Design of the Lena Guyed Tower

View through CrossRef
ABSTRACT The 1983 Lena platform installation in 1000 feet of water in the Gulf of Mexico culminated twelve years of guyed tower development. During the Lena design, numerous technical challenges were met, resulting in several innovative developments. Technical issues resolved included determining tower dynamic response, developing guying system components, developing a compliant pile foundation, providing permanent tower buoyancy, developing a side-launching method, and assessing the structure's safety and reliability. This paper discusses anal analysis and design with emphasis on features unique to a guyed tower. INTRODUCTION Early guyed tower work involved the development of the concept [l], the development of analytical capabilities [2], and the execution of the joint-industry test tower program [3]. The topics covered in this paper are concept development, design criteria, design methodology, and reliability considerations for the Lena structure. A general Lena project overview is given in Reference 4. A guyed tower is called compliant because it is allowed to move in response to large waves. It responds differently than fixed-base platforms because a guyed tower's fundamental period is typically greater than 25 seconds, compared to fixed-base platforms, which generally have periods less than 5.0 seconds. For fixed-base platforms, the inertial forces are additive to the wave forces because their periods are significantly lower than design-level waves, characterized by periods in the 10–15 second range. For a guyed tower, however, the inertial forces counteract the wave forces. The guylines restrain the tower near the resultant of applied environmental forces, thus significantly lowering the tower's shear and moment forces. This allows the structure to be designed with a narrow cross section, thus saving weight compared to conventional wide-base fixed platforms. The guyline design effort included selecting suitable components for proper system stiffness and resolving concerns of strength, corrosion, wear, and fatigue. Compliancy is accommodated by allowing the tower to tilt about its base. Therefore, a pile foundation was developed which is flexible enough to accommodate the tower tilt allowed by the guying system, yet strong enough to resist base torsion and translation forces. Other compliancy design considerations included accommodating the vertical deck movement relative to the wellheads, attaching flexible pipelines, and minimizing the motion effects on platform operations. Installation requirements had a significant impact on design because of the large overhangs during transportation and the load concentrations during launch. Installation considerations included one- and two-piece tower configurations, and side- and end-launch schemes. MAJOR CONCEPTS Guying System Early studies showed that cable systems radiating directly to anchor points were infeasible for the Lena case.
Title: Design of the Lena Guyed Tower
Description:
ABSTRACT The 1983 Lena platform installation in 1000 feet of water in the Gulf of Mexico culminated twelve years of guyed tower development.
During the Lena design, numerous technical challenges were met, resulting in several innovative developments.
Technical issues resolved included determining tower dynamic response, developing guying system components, developing a compliant pile foundation, providing permanent tower buoyancy, developing a side-launching method, and assessing the structure's safety and reliability.
This paper discusses anal analysis and design with emphasis on features unique to a guyed tower.
INTRODUCTION Early guyed tower work involved the development of the concept [l], the development of analytical capabilities [2], and the execution of the joint-industry test tower program [3].
The topics covered in this paper are concept development, design criteria, design methodology, and reliability considerations for the Lena structure.
A general Lena project overview is given in Reference 4.
A guyed tower is called compliant because it is allowed to move in response to large waves.
It responds differently than fixed-base platforms because a guyed tower's fundamental period is typically greater than 25 seconds, compared to fixed-base platforms, which generally have periods less than 5.
0 seconds.
For fixed-base platforms, the inertial forces are additive to the wave forces because their periods are significantly lower than design-level waves, characterized by periods in the 10–15 second range.
For a guyed tower, however, the inertial forces counteract the wave forces.
The guylines restrain the tower near the resultant of applied environmental forces, thus significantly lowering the tower's shear and moment forces.
This allows the structure to be designed with a narrow cross section, thus saving weight compared to conventional wide-base fixed platforms.
The guyline design effort included selecting suitable components for proper system stiffness and resolving concerns of strength, corrosion, wear, and fatigue.
Compliancy is accommodated by allowing the tower to tilt about its base.
Therefore, a pile foundation was developed which is flexible enough to accommodate the tower tilt allowed by the guying system, yet strong enough to resist base torsion and translation forces.
Other compliancy design considerations included accommodating the vertical deck movement relative to the wellheads, attaching flexible pipelines, and minimizing the motion effects on platform operations.
Installation requirements had a significant impact on design because of the large overhangs during transportation and the load concentrations during launch.
Installation considerations included one- and two-piece tower configurations, and side- and end-launch schemes.
MAJOR CONCEPTS Guying System Early studies showed that cable systems radiating directly to anchor points were infeasible for the Lena case.

Related Results

Structural Optimization and Experimental Research of High-rise Guyed Tower
Structural Optimization and Experimental Research of High-rise Guyed Tower
In this paper, the structural optimization of high-rise guyed tower is carried out for the guyed wire and tower column schemes. The schemes are compared from the four guyed wires a...
Corrosion analysis of guyed rod used for 500 kV transmission tower
Corrosion analysis of guyed rod used for 500 kV transmission tower
Abstract As an important part of the guyed device of cable stayed tower, guyed rod plays a key role of preventing transmission tower from tilting and toppling. In th...
Model Test Of A Pile-Founded Guyed Tower
Model Test Of A Pile-Founded Guyed Tower
ABSTRACT The development of structural concepts for deployment in deep waters has been actively pursued in the last decade by a number of oil operators and design...
Benguela-Belize Compliant Piled Tower: Tower Design
Benguela-Belize Compliant Piled Tower: Tower Design
Abstract The compliant tower is a proven bottom-founded platform which has been used successfully for three developments in the Gulf of Mexico. The compliant towe...
Model Test of a Mooring System for a Pile-Founded Guyed Tower
Model Test of a Mooring System for a Pile-Founded Guyed Tower
ABSTRACT The development of structural concepts for deployment in deep waters has been actively pursued in the 1ast decade by a number of oil operators and design...
The Delta Tower: A Light, Compliant Tower for the Gulf of Mexico
The Delta Tower: A Light, Compliant Tower for the Gulf of Mexico
ABSTRACT The concept which is described in the paper is applicable to fields located in the Gulf of Mexico in water depths ranging from 1 000 to 1 750 feet. The c...
VolturnUS 1:8-Scale FRP Floating Wind Turbine Tower: Analysis, Design, Testing and Performance
VolturnUS 1:8-Scale FRP Floating Wind Turbine Tower: Analysis, Design, Testing and Performance
In May of 2013 the VolturnUS 1:8 floating semi-submersible wind turbine was successfully deployed off the coast of Castine, Maine, making the unit the first grid connected offshore...
Design
Design
Conventional definitions of design rarely capture its reach into our everyday lives. The Design Council, for example, estimates that more than 2.5 million people use design-related...

Back to Top