Bonga-Flow Assurance Benchmarking via Field Surveillance
View through CrossRef
Abstract
Bonga - the first Deepwater development in Nigeria - commenced production in Q4 2005. At an early stage of the project, flow assurance was identified as a key factor for successful development, noting:complexities of the subsea network, including local downhill flow,logistical challenges of a new Deepwater basin, andreservoir fluids' propensity for solids formation, including additional risks posed by full-field waterflood.
This paper discusses the key elements of the Bonga flow assurance strategy and its implementation in design and operations, with particular focus on the flow assurance performance of the subsea system during initial start-up. Comparisons of field data with analysis predictions include:steady-state thermal-hydraulic performance,system thermal response during cold start-up,cooldown performance of subsea hardware and flowlines,system blowdown effectiveness, including the effect of riser gas-lift andterrain slugging severity and gas-lift requirements.
Introduction
Bonga is operated by the Shell Nigeria Exploration and Production Company (SNEPCo) on behalf of the Nigerian National Petroleum Corporation (NNPC) under a production sharing contract, in partnership with Esso Exploration and Production Company Nigeria, Nigeria Agip Exploration, and Elf Petroleum Nigeria.
Bonga is comprised of subsea wells in approximately 1000 m water depth tied back 2-10 km - via five production manifolds and a dual flowline network - to a spread-moored FPSO. Gas from Bonga is exported to the Nigeria Liquefied Natural Gas (NLNG) plant at Bonny, and oil is transported via tanker offloading. As a vital part of the field development plan, full-field waterflood was initiated in conjunction with initial production. See Figure 1 for a schematic of the Bonga subsea layout.
Flow Assurance Strategies
Solids characterization of the Bonga reservoir fluids and related flow assurance mitigation strategies addressed in the project design are summarized below.
Reservoir fluids
Bonga is comprised of several reservoirs, which exhibit the following variability in fluid properties over the anticipated field life:Reservoir temperature: 128-208° FOil gravity: 29-33° APIGas-Oil ratio: 550-1200 scf/stbWatercut: 0% (initial-life) - 80% (late-life, reflecting waterflood)
Asphaltenes/Wax/Scale
Analysis of the reservoir fluids' production chemistry was based on several downhole oil samples acquired from early appraisal wells. Laboratory evaluation of Shell-standard asphaltene screens indicated stability of individual reservoir crudes with respect to asphaltene precipitation (i.e. no production difficulties expected). Later analysis confirmed asphaltene stability of various crude blends at anticipated subsea and topsides conditions, as well as stability in presence of riser-base gas-lift.
The fluid wax assessment consisted of cloud and pour point measurements, HTGC (high-temperature gas chromatography), kinetic wax deposition rate measurements, and coupled modeling of oil thermodynamics and flowline thermal-hydraulics. Analysis indicated critical wax deposition temperatures (CWDT) in the range 98-115°F. Due to relatively low (kinetic) wax deposition rates and use of pipe-in-pipe flowline insulation (required for hydrate management; see below), annual maintenance pigging (or hot-oiling) was found to be sufficient for wax management.
Analysis of available water samples indicated minimal risk of barium-sulfate scale formation at all anticipated operating conditions.
Title: Bonga-Flow Assurance Benchmarking via Field Surveillance
Description:
Abstract
Bonga - the first Deepwater development in Nigeria - commenced production in Q4 2005.
At an early stage of the project, flow assurance was identified as a key factor for successful development, noting:complexities of the subsea network, including local downhill flow,logistical challenges of a new Deepwater basin, andreservoir fluids' propensity for solids formation, including additional risks posed by full-field waterflood.
This paper discusses the key elements of the Bonga flow assurance strategy and its implementation in design and operations, with particular focus on the flow assurance performance of the subsea system during initial start-up.
Comparisons of field data with analysis predictions include:steady-state thermal-hydraulic performance,system thermal response during cold start-up,cooldown performance of subsea hardware and flowlines,system blowdown effectiveness, including the effect of riser gas-lift andterrain slugging severity and gas-lift requirements.
Introduction
Bonga is operated by the Shell Nigeria Exploration and Production Company (SNEPCo) on behalf of the Nigerian National Petroleum Corporation (NNPC) under a production sharing contract, in partnership with Esso Exploration and Production Company Nigeria, Nigeria Agip Exploration, and Elf Petroleum Nigeria.
Bonga is comprised of subsea wells in approximately 1000 m water depth tied back 2-10 km - via five production manifolds and a dual flowline network - to a spread-moored FPSO.
Gas from Bonga is exported to the Nigeria Liquefied Natural Gas (NLNG) plant at Bonny, and oil is transported via tanker offloading.
As a vital part of the field development plan, full-field waterflood was initiated in conjunction with initial production.
See Figure 1 for a schematic of the Bonga subsea layout.
Flow Assurance Strategies
Solids characterization of the Bonga reservoir fluids and related flow assurance mitigation strategies addressed in the project design are summarized below.
Reservoir fluids
Bonga is comprised of several reservoirs, which exhibit the following variability in fluid properties over the anticipated field life:Reservoir temperature: 128-208° FOil gravity: 29-33° APIGas-Oil ratio: 550-1200 scf/stbWatercut: 0% (initial-life) - 80% (late-life, reflecting waterflood)
Asphaltenes/Wax/Scale
Analysis of the reservoir fluids' production chemistry was based on several downhole oil samples acquired from early appraisal wells.
Laboratory evaluation of Shell-standard asphaltene screens indicated stability of individual reservoir crudes with respect to asphaltene precipitation (i.
e.
no production difficulties expected).
Later analysis confirmed asphaltene stability of various crude blends at anticipated subsea and topsides conditions, as well as stability in presence of riser-base gas-lift.
The fluid wax assessment consisted of cloud and pour point measurements, HTGC (high-temperature gas chromatography), kinetic wax deposition rate measurements, and coupled modeling of oil thermodynamics and flowline thermal-hydraulics.
Analysis indicated critical wax deposition temperatures (CWDT) in the range 98-115°F.
Due to relatively low (kinetic) wax deposition rates and use of pipe-in-pipe flowline insulation (required for hydrate management; see below), annual maintenance pigging (or hot-oiling) was found to be sufficient for wax management.
Analysis of available water samples indicated minimal risk of barium-sulfate scale formation at all anticipated operating conditions.
Related Results
Evolving benchmarking practices: a review for research perspectives
Evolving benchmarking practices: a review for research perspectives
PurposeThe purpose of this study is to review a major section of the literature on benchmarking practices in order to achieve better perspectives for emerging benchmarking research...
Intelligent Drill-Stem Test for Well-Scale Flow Assurance Monitoring and Elemental Sulfur Deposition Prevention Enables Field Development in an Offshore Deep Gas Reservoir
Intelligent Drill-Stem Test for Well-Scale Flow Assurance Monitoring and Elemental Sulfur Deposition Prevention Enables Field Development in an Offshore Deep Gas Reservoir
Abstract
Flow assurance challenges pose significant risks for production. Lab-scale flow assurance experiments are common, but well-scale experiments are required du...
Perceptions about benchmarking best practices among French managers: an exploratory survey
Perceptions about benchmarking best practices among French managers: an exploratory survey
PurposeThe purpose of this study is to present a discussion on the most commonly accepted benchmarking norms in the USA, the lessons learned from benchmarking experiences and see h...
Improving SME logistics performance through benchmarking
Improving SME logistics performance through benchmarking
Purpose
The purpose of this paper is to discuss the applicability of current benchmarking proposals for small and medium-sized enterprises (SMEs) and to suggest a condensed process...
Barriers to internal benchmarking initiatives: an empirical investigation
Barriers to internal benchmarking initiatives: an empirical investigation
PurposeThe purpose of this paper is to focus on the identification of barriers to the implementation of benchmarking initiatives. Managers have little guidance on strategies for su...
An optimisational model of benchmarking
An optimisational model of benchmarking
PurposeThe purpose of this paper is to develop a quantitative methodology for benchmarking process which is simple, effective and efficient as a rejoinder to benchmarking detractor...
A review on benchmarking of supply chain performance measures
A review on benchmarking of supply chain performance measures
PurposeThe purpose of this paper is to redress the imbalances in the past literature of supply chain benchmarking and enhance data envelopment analysis (DEA) modeling approach in s...
La convention de courtage en matière d'assurance
La convention de courtage en matière d'assurance
La convention de courtage d’assurance constitue un accord d’intermédiation d’assurance conclu entre un courtier d’assurance et un preneur d’assurance en vue de la conclusion ou la ...