Earned value‐based performance monitoring of facility construction projects

View through CrossRef
Purpose The purpose of this paper is to contribute to the diffusion of earned value management (EVM) as a practicable methodology to monitor facility construction and renovation projects in the context of the European industry. Design/methodology/approach First, a review of the literature reveals how EVM evolved as a tool for facility construction project monitoring together with specific concerns for its application. Then, a review of EVM practice and trends in Europe is provided and finally, applicability and viability of the method is proved through a case demonstration. Findings EVM practice in the European construction industry is found to be lagging behind other experienced countries and industries, despite EVM having been found to be applicable, adaptable, and predictive of integrated final cost and schedule of facility construction projects. In particular, cost estimate at completion is forecasted by a simple cost performance index (CPI), while for the time estimate at completion, the earned schedule concept is revealed as an accurate predictor. Research limitations/implications The paper urges the need for research of a European standard as a primary factor for successful diffusion of EVM usage in architecture, engineering and construction projects. Practical implications This paper helps practitioners to understand the adaptability of EVM practice in the European construction industry and to apply EV tools for effective monitoring of the performance of their projects. Originality/value Current trends of EVM practice in the European construction context are presented and suggestions for sustaining the diffusion of EVM are given.
Title: Earned value‐based performance monitoring of facility construction projects
Description:
Purpose The purpose of this paper is to contribute to the diffusion of earned value management (EVM) as a practicable methodology to monitor facility construction and renovation projects in the context of the European industry.
Design/methodology/approach First, a review of the literature reveals how EVM evolved as a tool for facility construction project monitoring together with specific concerns for its application.
Then, a review of EVM practice and trends in Europe is provided and finally, applicability and viability of the method is proved through a case demonstration.
Findings EVM practice in the European construction industry is found to be lagging behind other experienced countries and industries, despite EVM having been found to be applicable, adaptable, and predictive of integrated final cost and schedule of facility construction projects.
In particular, cost estimate at completion is forecasted by a simple cost performance index (CPI), while for the time estimate at completion, the earned schedule concept is revealed as an accurate predictor.
Research limitations/implications The paper urges the need for research of a European standard as a primary factor for successful diffusion of EVM usage in architecture, engineering and construction projects.
Practical implications This paper helps practitioners to understand the adaptability of EVM practice in the European construction industry and to apply EV tools for effective monitoring of the performance of their projects.
Originality/value Current trends of EVM practice in the European construction context are presented and suggestions for sustaining the diffusion of EVM are given.

Related Results

ANALISIS FAKTOR PERFORMA DENGAN METODE EARNED SCHEDULE
ANALISIS FAKTOR PERFORMA DENGAN METODE EARNED SCHEDULE
Every construction project contains a project implementation plan from the beginning to the end of the project. A proven method to determine the estimated project duration is the e...
PERHITUNGAN DURASI PROYEK JALAN TOL DENGAN METODE EARNED SCHEDULE
PERHITUNGAN DURASI PROYEK JALAN TOL DENGAN METODE EARNED SCHEDULE
The slower-than-anticipated progress of construction projects is a common complaint in Indonesia. Several methods have been developed to address this issue, and the Earned Schedule...
Recommendations for Social Media Use in Hospitals and Health Care Facilities
Recommendations for Social Media Use in Hospitals and Health Care Facilities
Social Media is the new avenue for creating connections and sharing of information.  Through social media, one can reach a global community.   In recent years, we have seen how soc...
Performative Microforests
Performative Microforests
The design of office buildings can substantially improve the building, social, and ecological performance of office building projects. However, existing research on improving the p...
The Ontology of Lean Construction 4.0 in the Construction Industry
The Ontology of Lean Construction 4.0 in the Construction Industry
L'ontologie du Lean Construction 4.0 dans l'industrie de la construction Cette recherche se concentre sur l'amélioration de l'industrie de la construction; avec un ...
Unveiling Construction Quality Factors: Insights from Asian Economy's Building Projects
Unveiling Construction Quality Factors: Insights from Asian Economy's Building Projects
Economic growth of any country depends on the construction projects and industry in the region. Therefore, the construction industry in Pakistan is directly related to quality and ...
Design And Operation Of The Levelland Unit CO2 Injection Facility
Design And Operation Of The Levelland Unit CO2 Injection Facility
Abstract The Levelland CO2 Facility provides CO2 storageand handling capacity for the five CO2 injection pilots located in the Levelland Unit. Facilities pilots l...

Back to Top