Cost Overrun Factor of Toll Road Project Construction
View through CrossRef
Abstract
Results in more than 45 studies of infrastructure projects in 20 countries that ran overestimate. For rail projects, they predict average cost increases of 45%, for fixed-line projects (tunnels and bridges), of 34%, and for highway projects, of 30%. Indonesia is one of the 20 nations on 5 continents where cost overruns are a common occurrence. Cost overruns are one of the problems faced by most construction projects in Indonesia. Unexpected budget cost overruns can create many problems in the project. Therefore, every stakeholder in the project needs to have a good understanding of factors that cause cost overruns to avoid or minimize it risks in the project. The purpose of this study is to identify the factors that cause cost overrun on a project and analyze the factors that are most influential on the occurrence of cost overrun on construction projects. This study used a systematic literature review to collect data from previous studies. This study resulted in 6 management elements, consisting of 85 variables identified in this study. 6 management elements factors, including material factors, labor factors, equipment factors, subcontractor factors, financial factors, and external factors. This is a fairly broad category that includes projects. The most cause factor of cost overrun land acquisition problems
Title: Cost Overrun Factor of Toll Road Project Construction
Description:
Abstract
Results in more than 45 studies of infrastructure projects in 20 countries that ran overestimate.
For rail projects, they predict average cost increases of 45%, for fixed-line projects (tunnels and bridges), of 34%, and for highway projects, of 30%.
Indonesia is one of the 20 nations on 5 continents where cost overruns are a common occurrence.
Cost overruns are one of the problems faced by most construction projects in Indonesia.
Unexpected budget cost overruns can create many problems in the project.
Therefore, every stakeholder in the project needs to have a good understanding of factors that cause cost overruns to avoid or minimize it risks in the project.
The purpose of this study is to identify the factors that cause cost overrun on a project and analyze the factors that are most influential on the occurrence of cost overrun on construction projects.
This study used a systematic literature review to collect data from previous studies.
This study resulted in 6 management elements, consisting of 85 variables identified in this study.
6 management elements factors, including material factors, labor factors, equipment factors, subcontractor factors, financial factors, and external factors.
This is a fairly broad category that includes projects.
The most cause factor of cost overrun land acquisition problems.
Related Results
A BESPOKE APPROACH FOR RELATING MATERIAL WASTE TO COST OVERRUN IN THE CONSTRUCTION INDUSTRY
A BESPOKE APPROACH FOR RELATING MATERIAL WASTE TO COST OVERRUN IN THE CONSTRUCTION INDUSTRY
The problems of material waste and cost overruns are common in the construction industry. These problems occur at different stages of a construction project, from planning, design ...
Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry
Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry
Many construction projects exceed time and budget. The Saudi Arabian construction projects are not an exception to this phenomenon. However, the causes of time and cost overrun of ...
Non-toll revenue potential to increase funding sources for toll road maintenance
Non-toll revenue potential to increase funding sources for toll road maintenance
The purpose of providing toll road infrastructure through Public-Private Partnerships (PPP) is to ensure that the private sector generates sufficient revenue to manage road operati...
ANALISA WAKTU PELAYANAN GARDU TOL CENGKARENG 2 DENGAN PTV VISSIM
ANALISA WAKTU PELAYANAN GARDU TOL CENGKARENG 2 DENGAN PTV VISSIM
Toll roads are affected by the service time on toll roads which have been stipulated by the Regulation of the Minister of Public Works No. 16 concerning Minimum Service Standards f...
ANALISIS COST OVERRUNS PADA PROYEK X
ANALISIS COST OVERRUNS PADA PROYEK X
Industri konstruksi merupakan salah satu sektor penting dalam perekonomian suatu negara. Sektor ini berperan dalam pembangunan infrastruktur, sarana dan prasarana, serta berbagai f...
Contingency Management in Indian Construction Projects
Contingency Management in Indian Construction Projects
The successful completion of Indian construction projects possesses an inherent uncertainty due to the nature of the construction industry along with prevailing tepid recovery of t...
CAUSES OF TIME OVERRUN IN ROAD CONSTRUCTION PROJECTS
CAUSES OF TIME OVERRUN IN ROAD CONSTRUCTION PROJECTS
Time overrun is a situation in which construction project exceeds the specified completion date or the period agreed upon by the parties for handover. The concept is also known as ...
Loss of Cysteine Rich domain was critical for evolution of heterodimerization in Toll proteins
Loss of Cysteine Rich domain was critical for evolution of heterodimerization in Toll proteins
Abstract
Toll proteins play roles in immunity/development which have largely remained conserved. However, there are differences in Toll biology as mammalian TLRs re...