Lena Guyed Tower Decommissioning Engineering
View through CrossRef
Abstract
The Mississippi Canyon 280-A platform, also known as Lena Guyed Tower located in 1,000 ft water depth in the Gulf of Mexico (GoM), was successfully decommissioned and reefed in-place in 2020. To meet the regulatory requirements on offshore platform decommissioning, i.e. BSEE decommissioning requirements and the LDWF artificial reef program, an environmental study and an engineering study were performed to ensure that the platform decommissioning satisfies these critical requirements on environmental protection and operational safety.
The environmental study revealed the abundance of marine lives residing on the tower and rare coral species only observed in deepwater region. This justified the environmental benefit of turning the tower into an on-site artificial reef and functioning as a vibrant marine life habitat at the end of its production service life.
The engineering study on Lena decommissioning, as addressed in this paper, involved three (3) stages of engineering work: tower decommissioning concepts and feasibility study; selected concept definition; and detailed tower reef-in-place laydown (toppling) plan and design. High-level tower reef-in-place criteria were set up in the early engineering stage as guidelines to the detailed laydown design, including specific project requirements on minimal environmental impact and safe offshore field operations.
This engineering study relied heavily on multiple expert brainstorm sessions on various decommissioning concepts and options, and advanced structural modeling and computer simulations for assessment and design. A large number of tower structural models were developed to verify the plan and check various factors and risk scenarios that may affect the tower performance in different stages of the decommissioning operation. Advanced analytical techniques were developed and applied, which feature the driving mechanisms of the problem such as soil-structure-interaction, guyline tension, structural member contact and sliding, large displacement simulation, structural collapse, and hydrodynamics. Stringent quality assurance and testing procedures were followed to ensure the credibility of developed analytical techniques and engineering technologies.
The most challenging part that differentiates the decommissioning engineering from typical structural design is how to properly estimate the platform in-situ "as-is" condition and carry out the assessment as such to make a regulatory compliant, feasible, reliable, and efficient plan. Therefore, engineering judgment had to go beyond the scope covered by existing industry codes and standards, and rely on the most recent advances in industry research and technology.
This engineering study resulted in a clearly defined tower decommissioning plan and procedure, backed up with contingency plans for various risk scenarios and potential deviations in field operation due to limitations and/or uncertainties. The decommissioning plan minimized the offshore field construction scope and risk, and kept the required tower laydown pull loads within the capacity range of typical GoM offshore tugboats. As a result, the Lena tower was successfully laid down on seafloor in an anticipated reefing position, with no major deviations from the plan.
Lena Guyed Tower is the first deepwater compliant structure decommissioned. This decommissioning effort may provide the most valuable information and lessons learned to the industry for similar decommissioning and abandonment operations in the future.
Title: Lena Guyed Tower Decommissioning Engineering
Description:
Abstract
The Mississippi Canyon 280-A platform, also known as Lena Guyed Tower located in 1,000 ft water depth in the Gulf of Mexico (GoM), was successfully decommissioned and reefed in-place in 2020.
To meet the regulatory requirements on offshore platform decommissioning, i.
e.
BSEE decommissioning requirements and the LDWF artificial reef program, an environmental study and an engineering study were performed to ensure that the platform decommissioning satisfies these critical requirements on environmental protection and operational safety.
The environmental study revealed the abundance of marine lives residing on the tower and rare coral species only observed in deepwater region.
This justified the environmental benefit of turning the tower into an on-site artificial reef and functioning as a vibrant marine life habitat at the end of its production service life.
The engineering study on Lena decommissioning, as addressed in this paper, involved three (3) stages of engineering work: tower decommissioning concepts and feasibility study; selected concept definition; and detailed tower reef-in-place laydown (toppling) plan and design.
High-level tower reef-in-place criteria were set up in the early engineering stage as guidelines to the detailed laydown design, including specific project requirements on minimal environmental impact and safe offshore field operations.
This engineering study relied heavily on multiple expert brainstorm sessions on various decommissioning concepts and options, and advanced structural modeling and computer simulations for assessment and design.
A large number of tower structural models were developed to verify the plan and check various factors and risk scenarios that may affect the tower performance in different stages of the decommissioning operation.
Advanced analytical techniques were developed and applied, which feature the driving mechanisms of the problem such as soil-structure-interaction, guyline tension, structural member contact and sliding, large displacement simulation, structural collapse, and hydrodynamics.
Stringent quality assurance and testing procedures were followed to ensure the credibility of developed analytical techniques and engineering technologies.
The most challenging part that differentiates the decommissioning engineering from typical structural design is how to properly estimate the platform in-situ "as-is" condition and carry out the assessment as such to make a regulatory compliant, feasible, reliable, and efficient plan.
Therefore, engineering judgment had to go beyond the scope covered by existing industry codes and standards, and rely on the most recent advances in industry research and technology.
This engineering study resulted in a clearly defined tower decommissioning plan and procedure, backed up with contingency plans for various risk scenarios and potential deviations in field operation due to limitations and/or uncertainties.
The decommissioning plan minimized the offshore field construction scope and risk, and kept the required tower laydown pull loads within the capacity range of typical GoM offshore tugboats.
As a result, the Lena tower was successfully laid down on seafloor in an anticipated reefing position, with no major deviations from the plan.
Lena Guyed Tower is the first deepwater compliant structure decommissioned.
This decommissioning effort may provide the most valuable information and lessons learned to the industry for similar decommissioning and abandonment operations in the future.
Related Results
Lena Guyed Tower Project Overview
Lena Guyed Tower Project Overview
ABSTRACT
The installation of the Lena guyed tower was one of the industry's most significant accomplishments of 1983. This paper serves as an introduction to a se...
Structural Optimization and Experimental Research of High-rise Guyed Tower
Structural Optimization and Experimental Research of High-rise Guyed Tower
In this paper, the structural optimization of high-rise guyed tower is carried out for the guyed wire and tower column schemes. The schemes are compared from the four guyed wires a...
Design of the Lena Guyed Tower
Design of the Lena Guyed Tower
ABSTRACT
The 1983 Lena platform installation in 1000 feet of water in the Gulf of Mexico culminated twelve years of guyed tower development. During the Lena desig...
Converted Barge for Wellhead Platform Decommissioning
Converted Barge for Wellhead Platform Decommissioning
Abstract
This paper presents an alternative method for decommissioning offshore wellhead platform using converted flat top barge as decommissioning barge. The barge ...
Current Situation and Development Trend of Decommissioning of Nuclear Power Plants
Current Situation and Development Trend of Decommissioning of Nuclear Power Plants
Abstract
The complete life of a nuclear power plant consists of three stages: construction, operation and decommissioning. In the last stage of the operation life of...
Collaborations Involving Malaysia Upstream Regulator to Enhance Decommissioning
Collaborations Involving Malaysia Upstream Regulator to Enhance Decommissioning
Abstract
This paper aims to share the collaboration efforts of Malaysia's governing body for Upstream oil & gas industry with various stakeholders to enhance dec...
A New Multi-Criteria Decision-Making Tool for Subsea Oil and Gas Asset Decommissioning
A New Multi-Criteria Decision-Making Tool for Subsea Oil and Gas Asset Decommissioning
Abstract
The decommissioning of offshore oil and gas (O&G) facilities poses significant challenges due to high costs, operational risks, social impacts, and envi...
Corrosion analysis of guyed rod used for 500 kV transmission tower
Corrosion analysis of guyed rod used for 500 kV transmission tower
Abstract
As an important part of the guyed device of cable stayed tower, guyed rod plays a key role of preventing transmission tower from tilting and toppling. In th...