Mitigating Wellhead Fatigue While Reducing HSE Risk, Deck Spread, Deployment Time, and Crew Size

View through CrossRef
Abstract Subsea wellhead systems have a design fatigue life that is expected to withstand the damage incurred from stress caused by cyclic loading during its operation. Wellhead fatigue is a critical factor when drilling offshore wells because the condition of the wellhead determines the length of time drilling activities can be carried out safely. The presence of the BOP on top of the wellhead affects fatigue life. Initially, these units were designed for 6-in. and 10-in. diameter casing and weighed slightly less than 1,400 lb. [ASME, 2003) Over time, BOPs evolved, and today's units are considerably larger and heavier than their predecessors, weighing in at approximately 400 metric tons. This increase in size and weight on the wellhead negatively impacts fatigue life. In recent years, the oil and gas industry has begun to look for ways to reduce wellhead fatigue to extend the life of the wellhead and expand the margins for safe drilling operations. A new ROV-operated Wellhead Load Relief (WLR) system, developed specifically to mitigate fatigue, uses special tensioners that are tethered individually to the BOP. Each tensioner contains a hydraulic spooling unit with a lock- and-pull mechanism that allows the ROV to tighten adjustable tethers subsea, pulling them from slack to a maximum tension of 35 metric tons. This approach to installation is a departure from common industry practice, which necessitates the configuration of the predetermined tether lengths on the topside. The ROV-operated WLR system described in this paper is a compact, high-capacity BOP tethering system suitable for both template and seabed anchoring. It provides a new and efficient way of tethering the BOP to avoid wellhead fatigue and delivers additional benefits that include minimized HSE risk, a smaller deck spread, decreased deployment time, and a smaller crew. The WLR system was operated subsea for the first time in December 2019. By precisely tensioning each tether and limiting the load transferred to the wellhead, the WLR significantly lessened wellhead fatigue, resulting in an almost complete halt in BOP movement. This new technology enables the operator to make optimal use of the fatigue life of the wellhead without compromising efficiency or safety.
Title: Mitigating Wellhead Fatigue While Reducing HSE Risk, Deck Spread, Deployment Time, and Crew Size
Description:
Abstract Subsea wellhead systems have a design fatigue life that is expected to withstand the damage incurred from stress caused by cyclic loading during its operation.
Wellhead fatigue is a critical factor when drilling offshore wells because the condition of the wellhead determines the length of time drilling activities can be carried out safely.
The presence of the BOP on top of the wellhead affects fatigue life.
Initially, these units were designed for 6-in.
and 10-in.
diameter casing and weighed slightly less than 1,400 lb.
[ASME, 2003) Over time, BOPs evolved, and today's units are considerably larger and heavier than their predecessors, weighing in at approximately 400 metric tons.
This increase in size and weight on the wellhead negatively impacts fatigue life.
In recent years, the oil and gas industry has begun to look for ways to reduce wellhead fatigue to extend the life of the wellhead and expand the margins for safe drilling operations.
A new ROV-operated Wellhead Load Relief (WLR) system, developed specifically to mitigate fatigue, uses special tensioners that are tethered individually to the BOP.
Each tensioner contains a hydraulic spooling unit with a lock- and-pull mechanism that allows the ROV to tighten adjustable tethers subsea, pulling them from slack to a maximum tension of 35 metric tons.
This approach to installation is a departure from common industry practice, which necessitates the configuration of the predetermined tether lengths on the topside.
The ROV-operated WLR system described in this paper is a compact, high-capacity BOP tethering system suitable for both template and seabed anchoring.
It provides a new and efficient way of tethering the BOP to avoid wellhead fatigue and delivers additional benefits that include minimized HSE risk, a smaller deck spread, decreased deployment time, and a smaller crew.
The WLR system was operated subsea for the first time in December 2019.
By precisely tensioning each tether and limiting the load transferred to the wellhead, the WLR significantly lessened wellhead fatigue, resulting in an almost complete halt in BOP movement.
This new technology enables the operator to make optimal use of the fatigue life of the wellhead without compromising efficiency or safety.

Related Results

On Flores Island, do "ape-men" still exist? https://www.sapiens.org/biology/flores-island-ape-men/
On Flores Island, do "ape-men" still exist? https://www.sapiens.org/biology/flores-island-ape-men/
<span style="font-size:11pt"><span style="background:#f9f9f4"><span style="line-height:normal"><span style="font-family:Calibri,sans-serif"><b><spa...
Hubungan Perilaku Pola Makan dengan Kejadian Anak Obesitas
Hubungan Perilaku Pola Makan dengan Kejadian Anak Obesitas
<p><em><span style="font-size: 11.0pt; font-family: 'Times New Roman',serif; mso-fareast-font-family: 'Times New Roman'; mso-ansi-language: EN-US; mso-fareast-langua...
Civil aircraft crew alarm ranking method
Civil aircraft crew alarm ranking method
Cockpit crew alerts are primarily used to draw the attention of flight crews to be aware of failures, malfunctions, abnormal states or unexpected state changes in aircraft and airc...
EFEKTIVITAS YOGA UNTUK MENGURANGI FATIGUE PADA PASIEN KANKER YANG MENJALANI KEMOTERAPI
EFEKTIVITAS YOGA UNTUK MENGURANGI FATIGUE PADA PASIEN KANKER YANG MENJALANI KEMOTERAPI
ABSTRAKLatar Belakang : Cancer Related Fatigue (CRF) adalah manifestasi klinis yang serius dan gejala umum yang dialami oleh pasien kanker. Fatigue adalah salah satu yang paling se...
Evolution of HSE and Future Challenges in the E&P Sector of Pakistan
Evolution of HSE and Future Challenges in the E&P Sector of Pakistan
Abstract Objectives/Scope: Evolution of HSE in the E&P Sector of Pakistan during past few decades has touched maturity stage after passing various...
Quantifying HSE Culture – A Leading Indicator of HSE Performance: An Energy Industry Case Study
Quantifying HSE Culture – A Leading Indicator of HSE Performance: An Energy Industry Case Study
Abstract This paper presents the results of an HSE Culture survey administered to employees and managers at an energy company. HSE culture can be defined as the valu...
Key Initiatives towards HSE Excellence
Key Initiatives towards HSE Excellence
Abstract Description This paper describes key initiatives of the HSE management system that has been developed, and implementati...
Bridging Crew Dynamics and Lean Construction Principles: Defining Crew Choreography in Construction Operations
Bridging Crew Dynamics and Lean Construction Principles: Defining Crew Choreography in Construction Operations
Question: How have research trends and thematic structures related to Crew Design, Crew Planning, and Work Structuring evolved in the literature, and how can these trends be synthe...

Back to Top