A BESPOKE APPROACH FOR RELATING MATERIAL WASTE TO COST OVERRUN IN THE CONSTRUCTION INDUSTRY
View through CrossRef
The problems of material waste and cost overruns are common in the construction industry. These problems occur at different stages of a construction project, from planning, design to project completion. The argument on how to eliminate cost overrun has been on-going for the past 70 years as on-site wastage of materials leads to increase in the final project cost. This paper examines the relationship between the causes of material waste and those of cost overrun at the pre-contract and post-contract stages of a project. The desktop methodological approach was firstly adopted in comparing the causes of material waste and those of cost overruns from the literature, in order to determine the possible relationship. Subsequently, interviews were purposively conducted with construction professionals within Abuja, Nigeria, in order to verify the literature based information. The result reveals that all the causes of material waste also cause cost overrun at the pre-contract and the post-contract stages of a project. 96.88% and 81.81% of the causes of cost overrun also cause material waste at the pre-contract and post-contract stages respectively. Other causes which are not related are mostly, the micro-economic and macro-economic factors. These results are not different from those of the interviews conducted with professionals and summarised in the tick box. It was also found that to achieve Effective Construction Material Waste Management (ECMWM) for any construction project, material waste must be controlled at its sources and causes, and at different stages of a project. Based on these findings, it can be concluded that effective management of material waste would translate into a reduction in the level of project cost overrun. The study recommends that construction-project managers, as well as the construction practitioners should encourage the management of material-waste causes, as it has the potential to minimise cost overrun for projects.
University of Cape Town
Title: A BESPOKE APPROACH FOR RELATING MATERIAL WASTE TO COST OVERRUN IN THE CONSTRUCTION INDUSTRY
Description:
The problems of material waste and cost overruns are common in the construction industry.
These problems occur at different stages of a construction project, from planning, design to project completion.
The argument on how to eliminate cost overrun has been on-going for the past 70 years as on-site wastage of materials leads to increase in the final project cost.
This paper examines the relationship between the causes of material waste and those of cost overrun at the pre-contract and post-contract stages of a project.
The desktop methodological approach was firstly adopted in comparing the causes of material waste and those of cost overruns from the literature, in order to determine the possible relationship.
Subsequently, interviews were purposively conducted with construction professionals within Abuja, Nigeria, in order to verify the literature based information.
The result reveals that all the causes of material waste also cause cost overrun at the pre-contract and the post-contract stages of a project.
96.
88% and 81.
81% of the causes of cost overrun also cause material waste at the pre-contract and post-contract stages respectively.
Other causes which are not related are mostly, the micro-economic and macro-economic factors.
These results are not different from those of the interviews conducted with professionals and summarised in the tick box.
It was also found that to achieve Effective Construction Material Waste Management (ECMWM) for any construction project, material waste must be controlled at its sources and causes, and at different stages of a project.
Based on these findings, it can be concluded that effective management of material waste would translate into a reduction in the level of project cost overrun.
The study recommends that construction-project managers, as well as the construction practitioners should encourage the management of material-waste causes, as it has the potential to minimise cost overrun for projects.
.
Related Results
PENYEBAB COST OVERRUN PADA PROYEK POOL BUS
PENYEBAB COST OVERRUN PADA PROYEK POOL BUS
Cost overrun is a common problem in construction projects that can cause losses for both contractors and project owners. Construction projects play an important role in supporting ...
Water Trash Collector
Water Trash Collector
In today day to day life, approximately 71% of the Earth's surface is covered by Without affecting significant role that technology plays in our modern world, environmental and wat...
Analisis Faktor Penyebab Pembengkakan Biayakonstruksi (Cost Overrun) Pada Proyek Konstruksi Di Kota Medan
Analisis Faktor Penyebab Pembengkakan Biayakonstruksi (Cost Overrun) Pada Proyek Konstruksi Di Kota Medan
Pelaksanaan proyek konstruksi di Kota Medan tidak terlepas dari risiko terjadinya cost overrun, sehingga penting menganalisis faktor penyebab tersebut untuk mengantisipasi terjadin...
Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry
Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry
Many construction projects exceed time and budget. The Saudi Arabian construction projects are not an exception to this phenomenon. However, the causes of time and cost overrun of ...
DENGUE OUTBREAK -IS THE PANIC JUSTIFIED ?
DENGUE OUTBREAK -IS THE PANIC JUSTIFIED ?
In this era of startling developments in the medical field there remains a serious worry about the hazardous potential of various by products which if not properly addre...
PENGETAHUAN MAHASISWA TATA BUSANA TENTANG ZERO WASTE PATTERN
PENGETAHUAN MAHASISWA TATA BUSANA TENTANG ZERO WASTE PATTERN
Textile waste is one of the 2nd largest types of waste in the world. The increasing amount of textile waste will have an impact on the environment. There has not been much developm...
Analysis of Cost Overrun and Schedule Delays of Infrastructure Projects in Low Income Economies: Case Studies in Ethiopia
Analysis of Cost Overrun and Schedule Delays of Infrastructure Projects in Low Income Economies: Case Studies in Ethiopia
Today, several developing countries struggle to improve the cost and time performances of major infrastructure works due to various reasons. Cost overrun and delay are one of the m...
Solid waste characterization of domestic areas of urban Lahore
Solid waste characterization of domestic areas of urban Lahore
Solid waste management in urban areas of Pakistan has become a serious environmental concern. This study aimed at characterizing and quantifying the urban domestic solid waste from...