Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Well Intervention using MSV/DSV

View through CrossRef
Abstract Well intervention work through a rigid monobore riser from a dynamically positioned monohull vessel puts new challenges to the industry to ensure a safe and efficient intervention to the increasing number of subsea wells. Improved DP systems and modified riser systems and workover control systems are the key issues. Introduction Over a period of years we have seen the development of new and old oilfields applying an increasing number of subsea well solutions. Further, the development of 'smart wells' and a general decrease in production average of existing wells, an increasing demand for well intervention services in the future is anticipated. This is supported by several studies which conclude with a significant volume increase in well intervention services required in the years to come. More cost effective solutions than using anchored drill rigs will have to be established to reduce the total cost of servicing subsea wells. The solution which has been paid most attention and seems to be the most interesting alternative today is performing the intrevention work using a monohull vessel, like the Botnica concept, which has been developed to provide Operators with an alternative to both the conventional semisubmersible rig market and to other potential monohull solutions. This paper will briefly addresse the commercial aspects of a monohull vessel versus a semi submersible rig, a market driven situation which should be well known to the market. Then the paper will focus on the operational / technical challenges of (1) vessel motion and its impact on a rigid riser system when connected to a well and (2) dynamic positioning of a monohull, a subject which will be supported by testing data from the MSV Botnica which have installed and tested a new generation DP system. Well intervention work through a Subsea Wireline Lubricator provides less challenges to the monohull vessel concept than riser operations. Such operations has successfully been undertaken by other vessels and will not be addressed in this paper. Commercial aspects - monohull vessel versus semisubmersible rigs. A few months back it was acknowledged that well intervention services from a monohull vessel was likely to be provided at a significantly lower cost than from a semisubmersible rig. Comparative cost schedules between monohulls and semis are however depending on how the Operators calculate the cost of using a semi which is already on charter. Cost / benefit scenarios are also subject to fluctuating rates due to both short and long term changes in oil prices and the corresponding level of oilfield activities which impacts the utilisation of vessels and semis. Today we experience a change where rig rates are dropping and rigs are being laid up due to Oil Companies' cut back in activities. The total cost picture in a cost comparison between the two alternatives should include below cost elements: Rates. Monohull vessels traditionally outclass semisubmersible rig alternatives when it comes to dayrates for the units itself, mainly due to the lower investment and thus less capex. Associated rig cost -1. A large potential component of the associated costs will normally be caused by taking a drill rig away from a drilling programme to undertake well intervention work. Associated rig cost -2. One of the most visible associated cost elements for a drill rig may typically be the direct associated costs of employing a number of anchor handlers for a number of days. Associated rig cost -3. Monohull vessels will offer a flexibility which will provide significant time savings due to reduced transit time between locations and less time spent to establish p
Title: Well Intervention using MSV/DSV
Description:
Abstract Well intervention work through a rigid monobore riser from a dynamically positioned monohull vessel puts new challenges to the industry to ensure a safe and efficient intervention to the increasing number of subsea wells.
Improved DP systems and modified riser systems and workover control systems are the key issues.
Introduction Over a period of years we have seen the development of new and old oilfields applying an increasing number of subsea well solutions.
Further, the development of 'smart wells' and a general decrease in production average of existing wells, an increasing demand for well intervention services in the future is anticipated.
This is supported by several studies which conclude with a significant volume increase in well intervention services required in the years to come.
More cost effective solutions than using anchored drill rigs will have to be established to reduce the total cost of servicing subsea wells.
The solution which has been paid most attention and seems to be the most interesting alternative today is performing the intrevention work using a monohull vessel, like the Botnica concept, which has been developed to provide Operators with an alternative to both the conventional semisubmersible rig market and to other potential monohull solutions.
This paper will briefly addresse the commercial aspects of a monohull vessel versus a semi submersible rig, a market driven situation which should be well known to the market.
Then the paper will focus on the operational / technical challenges of (1) vessel motion and its impact on a rigid riser system when connected to a well and (2) dynamic positioning of a monohull, a subject which will be supported by testing data from the MSV Botnica which have installed and tested a new generation DP system.
Well intervention work through a Subsea Wireline Lubricator provides less challenges to the monohull vessel concept than riser operations.
Such operations has successfully been undertaken by other vessels and will not be addressed in this paper.
Commercial aspects - monohull vessel versus semisubmersible rigs.
A few months back it was acknowledged that well intervention services from a monohull vessel was likely to be provided at a significantly lower cost than from a semisubmersible rig.
Comparative cost schedules between monohulls and semis are however depending on how the Operators calculate the cost of using a semi which is already on charter.
Cost / benefit scenarios are also subject to fluctuating rates due to both short and long term changes in oil prices and the corresponding level of oilfield activities which impacts the utilisation of vessels and semis.
Today we experience a change where rig rates are dropping and rigs are being laid up due to Oil Companies' cut back in activities.
The total cost picture in a cost comparison between the two alternatives should include below cost elements: Rates.
Monohull vessels traditionally outclass semisubmersible rig alternatives when it comes to dayrates for the units itself, mainly due to the lower investment and thus less capex.
Associated rig cost -1.
A large potential component of the associated costs will normally be caused by taking a drill rig away from a drilling programme to undertake well intervention work.
Associated rig cost -2.
One of the most visible associated cost elements for a drill rig may typically be the direct associated costs of employing a number of anchor handlers for a number of days.
Associated rig cost -3.
Monohull vessels will offer a flexibility which will provide significant time savings due to reduced transit time between locations and less time spent to establish p.

Related Results

Identification of reactivity descriptors for hydrogenation reactions in the hydrotreatment of vacuum distillates
Identification of reactivity descriptors for hydrogenation reactions in the hydrotreatment of vacuum distillates
Identification de descripteurs de réactivité pour les réactions d’HDN dans l’hydrotraitement de distillats sous vide Les distillats sous vide (DSV) représentent une...
Evaluation of Radiation Hazard Indices in Mining Sites of Nasarawa State, Nigeria
Evaluation of Radiation Hazard Indices in Mining Sites of Nasarawa State, Nigeria
This work evaluates the radiation hazard indices from some selected mining sites in Nasarawa West, using Sodium Iodide Thallium Gamma Spectrometry. Raeq ranged from 100.39-197.40 B...
Validation of Diagnostic Markers for Streak Virus Disease Resistance in Maize
Validation of Diagnostic Markers for Streak Virus Disease Resistance in Maize
Maize streak virus (MSV) is responsible for streak disease of maize and poses a serious threat to maize production in sub-Saharan Africa. Polygenic resistance to MSV has become an ...
A Survey of Organ Equivalent and Effective Doses from Diagnostic Radiology Procedures
A Survey of Organ Equivalent and Effective Doses from Diagnostic Radiology Procedures
The quantification of radiation risks associated with radiological examinations has been a subject of interest with the increased use of X-rays. Effective dose, which is a risk-wei...
Assessment of radiation exposure in the settlements located in Stepnogorsk area
Assessment of radiation exposure in the settlements located in Stepnogorsk area
The Stepnogorsk area Northern Kazakhstan has a long history mining activities. Mining activities have lots of environmental and health impacts. The aims of this study were to chara...
BTE-Spannbetonfertigteile – Anwendung magnetischer Verfahren (MSV-Prüfung) zur Spannstahlbruchortung an Bestandsbauwerken
BTE-Spannbetonfertigteile – Anwendung magnetischer Verfahren (MSV-Prüfung) zur Spannstahlbruchortung an Bestandsbauwerken
Zum aktuellen Zeitpunkt befinden sich 40 Brückenbauwerke im Bestand der DB InfraGO AG, welche mit potenziell spannungsrisskorrosionsgefährdeten sog. Hennigsdorfer Spannstahl herges...
Study of the Response and Calibration Procedures of LiF:Mg, Ti TLD-100 for the Dosimetry of Photon Beam
Study of the Response and Calibration Procedures of LiF:Mg, Ti TLD-100 for the Dosimetry of Photon Beam
To guarantee quality assurance and quality control of the received radiation dose and treatment level, Thermoluminescent Dosimeter (TLD) is frequently employed in personal control ...

Back to Top