Seeking the Proper Decommissioning Method in Gross Split Era

View through CrossRef
Abstract PT Pertamina Hulu Energi Offshore North-West Java (PHE ONWJ) presently operates a fleet of more than 200 fixed offshore platforms and nearly three quarters of these platforms have been in operation for more than 30 years. Under newly implemented Gross Split Production Sharing Contract (PSC) scheme, PHE ONWJ is driven to seek an effective and efficient method for offshore platform decommissioning. Three offshore decommissioning options, i.e. Total Removal for Onshore Disposal, Total Removal for Rig-to-Reef, and Leave-in-Situ for Mariculture are examined closely. A qualitative evaluation, which involves comparing the total expected cost of each option against its total expected benefits, is conducted in view of decommissioning drivers, i.e. Safety, Environment, Technical, Cost, and Social Impact to other sea user and community. The evaluation of the expected cost of each decommissioning options is presented. The first two options are subjected to high cost activities e.g. platform removal; mobilization and demobilization of derrick barge; and material disposal onshore or reefing site. The Leave-in-Situ for Mariculture option, on the other hand, is not exposed to those activities as it leaves the retired platform on its existing location and turns the structure into the site for offshore cage system fish farming. This is significant because in the Gross Split PSC scheme, PHE ONWJ is expected to be more prudent and focus on cost efficiency. The social impact of the Mariculture method is potentially important considering the rapid growing of global per capita fish consumption and the fact that there are no offshore cage systems fish farming using retired offshore platform in Indonesian waters or even Southeast area yet. The suitability of the proposed mariculture site of Offshore North West Java waters is further evaluated against the guidelines from the Food and Agriculture Organization of the United Nations (FAO). The Mariculture method can be not only the most cost efficient solution for offshore platform decommissioning, but also providing alternative technique to increase marine fish production.
Title: Seeking the Proper Decommissioning Method in Gross Split Era
Description:
Abstract PT Pertamina Hulu Energi Offshore North-West Java (PHE ONWJ) presently operates a fleet of more than 200 fixed offshore platforms and nearly three quarters of these platforms have been in operation for more than 30 years.
Under newly implemented Gross Split Production Sharing Contract (PSC) scheme, PHE ONWJ is driven to seek an effective and efficient method for offshore platform decommissioning.
Three offshore decommissioning options, i.
e.
Total Removal for Onshore Disposal, Total Removal for Rig-to-Reef, and Leave-in-Situ for Mariculture are examined closely.
A qualitative evaluation, which involves comparing the total expected cost of each option against its total expected benefits, is conducted in view of decommissioning drivers, i.
e.
Safety, Environment, Technical, Cost, and Social Impact to other sea user and community.
The evaluation of the expected cost of each decommissioning options is presented.
The first two options are subjected to high cost activities e.
g.
platform removal; mobilization and demobilization of derrick barge; and material disposal onshore or reefing site.
The Leave-in-Situ for Mariculture option, on the other hand, is not exposed to those activities as it leaves the retired platform on its existing location and turns the structure into the site for offshore cage system fish farming.
This is significant because in the Gross Split PSC scheme, PHE ONWJ is expected to be more prudent and focus on cost efficiency.
The social impact of the Mariculture method is potentially important considering the rapid growing of global per capita fish consumption and the fact that there are no offshore cage systems fish farming using retired offshore platform in Indonesian waters or even Southeast area yet.
The suitability of the proposed mariculture site of Offshore North West Java waters is further evaluated against the guidelines from the Food and Agriculture Organization of the United Nations (FAO).
The Mariculture method can be not only the most cost efficient solution for offshore platform decommissioning, but also providing alternative technique to increase marine fish production.

Related Results

Converted Barge for Wellhead Platform Decommissioning
Converted Barge for Wellhead Platform Decommissioning
Abstract This paper presents an alternative method for decommissioning offshore wellhead platform using converted flat top barge as decommissioning barge. The barge ...
Current Situation and Development Trend of Decommissioning of Nuclear Power Plants
Current Situation and Development Trend of Decommissioning of Nuclear Power Plants
Abstract The complete life of a nuclear power plant consists of three stages: construction, operation and decommissioning. In the last stage of the operation life of...
Collaborations Involving Malaysia Upstream Regulator to Enhance Decommissioning
Collaborations Involving Malaysia Upstream Regulator to Enhance Decommissioning
Abstract This paper aims to share the collaboration efforts of Malaysia's governing body for Upstream oil & gas industry with various stakeholders to enhance dec...
A New Multi-Criteria Decision-Making Tool for Subsea Oil and Gas Asset Decommissioning
A New Multi-Criteria Decision-Making Tool for Subsea Oil and Gas Asset Decommissioning
Abstract The decommissioning of offshore oil and gas (O&G) facilities poses significant challenges due to high costs, operational risks, social impacts, and envi...
Design of an Integrated Sustainable Energy System
Design of an Integrated Sustainable Energy System
Abstract One of the greatest industrial challenges for the oil & gas sector to address is the decommissioning of offshore assets along mature basins. The O&G...
Optimising Offshore Structures Decommissioning - A Multicriteria Decision Approach
Optimising Offshore Structures Decommissioning - A Multicriteria Decision Approach
Abstract Decommissioning activity is being delayed due to cash flow constraints in most companies, others are taking advantage of the low oil prices to expedite deco...
Impossible to Possible - Decommissioning the UAE's Oldest Oil Refinery with Zero Flaring
Impossible to Possible - Decommissioning the UAE's Oldest Oil Refinery with Zero Flaring
Abstract Decommissioning of Oil Refinery is not a regular affair, hence information on best practices being followed during facility decommissioning is not available...
Decommissioning of Umbilicals and Flexible Pipes - A Sensitivity Analysis in Decision-Making Process
Decommissioning of Umbilicals and Flexible Pipes - A Sensitivity Analysis in Decision-Making Process
Abstract The decommissioning of subsea equipment is a reality in Brazil and worldwide, highlighting the need for the development of decision-making methodologies for...