Tinjauan Elevasi Puncak Bangunan Seawall di Pantai Galesong Utara
View through CrossRef
This study aims to review the use of vertical datumand determine the elevation of seawall constructions based on thesea level design. The sea level design used as a vertical referenceis MSL and LWS. The elevation of the seawall construction fromthe two references above then compared to the elevation of theseawall construction listed in the as built drawing documentduring construction. The MSL value is obtained from the tidalanalysis by using Doodson method based on direct observationfor 39 hours, while the LWS value is obtained by taking intoaccount the position of the range of tide at Tide Station inMakassar. Seawall elevation is obtained by terrestrialmeasurements using the Total Station by measuring the height ofthe top position of the seawall construction against the sea leveldesign through the Bench Mark. The seawall top elevation datacollection is done every one meter along 274 meters. The resultsobtained from measuring seawall construction elevation are +2,251 meters if using reference to MSL and +2,911 meters if usinga reference to LWS, while the elevation in the as built drawingdocument is +4,000 meters unknown what vertical reference isused as a reference.
Title: Tinjauan Elevasi Puncak Bangunan Seawall di Pantai Galesong Utara
Description:
This study aims to review the use of vertical datumand determine the elevation of seawall constructions based on thesea level design.
The sea level design used as a vertical referenceis MSL and LWS.
The elevation of the seawall construction fromthe two references above then compared to the elevation of theseawall construction listed in the as built drawing documentduring construction.
The MSL value is obtained from the tidalanalysis by using Doodson method based on direct observationfor 39 hours, while the LWS value is obtained by taking intoaccount the position of the range of tide at Tide Station inMakassar.
Seawall elevation is obtained by terrestrialmeasurements using the Total Station by measuring the height ofthe top position of the seawall construction against the sea leveldesign through the Bench Mark.
The seawall top elevation datacollection is done every one meter along 274 meters.
The resultsobtained from measuring seawall construction elevation are +2,251 meters if using reference to MSL and +2,911 meters if usinga reference to LWS, while the elevation in the as built drawingdocument is +4,000 meters unknown what vertical reference isused as a reference.
Related Results
Indeks Kerentanan Wilayah Pesisir Kecamatan Galesong Kabupaten Takalar
Indeks Kerentanan Wilayah Pesisir Kecamatan Galesong Kabupaten Takalar
Permasalahan di wilayah pesisir sangat sensitif dan rentan terhadap fenomena alam karena merupakan suatu wilayah yang rentan terhadap faktor lingkungan antara lain laju perubahan g...
KARAKTERISTIK PANTAI PULAU LAUT-SEKATUNG (SALAH SATU PULAU TERLUAR NKRI)
KARAKTERISTIK PANTAI PULAU LAUT-SEKATUNG (SALAH SATU PULAU TERLUAR NKRI)
Pulau Laut-Sekatung adalah salah satu pulau terluar Negara Republik Indonesia yang berbatasan dengan perairan Malaysia Timur. Pulau ini terletak di laut Cina Selatan sebagai bagian...
EVALUASI PENGGUNAAN LAHAN DI KAWASAN SEMPADAN PANTAI TANJUNG UBAN KECAMATAN BINTAN UTARA
EVALUASI PENGGUNAAN LAHAN DI KAWASAN SEMPADAN PANTAI TANJUNG UBAN KECAMATAN BINTAN UTARA
Peraturan Daerah (Perda) Kabupaten Bintan No. 1 Tahun 2020 menjelaskan adanya melarang mendirikan bangunan pada sempadan pantai khususnya permukiman. Pada kondisi aktual saat ini s...
Analysis of the influence about back side sand pile on the stability and deformation of the Pile foundation frame Seawall
Analysis of the influence about back side sand pile on the stability and deformation of the Pile foundation frame Seawall
Abstract
The article analyzes the influence about backwater side sand piling of a Pile-based frame Seawall along the east coast of Zhejiang on the stability and defo...
ARSITEKTUR KONTEKSTUAL PADA RANCANGAN BANGUNAN GALERI NASIONAL INDONESIA
ARSITEKTUR KONTEKSTUAL PADA RANCANGAN BANGUNAN GALERI NASIONAL INDONESIA
Pada tahun 2013, Galeri Nasional Indonesia bersama dengan Ikatan Arsitek Indonesia Jakarta menggagas pengembangan bangunan Galeri Nasional Indonesia bersamaan dengan rencana utama ...
Evaluasi Kesesuaian Pola Bangunan Lembaga Pembinaan Khusus Anak dan Lembaga Pemasyarakatan Perempuan
Evaluasi Kesesuaian Pola Bangunan Lembaga Pembinaan Khusus Anak dan Lembaga Pemasyarakatan Perempuan
Fungsi dan Tujuan dari pendirian Lembaga Pemasyarakatan menjadikan pembangunannya tak dapat dilakukan secara asal, diperlukan standar dan standarisasi agar bangunan Lembaga Pemasya...
The three-dimensional numerical analysis of the impact of newly Seawall with inner epeirogenic through blowpipe to adjacent pile foundation of bridge
The three-dimensional numerical analysis of the impact of newly Seawall with inner epeirogenic through blowpipe to adjacent pile foundation of bridge
Abstract
The internal force and deformation of the adjacent bridge pile foundation is influenced by newly Seawall with inner epeirogenic through blowpipe, which may ...
Analisis Struktur Bangunan Rumah Tinggal di Desa Jumoyo yang Berisiko Terhadap Banjir Lahar Dingin Gunung Merapi
Analisis Struktur Bangunan Rumah Tinggal di Desa Jumoyo yang Berisiko Terhadap Banjir Lahar Dingin Gunung Merapi
Desa Jumoyo merupakan daerah rawan bencana yang salah satunya disebabkan oleh banjir lahar dingin. Banjir lahar dingin dari erupsi Gunung Merapi telah menyebabkan kerusakan banguna...