preferred the traditional percentage method for contingency sum percentage addition to estimated project cost (a subjective approach based on the historical project performance) which may not be adequate in overcoming cost overrun problems. Archival data analysis found that contingency consideration was effective in accommodating cost overrun problems in 9 (18%) projects out of 50 projects. The study further found that contingency was utilised in an unplanned mode and having unclear contingency forecasting strategies. Based on result findings and observations, this study concludes that contingency should be estimated based on the scientific approach in place of a subjective approach to address project risks adequately, this along contingency consideration should be an integral part of the project risk assessment and should be effectively utilised during the execution stage. Keywords: Contingency, Cost Overruns, Indian Construction Projects, Operational and Financial Performance, Project Risk.
Title: Contingency Management in Indian Construction Projects
Description:
The successful completion of Indian construction projects possesses an inherent uncertainty due to the nature of the construction industry along with prevailing tepid recovery of the Indian economy, which has made it difficult for construction companies to achieve required operational and financial performance.
This necessitates having accurate project cost estimation and efficient contingency management to shield unknown project risk and address cost overrun problems.
Therefore, this study aims to assess the current state, the issues faced in contingency management and evaluating the effectiveness of contingency in overcoming cost overrun problems in Indian construction companies.
The study preferred a quantitative approach in capturing the required data by using structured questionnaires collected from 100 Indian construction companies (of contractors, vendors/suppliers, customers, and consultants) out of 335 companies with a response rate of 29.
85%.
This, along with archival data analysis of 50 Indian construction projects completed between Calendar Year (CY) 2014 to 2019.
The captured data were analysed using simple statistical tools like Relative Importance Index (RII), mean score, standard deviation and ranking methods to ensure relevant results aligned with research objectives.
The result findings of the study revealed that 60% of Indian construction companies preferred the traditional percentage method for contingency sum percentage addition to estimated project cost (a subjective approach based on the historical project performance) which may not be adequate in overcoming cost overrun problems.
Archival data analysis found that contingency consideration was effective in accommodating cost overrun problems in 9 (18%) projects out of 50 projects.
The study further found that contingency was utilised in an unplanned mode and having unclear contingency forecasting strategies.
Based on result findings and observations, this study concludes that contingency should be estimated based on the scientific approach in place of a subjective approach to address project risks adequately, this along contingency consideration should be an integral part of the project risk assessment and should be effectively utilised during the execution stage.
Keywords: Contingency, Cost Overruns, Indian Construction Projects, Operational and Financial Performance, Project Risk.

Related Results

Contingency Planning For Offshore Blowouts
Contingency Planning For Offshore Blowouts
ABSTRACT This paper describes requirements for blowout contingency planning with emphasis on planning for offshore blowouts. The contents are also generally appli...
Discourse on the mode of Serendipity in Travel Narrarive: Focusing on the contingency of Kuki Shuzo
Discourse on the mode of Serendipity in Travel Narrarive: Focusing on the contingency of Kuki Shuzo
This study examined serendipity that provides admiration, happiness, and continuity of happiness in travel. To this end, we used the concept and system of the contingency presented...
Dual-Route Processing of Social Interactions: Dissociating Domain-General and Domain-Specific Mechanisms in Visual Search
Dual-Route Processing of Social Interactions: Dissociating Domain-General and Domain-Specific Mechanisms in Visual Search
Efficiently perceiving social interactions is fundamental to human social cognition, yet the underlying mechanisms remain contested. Domain-specific theories propose specialized pr...
Contingency Management Practices of Public Elementary Schools in Laguna
Contingency Management Practices of Public Elementary Schools in Laguna
This study aimed to determine and discuss the importance of contingency management strategies in the Public Elementary Schools in Laguna to improve the work engagement and performa...
Indo-Anglian: Connotations and Denotations
Indo-Anglian: Connotations and Denotations
A different name than English literature, ‘Anglo-Indian Literature’, was given to the body of literature in English that emerged on account of the British interaction with India un...
Mitigation Approach for Significant Causes of Contractor’s Delays in Construction Projects in Sri Lanka
Mitigation Approach for Significant Causes of Contractor’s Delays in Construction Projects in Sri Lanka
The construction industry has a dynamic and complex environment. The successful completion of a construction project depends on various factors. Accordingly, construction delay is ...
Unveiling Construction Quality Factors: Insights from Asian Economy's Building Projects
Unveiling Construction Quality Factors: Insights from Asian Economy's Building Projects
Economic growth of any country depends on the construction projects and industry in the region. Therefore, the construction industry in Pakistan is directly related to quality and ...
An Affective Computing Multilayer Cognitive Architecture for Evolutionary Cognitive Robotics
An Affective Computing Multilayer Cognitive Architecture for Evolutionary Cognitive Robotics
<p>Robots are entering our daily lives from self-driving cars to health-care robots. Historically, pre-programmed robots were vulnerable to changing conditions in daily life,...

Back to Top