Identifying Factors Influencing Time and Cost Overruns in Public Construction Projects in Bhutan
View through CrossRef
Construction industries worldwide are impacted by time and cost overruns, resulting in significant financial loss and failure to complete projects on time. Clients, contractors, and consultants can plan properly for public construction projects if they have a better understanding of cost and time overruns. The Construction Development Board (now Bhutan Construction and Transport Authority) is the lead agency regulating and overseeing the government construction projects in Bhutan. However, in recent four years, from July 2017 to June 2021, about 50% of the total 2111 government construction projects experienced time and cost overruns, and the total financial loss was Nu. 2,578.86 million. Therefore, study was designed to examine the factors causing delays and cost escalations in the construction project implemented by government during the financial year July 2017 to June 2021. Thus, this study explores identifying factors influencing time and cost overruns to avoid time delays and financial losses. The primary data was collected through the questionnaire survey from engineers of 20 Dzongkhags and 4 Thromdes. The secondary data was collected from the CDB's annual reports, the Construction Association of Bhutan (CAB), and the National Statistics Bureau (NSB). The data was analyzed using the descriptive statistics method, and the relative importance index (RII) was calculated to rank the factors identified from literature reviews. The research results show that financial issue was the critical factor causing delays and cost escalation in the government construction project in Bhutan. Followed by the issue of delays and cost overruns due to shortage of local construction materials, inadequate experience of the contractor, poor site planning, shortage of skilled workers, unrealistic schedule, design change, contractual issues, and project manager competence.
Title: Identifying Factors Influencing Time and Cost Overruns in Public Construction Projects in Bhutan
Description:
Construction industries worldwide are impacted by time and cost overruns, resulting in significant financial loss and failure to complete projects on time.
Clients, contractors, and consultants can plan properly for public construction projects if they have a better understanding of cost and time overruns.
The Construction Development Board (now Bhutan Construction and Transport Authority) is the lead agency regulating and overseeing the government construction projects in Bhutan.
However, in recent four years, from July 2017 to June 2021, about 50% of the total 2111 government construction projects experienced time and cost overruns, and the total financial loss was Nu.
2,578.
86 million.
Therefore, study was designed to examine the factors causing delays and cost escalations in the construction project implemented by government during the financial year July 2017 to June 2021.
Thus, this study explores identifying factors influencing time and cost overruns to avoid time delays and financial losses.
The primary data was collected through the questionnaire survey from engineers of 20 Dzongkhags and 4 Thromdes.
The secondary data was collected from the CDB's annual reports, the Construction Association of Bhutan (CAB), and the National Statistics Bureau (NSB).
The data was analyzed using the descriptive statistics method, and the relative importance index (RII) was calculated to rank the factors identified from literature reviews.
The research results show that financial issue was the critical factor causing delays and cost escalation in the government construction project in Bhutan.
Followed by the issue of delays and cost overruns due to shortage of local construction materials, inadequate experience of the contractor, poor site planning, shortage of skilled workers, unrealistic schedule, design change, contractual issues, and project manager competence.
Related Results
Analysis of Cost and Time Overruns for Major Public Building Construction Projects in Dire Dawa City, Ethiopia
Analysis of Cost and Time Overruns for Major Public Building Construction Projects in Dire Dawa City, Ethiopia
Cost and time overruns are the critical challenges for construction projects. The consequences can extend beyond just monetary losses, causing project delays and even project cance...
A study of causes of delay and cost overrun in office construction projects in the eThekwini Municipal Area, South Africa
A study of causes of delay and cost overrun in office construction projects in the eThekwini Municipal Area, South Africa
On-time completion and conformity with assigned cost of every project are the most important factors in the success of project plans. Cost overruns and time overrun (delays) have b...
Doklam Standoff Resolution: Interview of Major General S B Asthana by SCMP
Doklam Standoff Resolution: Interview of Major General S B Asthana by SCMP
(Views of Major General S B Asthana,SM,VSM, (Veteran), Questioned by Jiangtao Shi of South China Morning Post on 29 August 2017.Question 1 (SCMP)Are you surprised that the over 70-...
Identifying, analyzing, and managing challenges in administering construction contracts of large public projects in Bhutan
Identifying, analyzing, and managing challenges in administering construction contracts of large public projects in Bhutan
Construction projects encompass three major phases: pre-construction, construction, and post-construction. Although various problems are inevitable in every phase, most of them occ...
Cost Overrun Factor of Toll Road Project Construction
Cost Overrun Factor of Toll Road Project Construction
Abstract
Results in more than 45 studies of infrastructure projects in 20 countries that ran overestimate. For rail projects, they predict average cost increases of ...
Mitigation of Delays and Cost Overruns on Private Sector Projects in South Africa
Mitigation of Delays and Cost Overruns on Private Sector Projects in South Africa
PURPOSE
This study aims to examine methods to mitigate delays and cost overruns that can be effectively implemented in private sector construction projects.
DESIGN / METHODOLOGY /...
Significant factors affecting the Vietnam Roads Infrastructure Construction Cost Overrun - A Review
Significant factors affecting the Vietnam Roads Infrastructure Construction Cost Overrun - A Review
Cost overrun represents a significant challenge faced in construction projects, particularly in the realm of transportation infrastructure. The investigation into the causes of cos...
Contractor-Based Evaluation of Construction Cost Overrun Factors Using Matrix Analysis
Contractor-Based Evaluation of Construction Cost Overrun Factors Using Matrix Analysis
The construction cost overrun is an important issue that should be addressed, as it directly impacts many construction companies. Our research objective is to study and rank the im...