Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Converted Barge for Wellhead Platform Decommissioning

View through CrossRef
Abstract This paper presents an alternative method for decommissioning offshore wellhead platform using converted flat top barge as decommissioning barge. The barge shall have capability to self-decommissioning topside and jacket and transportation to disposal premises. The key advantage for this propose new concept is to eliminate using of heavy derrick-crane vessel for all decommissioning activities, this can help to reduce cost for decommissioning in significant magnitude and also reduce marine hazards due to heavy lift handling. The barge will be installed with accommodation module, special tools and equipment such as mooring system, reverse float-over lifting with heave-compensation system & skidding appliances, jacket bottom lifting appliances and etc. in order to perform decommissioning activities under opensea environment with only minimal assist from marine support vessel. The decommissioning barge concept is designed to suit with various sizes of wellhead platform. Extensive engineering study has been performed in term of naval architect and structure engineering to proof feasibility of decommissioning barge concept and the existing platform located in Gulf of Thailand where is prone to Typhoon extreme sea condition. The study result shows that modify barge is feasible to perform decommissioning of various sized wellhead platforms. Applicable worldwide offshore and Southeast Asian fields, present many similar platforms where this innovative tools can be used to make an economy of scale in the removal operations. The feasibility study also include scope of explore opportunity to further improvement in term of flexible operation and cost saving. The following two options are performed the high level feasibility study and cost sensitivity with positive result outcomes. Option 1 -Decommissioning barge with self-propelled systemOption 2 -Decommissioning barge with self-propelled with control stationkeeping capabilities In term of cost saving, sensitivity study to compare the cost with conventional method is perform. Based on decommissioning execution over an entire service life, the decommissioning barge can gain cost saving over 23%.
Title: Converted Barge for Wellhead Platform Decommissioning
Description:
Abstract This paper presents an alternative method for decommissioning offshore wellhead platform using converted flat top barge as decommissioning barge.
The barge shall have capability to self-decommissioning topside and jacket and transportation to disposal premises.
The key advantage for this propose new concept is to eliminate using of heavy derrick-crane vessel for all decommissioning activities, this can help to reduce cost for decommissioning in significant magnitude and also reduce marine hazards due to heavy lift handling.
The barge will be installed with accommodation module, special tools and equipment such as mooring system, reverse float-over lifting with heave-compensation system & skidding appliances, jacket bottom lifting appliances and etc.
in order to perform decommissioning activities under opensea environment with only minimal assist from marine support vessel.
The decommissioning barge concept is designed to suit with various sizes of wellhead platform.
Extensive engineering study has been performed in term of naval architect and structure engineering to proof feasibility of decommissioning barge concept and the existing platform located in Gulf of Thailand where is prone to Typhoon extreme sea condition.
The study result shows that modify barge is feasible to perform decommissioning of various sized wellhead platforms.
Applicable worldwide offshore and Southeast Asian fields, present many similar platforms where this innovative tools can be used to make an economy of scale in the removal operations.
The feasibility study also include scope of explore opportunity to further improvement in term of flexible operation and cost saving.
The following two options are performed the high level feasibility study and cost sensitivity with positive result outcomes.
Option 1 -Decommissioning barge with self-propelled systemOption 2 -Decommissioning barge with self-propelled with control stationkeeping capabilities In term of cost saving, sensitivity study to compare the cost with conventional method is perform.
Based on decommissioning execution over an entire service life, the decommissioning barge can gain cost saving over 23%.

Related Results

A Critical Review of Transportation Analysis Procedures
A Critical Review of Transportation Analysis Procedures
ABSTRACT In recent years, with increased emphasis upon deepwater field development, the size and weight of offshore platforms have increased significantly. Conseq...
Key Learning Experience in Managing Prolific High Temperature Wells in Offshore Malaysia
Key Learning Experience in Managing Prolific High Temperature Wells in Offshore Malaysia
Abstract Well integrity management for High Temperature (HT) wells can be challenging due to stresses and cyclic behaviour during thermal expansion or corrosive stre...
Current Situation and Development Trend of Decommissioning of Nuclear Power Plants
Current Situation and Development Trend of Decommissioning of Nuclear Power Plants
Abstract The complete life of a nuclear power plant consists of three stages: construction, operation and decommissioning. In the last stage of the operation life of...
Collaborations Involving Malaysia Upstream Regulator to Enhance Decommissioning
Collaborations Involving Malaysia Upstream Regulator to Enhance Decommissioning
Abstract This paper aims to share the collaboration efforts of Malaysia's governing body for Upstream oil & gas industry with various stakeholders to enhance dec...
Bullwinkle Loadout Analysis
Bullwinkle Loadout Analysis
ABSTRACT The Bullwinkle jacket was loaded onto a launch barge using a conventional skidding operation. The size (over 1365 feet long), weight (approximately 50,00...
A New Multi-Criteria Decision-Making Tool for Subsea Oil and Gas Asset Decommissioning
A New Multi-Criteria Decision-Making Tool for Subsea Oil and Gas Asset Decommissioning
Abstract The decommissioning of offshore oil and gas (O&G) facilities poses significant challenges due to high costs, operational risks, social impacts, and envi...
A Quasi-Static Approach for Transportation Analysis of Offshore Platforms
A Quasi-Static Approach for Transportation Analysis of Offshore Platforms
Abstract This paper descri bes a computer model to predictthe maximll11 probable stress as well as the cumulative fatigue damage at any joint in a jacket or its t...
Offshore Pipeline Construction Stress Measurement
Offshore Pipeline Construction Stress Measurement
Abstract Stresses induced in offshore pipelines were measured during construction of a 24- and a 20-inch pipeline in 200 and 250 feet of water, respectively. A un...

Back to Top