Bonga Northwest Subsurface Development – Planning, Execution and Uncertainty Management

View through CrossRef
The Bonga North West (BNW) field is located in Shell operated Oil Mining Lease (OML) 118, a deepwater development in Nigeria. This paper presents the BNW subsurface development strategy and the associated uncertainty management both at planning (Field Development Plan -FDP) and execute phase. The first development in the OML 118 acreage is the Bonga Main field which came on stream in November 2005 via a Floating, production, storage and offloading (FPSO) vessel. The development strategy of the block is to maximize value from the asset, ensuring that the hub is kept full by developing reservoirs in the nearby fields while optimizing production from the block. In pursuant of this strategy, detailed subsurface evaluations were carried out to estimate expected recovery of the nearby fields as potential tie-backs to the Bonga Main FPSO. The size of nearby discoveries and proximity to the FPSO were two key parameters used to develop the OML 118 development strategy. BNW was discovered in 2003 following the detailed interpretation of 3D seismic acquired in 1995 on the acreage. Integrated evaluation across key disciplines established commercial viability of the project. This, coupled with a detailed geo-hazard study, formed the basis for the 2011 BNW FDP. The FDP proposed the field being developed with nine wells in two phases of drilling. The development phasing was driven by the requirement to manage the field uncertainties by gathering additional data. The first phase development involves six wells (four oil producers and two water injectors). BNW leveraged on its close proximity to the existing Bonga Main infrastructure and was approved as a subsea tie back development to existing Bonga Main FPSO. The FDP enabled a robust management of challenges such as shallow gas occurrence, structural/depth uncertainty, stratigraphic/reservoir development, reservoir connectivity, fluid prediction in the shallow horizons, bore hole stability and overburden shale issues encountered in the execution phase. Also a new technology that targeted managing of impairments in water injection wells experienced in the operation of Bonga Main field was also successfully deployed in the BNW field development. All Phase 1 development wells have been successfully drilled and several learnings from this project have been documented and will be used on projects going forward.
Title: Bonga Northwest Subsurface Development – Planning, Execution and Uncertainty Management
Description:
The Bonga North West (BNW) field is located in Shell operated Oil Mining Lease (OML) 118, a deepwater development in Nigeria.
This paper presents the BNW subsurface development strategy and the associated uncertainty management both at planning (Field Development Plan -FDP) and execute phase.
The first development in the OML 118 acreage is the Bonga Main field which came on stream in November 2005 via a Floating, production, storage and offloading (FPSO) vessel.
The development strategy of the block is to maximize value from the asset, ensuring that the hub is kept full by developing reservoirs in the nearby fields while optimizing production from the block.
In pursuant of this strategy, detailed subsurface evaluations were carried out to estimate expected recovery of the nearby fields as potential tie-backs to the Bonga Main FPSO.
The size of nearby discoveries and proximity to the FPSO were two key parameters used to develop the OML 118 development strategy.
BNW was discovered in 2003 following the detailed interpretation of 3D seismic acquired in 1995 on the acreage.
Integrated evaluation across key disciplines established commercial viability of the project.
This, coupled with a detailed geo-hazard study, formed the basis for the 2011 BNW FDP.
The FDP proposed the field being developed with nine wells in two phases of drilling.
The development phasing was driven by the requirement to manage the field uncertainties by gathering additional data.
The first phase development involves six wells (four oil producers and two water injectors).
BNW leveraged on its close proximity to the existing Bonga Main infrastructure and was approved as a subsea tie back development to existing Bonga Main FPSO.
The FDP enabled a robust management of challenges such as shallow gas occurrence, structural/depth uncertainty, stratigraphic/reservoir development, reservoir connectivity, fluid prediction in the shallow horizons, bore hole stability and overburden shale issues encountered in the execution phase.
Also a new technology that targeted managing of impairments in water injection wells experienced in the operation of Bonga Main field was also successfully deployed in the BNW field development.
All Phase 1 development wells have been successfully drilled and several learnings from this project have been documented and will be used on projects going forward.

Related Results

New Perspectives for 3D Visualization of Dynamic Reservoir Uncertainty
New Perspectives for 3D Visualization of Dynamic Reservoir Uncertainty
This reference is for an abstract only. A full paper was not submitted for this conference. Abstract 1 Int...
Bonga-Flow Assurance Benchmarking via Field Surveillance
Bonga-Flow Assurance Benchmarking via Field Surveillance
Abstract Bonga - the first Deepwater development in Nigeria - commenced production in Q4 2005. At an early stage of the project, flow assurance was identified as ...
Reserves Uncertainty Calculation Accounting for Parameter Uncertainty
Reserves Uncertainty Calculation Accounting for Parameter Uncertainty
Abstract An important goal of geostatistical modeling is to assess output uncertainty after processing realizations through a transfer function, in particular, to...
Deformations caused by subsurface heat islands: a study on the Chicago Loop
Deformations caused by subsurface heat islands: a study on the Chicago Loop
The ground beneath urban areas is warming up due to anthropogenic activity, leading to subsurface urban heat islands [1]. A recent review of the literature suggests that subsurface...
The uncertainty–investment relationship: scrutinizing the role of firm size
The uncertainty–investment relationship: scrutinizing the role of firm size
PurposeThe objective of this paper is threefold. First, it aims to empirically study whether firm-specific/idiosyncratic uncertainty, macroeconomic/aggregate uncertainty and politi...
Bonga Mooring Top Chain Replacement Project – Lessons Learnt from Execution
Bonga Mooring Top Chain Replacement Project – Lessons Learnt from Execution
Abstract Mooring systems are typically designed to secure floaters in position (within prescribed limits). For floating production platforms considering the FPSO typ...
Modelling subsurface melt of Swiss glaciers
Modelling subsurface melt of Swiss glaciers
Glacier subsurface melt, consisting of englacial and basal melt, is far less understood than surface mass balance. Yet it represents a potentially relevant component of glacier ret...
First Rigless Intervention in Bonga Deepwater
First Rigless Intervention in Bonga Deepwater
Abstract In the Bonga Deepwater project, while exploring subsea well intervention and stimulation campaign opportunity, the subsea Rigless intervention strategy, whi...