Faktor Terjadinya Keterlambatan Waktu bongkar muat Kontainer MV. Oriental Jade di Pelabuhan Manokwari
View through CrossRef
The purpose of this study is to determine the factors causing delays in loading and unloading time of MV Oriental Jade at Manokwari Port, the impact of delays in loading and unloading time of MV containers. Oriental Jade at Manokwari Port and efforts in order to overcome the late loading and unloading time of containers on MV. Oriental Jade at Manokwari Port. This research uses a qualitative case study method, with data analysis techniques using Fishbone diagrams. The research was conducted on a container ship named MV. Oriental Jade in 2022. The data collection techniques used are observation, interviews, and documentation studies related to efforts to overcome the causes of delays in loading and unloading time of MV Oriental Jade. The interview involved Captain, chief officer and foreman. The results of this study indicate that the factors causing delays in the loading and unloading time of MV Oriental Jade at Manokwari Port are due to the limitations of loading and unloading equipment, namely the cranes available at Manokwari Port are fixed cranes, these cranes do not have wheels so that they hinder the loading and unloading process, other factors because loading and unloading workers often arrive late to the loading and unloading location besides that heavy rain is a factor that hinders container loading and unloading time because for the safety of loading and unloading workers. This has an impact on the delay of the MV Oriental Jade container unloading process at Manokwari Port being delayed, and ship operational losses such as port rental costs. Therefore, the effort made is that the ship communicates with the port to determine the schedule and activities of loading and unloading containers so that the container loading and unloading process runs smoothly.
Politeknik Ilmu Pelayaran (PIP) Semaran
Title: Faktor Terjadinya Keterlambatan Waktu bongkar muat Kontainer MV. Oriental Jade di Pelabuhan Manokwari
Description:
The purpose of this study is to determine the factors causing delays in loading and unloading time of MV Oriental Jade at Manokwari Port, the impact of delays in loading and unloading time of MV containers.
Oriental Jade at Manokwari Port and efforts in order to overcome the late loading and unloading time of containers on MV.
Oriental Jade at Manokwari Port.
This research uses a qualitative case study method, with data analysis techniques using Fishbone diagrams.
The research was conducted on a container ship named MV.
Oriental Jade in 2022.
The data collection techniques used are observation, interviews, and documentation studies related to efforts to overcome the causes of delays in loading and unloading time of MV Oriental Jade.
The interview involved Captain, chief officer and foreman.
The results of this study indicate that the factors causing delays in the loading and unloading time of MV Oriental Jade at Manokwari Port are due to the limitations of loading and unloading equipment, namely the cranes available at Manokwari Port are fixed cranes, these cranes do not have wheels so that they hinder the loading and unloading process, other factors because loading and unloading workers often arrive late to the loading and unloading location besides that heavy rain is a factor that hinders container loading and unloading time because for the safety of loading and unloading workers.
This has an impact on the delay of the MV Oriental Jade container unloading process at Manokwari Port being delayed, and ship operational losses such as port rental costs.
Therefore, the effort made is that the ship communicates with the port to determine the schedule and activities of loading and unloading containers so that the container loading and unloading process runs smoothly.
Related Results
FAKTOR-FAKTOR PENYEBAB RENDAHNYA FUNGSI SHIP CRANE TERHADAP PROSES BONGKAR MUAT MV. MADISON
FAKTOR-FAKTOR PENYEBAB RENDAHNYA FUNGSI SHIP CRANE TERHADAP PROSES BONGKAR MUAT MV. MADISON
Dalam proses bongkar muat di sebuah kapal container sebuah alat bongkar muat sangatlah dibutuhkan dan juga kondis yang baik juga diperlukan dalam proses bongkar muatnya. Berdasarka...
OPTIMALISASI PENGGUNAAN ALAT KESELAMATAN KERJA TERHADAP TENAGA KERJA BONGKAR MUAT GUNA MENUNJANG PROSES BONGKAR MUAT DI PELABUHAN SEMEN INDONESIA TUBAN
OPTIMALISASI PENGGUNAAN ALAT KESELAMATAN KERJA TERHADAP TENAGA KERJA BONGKAR MUAT GUNA MENUNJANG PROSES BONGKAR MUAT DI PELABUHAN SEMEN INDONESIA TUBAN
Bongkar muat adalah salah satu aktivitas penting di pelabuhan. Bahkan, ada banyakkegiatan pelabuhan seperti bongkar muat, cargodoring, penerimaan atau pengiriman.Pelabuhan Semen In...
Keterlambatan Proses Bongkar Muat Gandum Pada Kapal MV SE Cardi di Pelabuhan Tanjung Intan Cilacap
Keterlambatan Proses Bongkar Muat Gandum Pada Kapal MV SE Cardi di Pelabuhan Tanjung Intan Cilacap
Abstrak: Proses bongkar muat gandum di Pelabuhan Tanjung Intan Cilacap mengalami inefisiensi yang signifikan. Faktor-faktor penyebab inefisiensi ini antara lain kondisi alam, kiner...
PROSES PENANGANAN BONGKAR MUAT EQUIPMENT DENGAN DOUBLE CRANE PADA PT SAMUDRA INDAH SEJAHTERA DI PELABUHAN TANJUNG EMAS SEMARANG
PROSES PENANGANAN BONGKAR MUAT EQUIPMENT DENGAN DOUBLE CRANE PADA PT SAMUDRA INDAH SEJAHTERA DI PELABUHAN TANJUNG EMAS SEMARANG
Kelancaran bongkar muat harus sesuai dengan kebutuhan dan penggunaan alat yang sedang beroperasi serta memerlukan perawatan yang baik untuk mendukung agar kapal bongkar muat equipm...
OPERASIONAL PERSIAPAN BONGKAR MUAT PADA MT. KIRANA NAWA
OPERASIONAL PERSIAPAN BONGKAR MUAT PADA MT. KIRANA NAWA
Penelitian ini dilatarbelakangi oleh pentingnya kesiapan sistem dan peralatan dalam proses bongkar muat pada kapal tanker guna menjamin efisiensi operasional dan keselamatan kerja....
Identifikasi kerusakan kontainer pada saat pengiriman menggunakan kapal MV Ifama Mas
Identifikasi kerusakan kontainer pada saat pengiriman menggunakan kapal MV Ifama Mas
Penelitian ini mengkaji penyebab kerusakan kontainer pada MV. Ifama Mas di Pelabuhan Belawan. Ini adalah identifikasi faktor penyebab, menganalisis kendala bongkar muat, serta meng...
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
Analisis waktu standar produksi merupakan salah satu analisis metoda kuantitatif yang dilakukan untuk mengukur waktu produksi dan bertujuan agar dapat memiliki waktu standar sebaga...
ANALISIS BONGKAR MUAT PADA KERETA PETIKEMAS 2514 DI STASIUN SUNGAI LAGOA PT KERETA API INDONESIA DAOP 1 JAKARTA
ANALISIS BONGKAR MUAT PADA KERETA PETIKEMAS 2514 DI STASIUN SUNGAI LAGOA PT KERETA API INDONESIA DAOP 1 JAKARTA
Stasiun Sungai Lagoa PT. Kereta Api Indonesia DAOP 1 Jakarta adalah stasiun kereta kelas kecil yang terletak di Tanjung Priok, Jakarta Utara. Stasiun ini melayani bongkar muat peti...