Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry
View through CrossRef
Many construction projects exceed time and budget. The Saudi Arabian construction projects are not an exception to this phenomenon. However, the causes of time and cost overrun of Saudi Arabian oil and gas construction projects have never been studied. Thus, this paper endeavors to investigate the main causes of time and cost overrun in Saudi Arabian oil and gas construction projects. Thirty-eight causes of time and cost overrun were identified through the literature and an interview. Responses from 48 professionals based in the Eastern Province of Saudi Arabia were obtained. The respondents were solicited to evaluate the significance of the causes, which were then ranked and a test of agreement was conducted. All survey participants agreed that the five major causes of time and cost overrun, combined, were found to be “changing of design and scope by client during construction”, “poor planning and scheduling of project”, “design errors”, “Inadequate comprehension of scope of work at the bidding stage”, and “underestimating of cost and schedules/overestimating of benefits”. On the other hand, the major cause of time overrun was found to be “changing of design and scope by client during construction”. Finally, the major cause of cost overrun was found to be “underestimating of cost and schedules/overestimating of benefits”, respectively. The findings of this study will be beneficial to project stakeholders who must operate in an industry that is highly sensitive. The findings will also facilitate organizations planning to conduct construction projects in the Saudi Arabian oil and gas industry.
Title: Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry
Description:
Many construction projects exceed time and budget.
The Saudi Arabian construction projects are not an exception to this phenomenon.
However, the causes of time and cost overrun of Saudi Arabian oil and gas construction projects have never been studied.
Thus, this paper endeavors to investigate the main causes of time and cost overrun in Saudi Arabian oil and gas construction projects.
Thirty-eight causes of time and cost overrun were identified through the literature and an interview.
Responses from 48 professionals based in the Eastern Province of Saudi Arabia were obtained.
The respondents were solicited to evaluate the significance of the causes, which were then ranked and a test of agreement was conducted.
All survey participants agreed that the five major causes of time and cost overrun, combined, were found to be “changing of design and scope by client during construction”, “poor planning and scheduling of project”, “design errors”, “Inadequate comprehension of scope of work at the bidding stage”, and “underestimating of cost and schedules/overestimating of benefits”.
On the other hand, the major cause of time overrun was found to be “changing of design and scope by client during construction”.
Finally, the major cause of cost overrun was found to be “underestimating of cost and schedules/overestimating of benefits”, respectively.
The findings of this study will be beneficial to project stakeholders who must operate in an industry that is highly sensitive.
The findings will also facilitate organizations planning to conduct construction projects in the Saudi Arabian oil and gas industry.
Related Results
A BESPOKE APPROACH FOR RELATING MATERIAL WASTE TO COST OVERRUN IN THE CONSTRUCTION INDUSTRY
A BESPOKE APPROACH FOR RELATING MATERIAL WASTE TO COST OVERRUN IN THE CONSTRUCTION INDUSTRY
The problems of material waste and cost overruns are common in the construction industry. These problems occur at different stages of a construction project, from planning, design ...
ANALISIS COST OVERRUNS PADA PROYEK X
ANALISIS COST OVERRUNS PADA PROYEK X
Industri konstruksi merupakan salah satu sektor penting dalam perekonomian suatu negara. Sektor ini berperan dalam pembangunan infrastruktur, sarana dan prasarana, serta berbagai f...
Manager Of Supply Planning And Projects
Manager Of Supply Planning And Projects
Abstract
The Southern California Gas Company is responsible for providing gas service to 12 million southern Californians. SoCal Gas, like other major gas distrib...
Migration of Reservoir Fluids
Migration of Reservoir Fluids
Abstract
The application of reservoir and production engineering experience to problems of migration and accumulation of oil and gas, is presented. The principle ...
Revisiting Causative Factors of Project Cost Overrun in Building Construction Projects in Nigeria
Revisiting Causative Factors of Project Cost Overrun in Building Construction Projects in Nigeria
Abstract
The growing need for construction of all types coupled with a tight monetary supply has provided the construction industry with a big challenge to cut cost....
Possibility of Applying Arabian Management Theory
Possibility of Applying Arabian Management Theory
<p>The research aims at examining the possibility of applying Arabian management theory by measuring the impact of Arabian management theory pillars (service concept, counsel...
Critical Gas Saturation During Depressurisation and its Importance in the Brent Field
Critical Gas Saturation During Depressurisation and its Importance in the Brent Field
Critical Gas Saturation During Depressurisation and its Importance in the Brent Field.
Abstract
After some 20 years of pressure ...
CAUSES OF TIME OVERRUN IN ROAD CONSTRUCTION PROJECTS
CAUSES OF TIME OVERRUN IN ROAD CONSTRUCTION PROJECTS
Time overrun is a situation in which construction project exceeds the specified completion date or the period agreed upon by the parties for handover. The concept is also known as ...