Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

PENYEBAB COST OVERRUN PADA PROYEK POOL BUS

View through CrossRef
Cost overrun is a common problem in construction projects that can cause losses for both contractors and project owners. Construction projects play an important role in supporting infrastructural development. This study aims to analyze the dominant factors causing cost overrun based on data from identification and interviews on construction projects. The research method uses a qualitative descriptive approach by analyzing cost overrun factors obtained from literature studies and the experiences of project practitioners. The research data consists of 42 factors causing cost overrun which are then analyzed based on their level of influence on project cost overruns. The results show that the dominant factors causing cost overruns include unrealistic project schedules, design inconsistencies with field conditions, construction method errors, inaccurate cost estimates, and rework. These factors cause project implementation costs to increase due to additional work, delays in implementation, and increased material and labor costs. In addition, lack of coordination between project parties and weak supervision also increase the risk of cost overruns. Efforts to control costs and minimize the risk of cost overruns in construction projects contribute to the realization of infrastructure development, including transportation services, that are efficient, high-quality and sustainable. Abstrak Cost overrun merupakan permasalahan umum dalam proyek konstruksi yang dapat menyebabkan kerugian bagi kontraktor maupun pemilik proyek. Proyek konstruksi memiliki peran penting dalam mendukung infrastructural development. Penelitian ini bertujuan untuk menganalisis faktor-faktor dominan penyebab cost overrun berdasarkan data hasil identifikasi dan wawancara pada proyek konstruksi. Metode penelitian menggunakan pendekatan deskriptif kualitatif dengan menganalisis faktor-faktor cost overrun yang diperoleh dari studi literatur dan pengalaman praktisi proyek. Data penelitian terdiri dari 42 faktor penyebab cost overrun yang kemudian dianalisis berdasarkan tingkat pengaruhnya terhadap pembengkakan biaya proyek. Hasil penelitian menunjukkan bahwa faktor dominan penyebab cost overrun meliputi jadwal proyek yang tidak realistis, ketidaksesuaian desain dengan kondisi lapangan, kesalahan metode konstruksi, estimasi biaya yang tidak akurat, dan pekerjaan ulang (rework). Faktor-faktor tersebut menyebabkan biaya pelaksanaan proyek meningkat akibat adanya pekerjaan tambahan, keterlambatan pelaksanaan, serta peningkatan biaya material dan tenaga kerja. Selain itu, kurangnya koordinasi antar pihak proyek dan lemahnya pengawasan juga meningkatkan risiko terjadinya cost overrun. Upaya pengendalian biaya dan minimalisasi risiko cost overrun pada proyek konstruksi berkontribusi terhadap terwujudnya pembangunan infrastruktur, termasuk layanan transportasi, yang efisien, berkualitas, dan berkelanjutan.
Title: PENYEBAB COST OVERRUN PADA PROYEK POOL BUS
Description:
Cost overrun is a common problem in construction projects that can cause losses for both contractors and project owners.
Construction projects play an important role in supporting infrastructural development.
This study aims to analyze the dominant factors causing cost overrun based on data from identification and interviews on construction projects.
The research method uses a qualitative descriptive approach by analyzing cost overrun factors obtained from literature studies and the experiences of project practitioners.
The research data consists of 42 factors causing cost overrun which are then analyzed based on their level of influence on project cost overruns.
The results show that the dominant factors causing cost overruns include unrealistic project schedules, design inconsistencies with field conditions, construction method errors, inaccurate cost estimates, and rework.
These factors cause project implementation costs to increase due to additional work, delays in implementation, and increased material and labor costs.
In addition, lack of coordination between project parties and weak supervision also increase the risk of cost overruns.
Efforts to control costs and minimize the risk of cost overruns in construction projects contribute to the realization of infrastructure development, including transportation services, that are efficient, high-quality and sustainable.
Abstrak Cost overrun merupakan permasalahan umum dalam proyek konstruksi yang dapat menyebabkan kerugian bagi kontraktor maupun pemilik proyek.
Proyek konstruksi memiliki peran penting dalam mendukung infrastructural development.
Penelitian ini bertujuan untuk menganalisis faktor-faktor dominan penyebab cost overrun berdasarkan data hasil identifikasi dan wawancara pada proyek konstruksi.
Metode penelitian menggunakan pendekatan deskriptif kualitatif dengan menganalisis faktor-faktor cost overrun yang diperoleh dari studi literatur dan pengalaman praktisi proyek.
Data penelitian terdiri dari 42 faktor penyebab cost overrun yang kemudian dianalisis berdasarkan tingkat pengaruhnya terhadap pembengkakan biaya proyek.
Hasil penelitian menunjukkan bahwa faktor dominan penyebab cost overrun meliputi jadwal proyek yang tidak realistis, ketidaksesuaian desain dengan kondisi lapangan, kesalahan metode konstruksi, estimasi biaya yang tidak akurat, dan pekerjaan ulang (rework).
Faktor-faktor tersebut menyebabkan biaya pelaksanaan proyek meningkat akibat adanya pekerjaan tambahan, keterlambatan pelaksanaan, serta peningkatan biaya material dan tenaga kerja.
Selain itu, kurangnya koordinasi antar pihak proyek dan lemahnya pengawasan juga meningkatkan risiko terjadinya cost overrun.
Upaya pengendalian biaya dan minimalisasi risiko cost overrun pada proyek konstruksi berkontribusi terhadap terwujudnya pembangunan infrastruktur, termasuk layanan transportasi, yang efisien, berkualitas, dan berkelanjutan.

Related Results

Analisis Faktor Penyebab Pembengkakan Biayakonstruksi (Cost Overrun) Pada Proyek Konstruksi Di Kota Medan
Analisis Faktor Penyebab Pembengkakan Biayakonstruksi (Cost Overrun) Pada Proyek Konstruksi Di Kota Medan
Pelaksanaan proyek konstruksi di Kota Medan tidak terlepas dari risiko terjadinya cost overrun, sehingga penting menganalisis faktor penyebab tersebut untuk mengantisipasi terjadin...
ANALISIS COST OVERRUNS PADA PROYEK X
ANALISIS COST OVERRUNS PADA PROYEK X
Industri konstruksi merupakan salah satu sektor penting dalam perekonomian suatu negara. Sektor ini berperan dalam pembangunan infrastruktur, sarana dan prasarana, serta berbagai f...
Analisis Estimasi Penyelesaian Proyek Konstruksi terhadap Waktu dan Biaya
Analisis Estimasi Penyelesaian Proyek Konstruksi terhadap Waktu dan Biaya
Proyek konstruksi merupakan kegiatan yang memiliki tingkat kompleksitas tinggi, sehingga sering terjadi keterlambatan penyelesaian proyek maupun pembengkakan biaya akibat sistem ma...
Analisa Indikasi Penyebab Pembengkakan Biaya (Cost Overrun) Pada Proyek Pembangunan Bendungan Lau Simeme
Analisa Indikasi Penyebab Pembengkakan Biaya (Cost Overrun) Pada Proyek Pembangunan Bendungan Lau Simeme
Pembangunan konstruksi di Indonesia semakin pesat sejalan dengan pemenuhan kebutuhan dasar manusia. Dalam pelaksanaan proyek konstruksi banyak dijumpai proyek yang mengalami pemben...
Analisis Kapasitor Bank Untuk Memperbaiki Tegangan
Analisis Kapasitor Bank Untuk Memperbaiki Tegangan
Tenaga Listrik disalurkan kekonsumen melalui sistem tenaga listrik yang terdiri dari beberapa sub sistem yaitu  pembangkit, transmisi, dan distribusi. Penyulang Gurami Gardu Induk ...
Aplikasi Metode Earned Value Management Proyek Warehouse
Aplikasi Metode Earned Value Management Proyek Warehouse
Earned Value Management (EVM) adalah suatu pendekatan yang digunakan untuk mengukur dan mengelola kinerja proyek dengan membandingkan nilai sebenarnya yang telah dikerjakan dengan ...
IMPLEMENTASI DASHBOARD PROYEK DENGAN SISTEM RBAC PADA PT.XYZ
IMPLEMENTASI DASHBOARD PROYEK DENGAN SISTEM RBAC PADA PT.XYZ
Dashboard proyek adalah kumpulan data utama, informasi kualitatif, dan visual yang merangkum portofolio proyek. Dashboard ini mengambil informasi yang tersebar terkait semua bagian...
Pelayanan Bus Patas dan Ekonomi Pada Trayek Antar Kota
Pelayanan Bus Patas dan Ekonomi Pada Trayek Antar Kota
Penelitian ini bertujuan untuk melakukan kajian kinerja pelayanan bus antar kota cepat terbatas (patas) dan ekonomi. Dalam pengambilan data, digunakan skala likert (numerik) untuk ...

Back to Top