Javascript must be enabled to continue!
Best Practices in Well Construction - The Journey to One Billion Barrels Oil Production in Bonga Field
View through CrossRef
Abstract
In the fiercely competitive realm of brownfield oil and gas projects, our well construction team embarked on a transformative journey marked by unparalleled achievements, as outlined in this paper. This abstract sheds light on the strategic fusion of cutting-edge technologies, innovative processes, and the skill and expertise of the well construction team, which drove the remarkable recovery of over one billion barrels of oil in the illustrious Bonga Field. Navigating the intricate challenges inherent in brownfield environments, our team pursued a dual path of technological innovation and operational process optimization. The tangible outcome was a comprehensive suite of groundbreaking drilling and completion advancements that accelerated project timelines, brought wells online sooner, and substantially reduced well capital and operational expenditure. The achievements are multifaceted, encompassing the adoption of pioneering drilling technologies for extended horizontal reach wells and real-time wellbore visualization using lookahead tools, particularly in geo-steering within thin-bedded sands. Advanced wellbore placement, trajectory control, and drill string optimization significantly elevated flow rates and rates of penetration (ROP), accompanied by improved cuttings cleanup.
A strategic paradigm shift involved using offset well data for risk assessment and well planning, eliminating the need for redundant activities in every well based on available offset well data. Operations were streamlined by integrating various tasks into single runs, showcasing unprecedented efficiency gains. Crucially, our focus transcended hardware enhancements to embrace strategic procedural improvements, with proficient drilling supervisors wielding optimized Bottom Hole Assembly (BHA) configurations to push operational boundaries and enhance ROP, ensuring wellbore integrity. The culmination of these achievements propelled the Bonga project well beyond its production target, recovering over one billion barrels of oil. This abstract immerses the reader in the strategic orchestration of technologies, procedural enhancements, and the exceptional prowess of our team, offering profound insights into the dynamic interplay between human expertise and cutting-edge solutions in the realm of well construction. It is a testament to the extraordinary accomplishments defining our journey to surpassing one billion barrels in the Bonga Field.
Title: Best Practices in Well Construction - The Journey to One Billion Barrels Oil Production in Bonga Field
Description:
Abstract
In the fiercely competitive realm of brownfield oil and gas projects, our well construction team embarked on a transformative journey marked by unparalleled achievements, as outlined in this paper.
This abstract sheds light on the strategic fusion of cutting-edge technologies, innovative processes, and the skill and expertise of the well construction team, which drove the remarkable recovery of over one billion barrels of oil in the illustrious Bonga Field.
Navigating the intricate challenges inherent in brownfield environments, our team pursued a dual path of technological innovation and operational process optimization.
The tangible outcome was a comprehensive suite of groundbreaking drilling and completion advancements that accelerated project timelines, brought wells online sooner, and substantially reduced well capital and operational expenditure.
The achievements are multifaceted, encompassing the adoption of pioneering drilling technologies for extended horizontal reach wells and real-time wellbore visualization using lookahead tools, particularly in geo-steering within thin-bedded sands.
Advanced wellbore placement, trajectory control, and drill string optimization significantly elevated flow rates and rates of penetration (ROP), accompanied by improved cuttings cleanup.
A strategic paradigm shift involved using offset well data for risk assessment and well planning, eliminating the need for redundant activities in every well based on available offset well data.
Operations were streamlined by integrating various tasks into single runs, showcasing unprecedented efficiency gains.
Crucially, our focus transcended hardware enhancements to embrace strategic procedural improvements, with proficient drilling supervisors wielding optimized Bottom Hole Assembly (BHA) configurations to push operational boundaries and enhance ROP, ensuring wellbore integrity.
The culmination of these achievements propelled the Bonga project well beyond its production target, recovering over one billion barrels of oil.
This abstract immerses the reader in the strategic orchestration of technologies, procedural enhancements, and the exceptional prowess of our team, offering profound insights into the dynamic interplay between human expertise and cutting-edge solutions in the realm of well construction.
It is a testament to the extraordinary accomplishments defining our journey to surpassing one billion barrels in the Bonga Field.
Related Results
Bonga Field: A Phased Development to One Billion Barrels
Bonga Field: A Phased Development to One Billion Barrels
Abstract
Bonga field is located 120 km offshore and lies in water more than 1,000 meters deep across an area of 60 square kilometers. The hydrocarbon-bearing reservo...
Bonga FPSO: Asset Management Excellence
Bonga FPSO: Asset Management Excellence
Abstract
Bonga field is located 120 km South-West of Warri, in the Southern Niger Delta of Nigeria, at water depth of 3300 ft. The field was discovered in 1993 and a...
Bonga-Flow Assurance Benchmarking via Field Surveillance
Bonga-Flow Assurance Benchmarking via Field Surveillance
Abstract
Bonga - the first Deepwater development in Nigeria - commenced production in Q4 2005. At an early stage of the project, flow assurance was identified a...
Membrane barrels are taller, fatter, inside-out soluble barrels
Membrane barrels are taller, fatter, inside-out soluble barrels
Abstract
Up-and-down β-barrel topology exists in both the membrane and soluble environment. However, β-barrels are virtually the only topology that exist in the out...
Bonga Main Life Extension Project: An In-Situ Life Extension of an FPSO Using FAIR+ER Methodology and Digital Twin Technology as Basis for Scope Identification and Definition
Bonga Main Life Extension Project: An In-Situ Life Extension of an FPSO Using FAIR+ER Methodology and Digital Twin Technology as Basis for Scope Identification and Definition
Abstract
Production commenced in 2005 from the Bonga Main Field, which is a Floating Production Storage and Offloading (FPSO) + subsea development situated in betwee...
An Overview On Campos Basin
An Overview On Campos Basin
ABSTRACT
Exploration activities in Campos Basin offshore Brazil started in 1968 with seismic surveys carried out by PETROBRAS.
The first oil dis...
Developing a 10 billion barrel reservoir with modern techniques
Developing a 10 billion barrel reservoir with modern techniques
Abstract
A high volume water injection pressure maintenance program was initiated in the Defa Field of the Libyan Arab Republic soon after production began, to ma...
Bonga Northwest Subsurface Development – Planning, Execution and Uncertainty Management
Bonga Northwest Subsurface Development – Planning, Execution and Uncertainty Management
The Bonga North West (BNW) field is located in Shell operated Oil Mining Lease (OML) 118, a deepwater development in Nigeria. This paper presents the BNW subsurface development str...

