A BESPOKE APPROACH FOR RELATING MATERIAL WASTE TO COST OVERRUN IN THE CONSTRUCTION INDUSTRY
View through CrossRef
The problems of material waste and cost overruns are common in the construction industry. These problems occur at different stages of a construction project, from planning, design to project completion. The argument on how to eliminate cost overrun has been on-going for the past 70 years as on-site wastage of materials leads to increase in the final project cost. This paper examines the relationship between the causes of material waste and those of cost overrun at the pre-contract and post-contract stages of a project. The desktop methodological approach was firstly adopted in comparing the causes of material waste and those of cost overruns from the literature, in order to determine the possible relationship. Subsequently, interviews were purposively conducted with construction professionals within Abuja, Nigeria, in order to verify the literature based information. The result reveals that all the causes of material waste also cause cost overrun at the pre-contract and the post-contract stages of a project. 96.88% and 81.81% of the causes of cost overrun also cause material waste at the pre-contract and post-contract stages respectively. Other causes which are not related are mostly, the micro-economic and macro-economic factors. These results are not different from those of the interviews conducted with professionals and summarised in the tick box. It was also found that to achieve Effective Construction Material Waste Management (ECMWM) for any construction project, material waste must be controlled at its sources and causes, and at different stages of a project. Based on these findings, it can be concluded that effective management of material waste would translate into a reduction in the level of project cost overrun. The study recommends that construction-project managers, as well as the construction practitioners should encourage the management of material-waste causes, as it has the potential to minimise cost overrun for projects.
University of Cape Town
Title: A BESPOKE APPROACH FOR RELATING MATERIAL WASTE TO COST OVERRUN IN THE CONSTRUCTION INDUSTRY
Description:
The problems of material waste and cost overruns are common in the construction industry.
These problems occur at different stages of a construction project, from planning, design to project completion.
The argument on how to eliminate cost overrun has been on-going for the past 70 years as on-site wastage of materials leads to increase in the final project cost.
This paper examines the relationship between the causes of material waste and those of cost overrun at the pre-contract and post-contract stages of a project.
The desktop methodological approach was firstly adopted in comparing the causes of material waste and those of cost overruns from the literature, in order to determine the possible relationship.
Subsequently, interviews were purposively conducted with construction professionals within Abuja, Nigeria, in order to verify the literature based information.
The result reveals that all the causes of material waste also cause cost overrun at the pre-contract and the post-contract stages of a project.
96.
88% and 81.
81% of the causes of cost overrun also cause material waste at the pre-contract and post-contract stages respectively.
Other causes which are not related are mostly, the micro-economic and macro-economic factors.
These results are not different from those of the interviews conducted with professionals and summarised in the tick box.
It was also found that to achieve Effective Construction Material Waste Management (ECMWM) for any construction project, material waste must be controlled at its sources and causes, and at different stages of a project.
Based on these findings, it can be concluded that effective management of material waste would translate into a reduction in the level of project cost overrun.
The study recommends that construction-project managers, as well as the construction practitioners should encourage the management of material-waste causes, as it has the potential to minimise cost overrun for projects.
.
Related Results
Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry
Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry
Many construction projects exceed time and budget. The Saudi Arabian construction projects are not an exception to this phenomenon. However, the causes of time and cost overrun of ...
PENGETAHUAN MAHASISWA TATA BUSANA TENTANG ZERO WASTE PATTERN
PENGETAHUAN MAHASISWA TATA BUSANA TENTANG ZERO WASTE PATTERN
Textile waste is one of the 2nd largest types of waste in the world. The increasing amount of textile waste will have an impact on the environment. There has not been much developm...
DENGUE OUTBREAK -IS THE PANIC JUSTIFIED ?
DENGUE OUTBREAK -IS THE PANIC JUSTIFIED ?
In this era of startling developments in the medical field there remains a serious worry about the hazardous potential of various by products which if not properly addre...
ANALISIS COST OVERRUNS PADA PROYEK X
ANALISIS COST OVERRUNS PADA PROYEK X
Industri konstruksi merupakan salah satu sektor penting dalam perekonomian suatu negara. Sektor ini berperan dalam pembangunan infrastruktur, sarana dan prasarana, serta berbagai f...
EVALUASI SISTEM PENGENDALIAN MANAJEMEN PADA PELAYANAN PERSAMPAHAN PEMERINTAH KABUPATEN TEMANGGUNG
EVALUASI SISTEM PENGENDALIAN MANAJEMEN PADA PELAYANAN PERSAMPAHAN PEMERINTAH KABUPATEN TEMANGGUNG
Garbage is a problem that is still homework for most areas, starting from the household scale, village/kelurahan, district, and even national scale. A management control system in ...
Waste Management Practices Influence on Operating Cost among Selected Classified Hotels in Nakuru County, Kenya
Waste Management Practices Influence on Operating Cost among Selected Classified Hotels in Nakuru County, Kenya
The world is currently battling the challenge of environmental degradation which is rising at an alarming rate. The situation is greatly attributed to poor waste management. The ho...
Revisiting Causative Factors of Project Cost Overrun in Building Construction Projects in Nigeria
Revisiting Causative Factors of Project Cost Overrun in Building Construction Projects in Nigeria
Abstract
The growing need for construction of all types coupled with a tight monetary supply has provided the construction industry with a big challenge to cut cost....
Contingency Management in Indian Construction Projects
Contingency Management in Indian Construction Projects
The successful completion of Indian construction projects possesses an inherent uncertainty due to the nature of the construction industry along with prevailing tepid recovery of t...