Kajian Geometri Jalan terhadap Peningkatan Produktivitas Alat Angkut Overbarden pada Penambangan Batubara PT Putra Perkasa Abadi Site AMI, Desa Muara Tuhup, Kecamatan Laung Tuhup, Kabupaten Murung Raya, Provinsi Kalimantan Tengah

View through CrossRef
Abstract. PT Putra Perkasa Abadi is a company engaged in mining services located in Muara Tuhup Village, Laung Tuhup District, Murung Raya Regency, Central Kalimantan Province.. Based on the actual geometry in the field, there is a transportation road geometry that is not up to standard, resulting in the failure to achieve the production target for overburden transportation of 207,064.70 tons/month. The research aims to analyze the calculation of the transportation road geometry from the Danum Pit to the Disposal South, including the width of straight roads and curves, cross slope, road grade, superelevation, and curvature radius based on the Ministerial Decree 1827/K/30/MEM/2018 and AASHTO. The research findings indicate a discrepancy in the road geometry, with 3 road segments having a grade exceeding 8%, while 5 out of 8 straight road segments and 5 out of 7 curve segments have widths below standard.  Cross slope and superelevation are also below standard, with 4 segments of cross slope greater than 4% and 3 curves having superelevation of less than 4%. As a result, the actual transportation production is only 134,772.38 Tons/Month against a target of 207,064.70 tons/month. After simulating road geometry improvements, transportation production increased to 217,454.17 Tons/Month. Abstrak. PT Putra Perkasa Abadi merupakan perusahaan yang bergerak di bidang jasa penambangan yang terletak di Desa Muara Tuhup, Kecamatan Laung Tuhup, Kabupaten Murung Raya, Provinsi Kalimantan Tengah. Berdasarkan geometri aktual di lapangan terdapat geometri jalan angkut yang belum standar, sehingga menyebabkan target produksi pengangkutan overburden  207.064,70 Ton/Bulan tidak tercapai. Adapun tujuan penelitian yang dilakukan yaitu analisis perhitungan geometri jalan angkut dari Pit Danum menuju Disposal South meliputi lebar jalan lurus dan tikungan, crossslope, grade jalan, superelevasi dan jari-jari tikungan berdasarkan Kepmen 1827/K/30/MEM/2018 dan AASHTO. Berdasarkan hasil penelitian ditemukan ketidaksesuaian geometri jalan, Terdapat 3 segmen jalan memiliki grade lebih 8%, sementara 5 dari 8 segmen jalan lurus dan 5 dari 7 segmen tikungan memiliki lebar dibawah standar. Cross slope dan superelevasi juga dibawah standar, dengan 4 segmen cross slope >4% dan 3 tikungan memiliki superelevasi <4%. Sehingga produksi pengangkutan aktual hanya 134.772,38 Ton/Bulan dari target 207.064,70 ton/bulan. Setelah dilakukanya simulasi perbaikan geometri jalan produksi pengangkutan mengalami peningkatan sebesar 217.454,17 Ton/Bulan.
Title: Kajian Geometri Jalan terhadap Peningkatan Produktivitas Alat Angkut Overbarden pada Penambangan Batubara PT Putra Perkasa Abadi Site AMI, Desa Muara Tuhup, Kecamatan Laung Tuhup, Kabupaten Murung Raya, Provinsi Kalimantan Tengah
Description:
Abstract.
PT Putra Perkasa Abadi is a company engaged in mining services located in Muara Tuhup Village, Laung Tuhup District, Murung Raya Regency, Central Kalimantan Province.
Based on the actual geometry in the field, there is a transportation road geometry that is not up to standard, resulting in the failure to achieve the production target for overburden transportation of 207,064.
70 tons/month.
The research aims to analyze the calculation of the transportation road geometry from the Danum Pit to the Disposal South, including the width of straight roads and curves, cross slope, road grade, superelevation, and curvature radius based on the Ministerial Decree 1827/K/30/MEM/2018 and AASHTO.
The research findings indicate a discrepancy in the road geometry, with 3 road segments having a grade exceeding 8%, while 5 out of 8 straight road segments and 5 out of 7 curve segments have widths below standard.
 Cross slope and superelevation are also below standard, with 4 segments of cross slope greater than 4% and 3 curves having superelevation of less than 4%.
As a result, the actual transportation production is only 134,772.
38 Tons/Month against a target of 207,064.
70 tons/month.
After simulating road geometry improvements, transportation production increased to 217,454.
17 Tons/Month.
Abstrak.
PT Putra Perkasa Abadi merupakan perusahaan yang bergerak di bidang jasa penambangan yang terletak di Desa Muara Tuhup, Kecamatan Laung Tuhup, Kabupaten Murung Raya, Provinsi Kalimantan Tengah.
Berdasarkan geometri aktual di lapangan terdapat geometri jalan angkut yang belum standar, sehingga menyebabkan target produksi pengangkutan overburden  207.
064,70 Ton/Bulan tidak tercapai.
Adapun tujuan penelitian yang dilakukan yaitu analisis perhitungan geometri jalan angkut dari Pit Danum menuju Disposal South meliputi lebar jalan lurus dan tikungan, crossslope, grade jalan, superelevasi dan jari-jari tikungan berdasarkan Kepmen 1827/K/30/MEM/2018 dan AASHTO.
Berdasarkan hasil penelitian ditemukan ketidaksesuaian geometri jalan, Terdapat 3 segmen jalan memiliki grade lebih 8%, sementara 5 dari 8 segmen jalan lurus dan 5 dari 7 segmen tikungan memiliki lebar dibawah standar.
Cross slope dan superelevasi juga dibawah standar, dengan 4 segmen cross slope >4% dan 3 tikungan memiliki superelevasi <4%.
Sehingga produksi pengangkutan aktual hanya 134.
772,38 Ton/Bulan dari target 207.
064,70 ton/bulan.
Setelah dilakukanya simulasi perbaikan geometri jalan produksi pengangkutan mengalami peningkatan sebesar 217.
454,17 Ton/Bulan.

Related Results

DAMPAK TEKNOLOGI TERHADAP PROSES BELAJAR MENGAJAR
DAMPAK TEKNOLOGI TERHADAP PROSES BELAJAR MENGAJAR
DAFTAR PUSTAKAAditama, M. H. R., &amp; Selfiardy, S. (2022). Kehidupan Mahasiswa Kuliah Sambil Bekerja di Masa Pandemi Covid-19. Kidspedia: Jurnal Pendidikan Anak Usia Dini, 3(...
Pengaruh Geometri Jalan Terhadap Produktivitas Alat Angkut
Pengaruh Geometri Jalan Terhadap Produktivitas Alat Angkut
Abstract. Based on the actual conditions in the field, there are several road geometries that are not in accordance with the standards resulting in high traffic density. This cause...
PERENCANAAN TAHAPAN PENAMBANGAN BULANAN PADA TAMBANG TERBUKA BATUBARA METODE OPEN PIT
PERENCANAAN TAHAPAN PENAMBANGAN BULANAN PADA TAMBANG TERBUKA BATUBARA METODE OPEN PIT
Pembukaan lokasi tambang memerlukan perencanaan dan perancangan tambang yang ekonomis. Rencana penambangan jangka panjang harus diuraikan ke dalam rencana penambangan jangka pendek...
ASSOCIATION OF THE SERUM LEVELS OF C-REACTIVE PROTEIN WITH ITS GENE POLYMORPHISMS AND ACUTE CORONARY SYNDROME
ASSOCIATION OF THE SERUM LEVELS OF C-REACTIVE PROTEIN WITH ITS GENE POLYMORPHISMS AND ACUTE CORONARY SYNDROME
Objectives To investigate the association of the serum levels of CRP with its gene polymorphisms and the risk of ACS in Chinese Han population in Sunan region. ...
Kajian Produktivitas Alat untuk Mengoptimalkan Hasil Produksi Overburden di PT. Karebet Mas Indonesia Site Kutai Energi Kalimantan Timur
Kajian Produktivitas Alat untuk Mengoptimalkan Hasil Produksi Overburden di PT. Karebet Mas Indonesia Site Kutai Energi Kalimantan Timur
Penambangan overburden dan batubara harus beriringan dan sejalan, karena dengan tingginya produktivitas overburden akan berpengaruh pada hasil produksi batubara. Penelitian ini ber...
KEPUASAN PENGGUNA JALAN TERHADAP PELAYANAN JALAN PROVINSI DI KALIMANTAN BARAT
KEPUASAN PENGGUNA JALAN TERHADAP PELAYANAN JALAN PROVINSI DI KALIMANTAN BARAT
Abstract   The quality of road services includes the performance of road infrastructure components, which include road pavement structures, road geometry, road complementary buil...

Back to Top