Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Optimisation of Offshore Structures Decommissioning – Cost Considerations

View through CrossRef
Abstract The petroleum industry is currently being faced with a growing number of ageing offshore platforms that are no longer in use and require to be decommissioned. Offshore decommissioning is a complex venture, and such projects are expected to cost the industry billions of dollars in the next two decades. Early knowledge of decommissioning cost is important to platform owners who bear the asset retirement obligation. However, obtaining the cost estimate for decommissioning an offshore platform is a challenging task that requires extensive structural and economic studies. This is further complicated by the existence of several decommissioning options such as complete and partial removal. In this paper, project costs for decommissioning 23 offshore platforms under three different scenarios are estimated using information from a publicly available source which only specified the costs of completely removing the platforms. A novel mathematical model for predicting the decommissioning cost for a platform based on its features is developed. The development included curve-fitting with the aid of generalised reduced gradient tool in Excel® Solver and a training dataset. The developed model predicted, with a very high degree of accuracy, platform decommissioning costs for four (4) different options under the Pacific Outer Continental Shelf conditions. Model performance was evaluated by calculating the Mean Absolute Percentage Error of predictions using a test dataset. This yielded a value of about 6%, implying a 94% chance of correctly predicting decommissioning cost.
Title: Optimisation of Offshore Structures Decommissioning – Cost Considerations
Description:
Abstract The petroleum industry is currently being faced with a growing number of ageing offshore platforms that are no longer in use and require to be decommissioned.
Offshore decommissioning is a complex venture, and such projects are expected to cost the industry billions of dollars in the next two decades.
Early knowledge of decommissioning cost is important to platform owners who bear the asset retirement obligation.
However, obtaining the cost estimate for decommissioning an offshore platform is a challenging task that requires extensive structural and economic studies.
This is further complicated by the existence of several decommissioning options such as complete and partial removal.
In this paper, project costs for decommissioning 23 offshore platforms under three different scenarios are estimated using information from a publicly available source which only specified the costs of completely removing the platforms.
A novel mathematical model for predicting the decommissioning cost for a platform based on its features is developed.
The development included curve-fitting with the aid of generalised reduced gradient tool in Excel® Solver and a training dataset.
The developed model predicted, with a very high degree of accuracy, platform decommissioning costs for four (4) different options under the Pacific Outer Continental Shelf conditions.
Model performance was evaluated by calculating the Mean Absolute Percentage Error of predictions using a test dataset.
This yielded a value of about 6%, implying a 94% chance of correctly predicting decommissioning cost.

Related Results

Converted Barge for Wellhead Platform Decommissioning
Converted Barge for Wellhead Platform Decommissioning
Abstract This paper presents an alternative method for decommissioning offshore wellhead platform using converted flat top barge as decommissioning barge. The barge ...
Collaborations Involving Malaysia Upstream Regulator to Enhance Decommissioning
Collaborations Involving Malaysia Upstream Regulator to Enhance Decommissioning
Abstract This paper aims to share the collaboration efforts of Malaysia's governing body for Upstream oil & gas industry with various stakeholders to enhance dec...
Current Situation and Development Trend of Decommissioning of Nuclear Power Plants
Current Situation and Development Trend of Decommissioning of Nuclear Power Plants
Abstract The complete life of a nuclear power plant consists of three stages: construction, operation and decommissioning. In the last stage of the operation life of...
Design of an Integrated Sustainable Energy System
Design of an Integrated Sustainable Energy System
Abstract One of the greatest industrial challenges for the oil & gas sector to address is the decommissioning of offshore assets along mature basins. The O&G...
Seeking the Proper Decommissioning Method in Gross Split Era
Seeking the Proper Decommissioning Method in Gross Split Era
Abstract PT Pertamina Hulu Energi Offshore North-West Java (PHE ONWJ) presently operates a fleet of more than 200 fixed offshore platforms and nearly three quarters ...
A New Multi-Criteria Decision-Making Tool for Subsea Oil and Gas Asset Decommissioning
A New Multi-Criteria Decision-Making Tool for Subsea Oil and Gas Asset Decommissioning
Abstract The decommissioning of offshore oil and gas (O&G) facilities poses significant challenges due to high costs, operational risks, social impacts, and envi...
Alternative Offshore Foundation Installation Methods
Alternative Offshore Foundation Installation Methods
Abstract According to the European Wind Energy Association (EWEA) in the first six months of 2012, Europe installed and fully grid connected 132 offshore wind tur...
Optimising Offshore Structures Decommissioning - A Multicriteria Decision Approach
Optimising Offshore Structures Decommissioning - A Multicriteria Decision Approach
Abstract Decommissioning activity is being delayed due to cash flow constraints in most companies, others are taking advantage of the low oil prices to expedite deco...

Back to Top