Analysis of Cost Overrun and Schedule Delays of Infrastructure Projects in Low Income Economies: Case Studies in Ethiopia

View through CrossRef
Today, several developing countries struggle to improve the cost and time performances of major infrastructure works due to various reasons. Cost overrun and delay are one of the major challenges being faced by the construction and infrastructure sector. Hence, the aim of this study is to explore the extent of cost overrun and schedule delays in building and road infrastructure projects across the Ethiopian construction industry. Primary data were collected through a structured questionnaire survey to evaluate the potential risks leading to those challenges. Various data analysis tools were employed, to investigate the critical causes of cost overrun and delays in infrastructure projects. The findings reveal that the minimum cost overrun for building construction projects is found to be 2%, whereas the maximum and average cost overruns are 248% and 35%, respectively. For road infrastructure projects, the minimum, maximum, and average cost overruns are found to be 1%, 61%, and 18%, respectively. Similarly, the minimum, maximum, and average delays recorded in building construction projects are 9%, 802%, and 143%, respectively, whereas, in road infrastructure projects, the minimum delay is found to be 3%, the maximum delay is 312%, and an average schedule delay of 110% is recorded. In addition, the top risk factors leading to cost overrun in infrastructure projects are inflation, inaccurate cost estimates, and variations, whereas the major risks causing schedule delays are variations, economic conditions, and escalation of material prices. Further, practical implications and key recommendations were provided to curb cost overrun and delay in infrastructure projects.
Title: Analysis of Cost Overrun and Schedule Delays of Infrastructure Projects in Low Income Economies: Case Studies in Ethiopia
Description:
Today, several developing countries struggle to improve the cost and time performances of major infrastructure works due to various reasons.
Cost overrun and delay are one of the major challenges being faced by the construction and infrastructure sector.
Hence, the aim of this study is to explore the extent of cost overrun and schedule delays in building and road infrastructure projects across the Ethiopian construction industry.
Primary data were collected through a structured questionnaire survey to evaluate the potential risks leading to those challenges.
Various data analysis tools were employed, to investigate the critical causes of cost overrun and delays in infrastructure projects.
The findings reveal that the minimum cost overrun for building construction projects is found to be 2%, whereas the maximum and average cost overruns are 248% and 35%, respectively.
For road infrastructure projects, the minimum, maximum, and average cost overruns are found to be 1%, 61%, and 18%, respectively.
Similarly, the minimum, maximum, and average delays recorded in building construction projects are 9%, 802%, and 143%, respectively, whereas, in road infrastructure projects, the minimum delay is found to be 3%, the maximum delay is 312%, and an average schedule delay of 110% is recorded.
In addition, the top risk factors leading to cost overrun in infrastructure projects are inflation, inaccurate cost estimates, and variations, whereas the major risks causing schedule delays are variations, economic conditions, and escalation of material prices.
Further, practical implications and key recommendations were provided to curb cost overrun and delay in infrastructure projects.

Related Results

PENYEBAB COST OVERRUN PADA PROYEK POOL BUS
PENYEBAB COST OVERRUN PADA PROYEK POOL BUS
Cost overrun is a common problem in construction projects that can cause losses for both contractors and project owners. Construction projects play an important role in supporting ...
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Abstarct Introduction Isolated brain hydatid disease (BHD) is an extremely rare form of echinococcosis. A prompt and timely diagnosis is a crucial step in disease management. This ...
Analisis Faktor Penyebab Pembengkakan Biayakonstruksi (Cost Overrun) Pada Proyek Konstruksi Di Kota Medan
Analisis Faktor Penyebab Pembengkakan Biayakonstruksi (Cost Overrun) Pada Proyek Konstruksi Di Kota Medan
Pelaksanaan proyek konstruksi di Kota Medan tidak terlepas dari risiko terjadinya cost overrun, sehingga penting menganalisis faktor penyebab tersebut untuk mengantisipasi terjadin...
Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry
Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry
Many construction projects exceed time and budget. The Saudi Arabian construction projects are not an exception to this phenomenon. However, the causes of time and cost overrun of ...
A BESPOKE APPROACH FOR RELATING MATERIAL WASTE TO COST OVERRUN IN THE CONSTRUCTION INDUSTRY
A BESPOKE APPROACH FOR RELATING MATERIAL WASTE TO COST OVERRUN IN THE CONSTRUCTION INDUSTRY
The problems of material waste and cost overruns are common in the construction industry. These problems occur at different stages of a construction project, from planning, design ...
ANALISIS COST OVERRUNS PADA PROYEK X
ANALISIS COST OVERRUNS PADA PROYEK X
Industri konstruksi merupakan salah satu sektor penting dalam perekonomian suatu negara. Sektor ini berperan dalam pembangunan infrastruktur, sarana dan prasarana, serta berbagai f...
Breast Carcinoma within Fibroadenoma: A Systematic Review
Breast Carcinoma within Fibroadenoma: A Systematic Review
Abstract Introduction Fibroadenoma is the most common benign breast lesion; however, it carries a potential risk of malignant transformation. This systematic review provides an ove...

Back to Top