Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Analisa Penjadwalan Produksi Dengan Metode Campbell Dudek Smith Untuk Meminimasi Makespan di CV. YZX

View through CrossRef
CV YZX is a manufacturing company in the stainless steel hardware sector that specializes in hardware and detailing. This company actively produces for the needs of individual consumers and orders from other companies. One of the problems faced by CV YZX is the use of production machines that are less than optimal at every stage of the production process. Production machine performance that is not optimal can increase the total value of production time (makespan), which in turn can cause delays in completing products and delivery to consumers. This research aims to find the minimum total production time value by applying the Campbell Dudek Smith method to production scheduling. The calculation results show that by applying the First Come First Serve (FCFS) production scheduling method, the company obtained a makespan of 39.64 hours. However, by using the proposed method, namely Campbell Dudek Smith (CDS) in production scheduling, the results of the makespan calculation show a figure of 33.58 hours. A comparison of the two methods shows that the proposed scheduling using the Campbell Dudek Smith method has a lower makespan value compared to the company method (FCFS), resulting in time savings of 6.06 hours or the equivalent of 15,3%.
Title: Analisa Penjadwalan Produksi Dengan Metode Campbell Dudek Smith Untuk Meminimasi Makespan di CV. YZX
Description:
CV YZX is a manufacturing company in the stainless steel hardware sector that specializes in hardware and detailing.
This company actively produces for the needs of individual consumers and orders from other companies.
One of the problems faced by CV YZX is the use of production machines that are less than optimal at every stage of the production process.
Production machine performance that is not optimal can increase the total value of production time (makespan), which in turn can cause delays in completing products and delivery to consumers.
This research aims to find the minimum total production time value by applying the Campbell Dudek Smith method to production scheduling.
The calculation results show that by applying the First Come First Serve (FCFS) production scheduling method, the company obtained a makespan of 39.
64 hours.
However, by using the proposed method, namely Campbell Dudek Smith (CDS) in production scheduling, the results of the makespan calculation show a figure of 33.
58 hours.
A comparison of the two methods shows that the proposed scheduling using the Campbell Dudek Smith method has a lower makespan value compared to the company method (FCFS), resulting in time savings of 6.
06 hours or the equivalent of 15,3%.

Related Results

MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
Analisis waktu standar produksi merupakan salah satu analisis metoda kuantitatif yang dilakukan untuk mengukur waktu produksi dan bertujuan agar dapat memiliki waktu standar sebaga...
Analisis Metode NEH Untuk Meminimalkan Makespan Pada Penjadwalan Produksi di Rumah Industri Wahyu
Analisis Metode NEH Untuk Meminimalkan Makespan Pada Penjadwalan Produksi di Rumah Industri Wahyu
Pemenuhan kebutuhan dari permintaan konsumen dengan waktu yang telah di tetapkan akan berdampak pada kepuasan konsumen terhadap suatu produk sehingga akan meningkatkan jumlah permi...
Plasma AR Alterations and Timing of Intensified Hormone Treatment for Prostate Cancer
Plasma AR Alterations and Timing of Intensified Hormone Treatment for Prostate Cancer
This randomized clinical trial explores whether hormone intensification at start of androgen deprivation therapy alters selection of androgen receptor (AR) gene alterations within ...
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature  Review Anna Tri Wahyuni1), Masfuri2),  Liya Arista3)1,2,3 Fakultas Ilmu Keperawatan Univers...
PENJADWALAN DAN PENGEMBANGAN RENCANA KERJA DI INDUSTRI YOGHURT
PENJADWALAN DAN PENGEMBANGAN RENCANA KERJA DI INDUSTRI YOGHURT
Penjadwalan dan perencanaan kerja pada industri diperlukan untuk memastikan ketepatan dan efisiensi waktu  proses produksi. Industri yoghurt berbahan baku susu yang rentan terkonta...
PEMODELAN SISTEM PENJADWALAN PERKULIAHAN MENGGUNAKAN ALGORITMA GENETIKA
PEMODELAN SISTEM PENJADWALAN PERKULIAHAN MENGGUNAKAN ALGORITMA GENETIKA
Penjadwalan perkuliahan merupakan kegiatan pembuatan jadwal kuliah pada perguruan tinggi. Jadwal kuliah tersebut akan dijadikan sebagai acuan kegiatan belajar mengajar selama satu ...
Penjadwalan Produksi dengan Algoritma Semut
Penjadwalan Produksi dengan Algoritma Semut
PT XYZ adalah perusahaan yang memproduksi jenis crumb, dalam memproduksi baja tersebut waktu yang dbutuhkan untuk memenuhi permintaan konsumen adalah 24 jam berturut- turut dengan ...
Perancangan Sistem Penjadwalan Produksi Kaos Sablon Dengan Metode Earliest Due Date Pada Usaha Konveksi Nolabel Sablon Langsa
Perancangan Sistem Penjadwalan Produksi Kaos Sablon Dengan Metode Earliest Due Date Pada Usaha Konveksi Nolabel Sablon Langsa
Usaha Konveksi Nolabel Sablon Langsa beralamat di Gampong Paya Bujok Seuleumak Kota Langsa, merupakan usaha screen printing yang bergerak pada bidang kaos sablon yang dibuat menuru...

Back to Top