Cost Overrun Factor of Toll Road Project Construction

View through CrossRef
Abstract Results in more than 45 studies of infrastructure projects in 20 countries that ran overestimate. For rail projects, they predict average cost increases of 45%, for fixed-line projects (tunnels and bridges), of 34%, and for highway projects, of 30%. Indonesia is one of the 20 nations on 5 continents where cost overruns are a common occurrence. Cost overruns are one of the problems faced by most construction projects in Indonesia. Unexpected budget cost overruns can create many problems in the project. Therefore, every stakeholder in the project needs to have a good understanding of factors that cause cost overruns to avoid or minimize it risks in the project. The purpose of this study is to identify the factors that cause cost overrun on a project and analyze the factors that are most influential on the occurrence of cost overrun on construction projects. This study used a systematic literature review to collect data from previous studies. This study resulted in 6 management elements, consisting of 85 variables identified in this study. 6 management elements factors, including material factors, labor factors, equipment factors, subcontractor factors, financial factors, and external factors. This is a fairly broad category that includes projects. The most cause factor of cost overrun land acquisition problems
Title: Cost Overrun Factor of Toll Road Project Construction
Description:
Abstract Results in more than 45 studies of infrastructure projects in 20 countries that ran overestimate.
For rail projects, they predict average cost increases of 45%, for fixed-line projects (tunnels and bridges), of 34%, and for highway projects, of 30%.
Indonesia is one of the 20 nations on 5 continents where cost overruns are a common occurrence.
Cost overruns are one of the problems faced by most construction projects in Indonesia.
Unexpected budget cost overruns can create many problems in the project.
Therefore, every stakeholder in the project needs to have a good understanding of factors that cause cost overruns to avoid or minimize it risks in the project.
The purpose of this study is to identify the factors that cause cost overrun on a project and analyze the factors that are most influential on the occurrence of cost overrun on construction projects.
This study used a systematic literature review to collect data from previous studies.
This study resulted in 6 management elements, consisting of 85 variables identified in this study.
6 management elements factors, including material factors, labor factors, equipment factors, subcontractor factors, financial factors, and external factors.
This is a fairly broad category that includes projects.
The most cause factor of cost overrun land acquisition problems.

Related Results

The Burden of Road Traffic Injuries: A Global Perspective
The Burden of Road Traffic Injuries: A Global Perspective
Introduction     Road Traffic Injury (RTI) pose a significant health challenge. It represents the eighth leading cause of death globally, prompting the UN to designate 2011-2020 as...
PENYEBAB COST OVERRUN PADA PROYEK POOL BUS
PENYEBAB COST OVERRUN PADA PROYEK POOL BUS
Cost overrun is a common problem in construction projects that can cause losses for both contractors and project owners. Construction projects play an important role in supporting ...
ANALISIS PERTIMBANGAN MAHKAMAH AGUNG DALAM MENGABULKAN KASASI TERDAKWA (STUDI PUTUSAN NOMOR 2959/K/PID.SUS/2022)
ANALISIS PERTIMBANGAN MAHKAMAH AGUNG DALAM MENGABULKAN KASASI TERDAKWA (STUDI PUTUSAN NOMOR 2959/K/PID.SUS/2022)
<p><em><span class="markedContent"><span style="left: calc(var(--scale-factor)*195.53px); top: calc(var(--scale-factor)*496.87px); font-size: calc(var(--scale-...
A BESPOKE APPROACH FOR RELATING MATERIAL WASTE TO COST OVERRUN IN THE CONSTRUCTION INDUSTRY
A BESPOKE APPROACH FOR RELATING MATERIAL WASTE TO COST OVERRUN IN THE CONSTRUCTION INDUSTRY
The problems of material waste and cost overruns are common in the construction industry. These problems occur at different stages of a construction project, from planning, design ...
Analisis Faktor Penyebab Pembengkakan Biayakonstruksi (Cost Overrun) Pada Proyek Konstruksi Di Kota Medan
Analisis Faktor Penyebab Pembengkakan Biayakonstruksi (Cost Overrun) Pada Proyek Konstruksi Di Kota Medan
Pelaksanaan proyek konstruksi di Kota Medan tidak terlepas dari risiko terjadinya cost overrun, sehingga penting menganalisis faktor penyebab tersebut untuk mengantisipasi terjadin...
Analysis of Cost Overrun and Schedule Delays of Infrastructure Projects in Low Income Economies: Case Studies in Ethiopia
Analysis of Cost Overrun and Schedule Delays of Infrastructure Projects in Low Income Economies: Case Studies in Ethiopia
Today, several developing countries struggle to improve the cost and time performances of major infrastructure works due to various reasons. Cost overrun and delay are one of the m...
KEDUDUKAN AHLI BAHASA DALAM PEMBUKTIAN PERKARA PENCEMARAN NAMA BAIK (STUDI PUTUSAN NOMOR: 47/PID.SUS/2019/PN. MGT)
KEDUDUKAN AHLI BAHASA DALAM PEMBUKTIAN PERKARA PENCEMARAN NAMA BAIK (STUDI PUTUSAN NOMOR: 47/PID.SUS/2019/PN. MGT)
<em><span id="page3R_mcid52" class="markedContent"><span style="left: calc(var(--scale-factor)*125.30px); top: calc(var(--scale-factor)*539.11px); font-size: calc(va...
Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry
Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry
Many construction projects exceed time and budget. The Saudi Arabian construction projects are not an exception to this phenomenon. However, the causes of time and cost overrun of ...