USULAN PERAWATAN MESIN PRODUKSI CAIRAN DALAM BERDASARKAN ANALISIS METODE RELIABILITY CENTERED MAINTENANCE (RCM)
View through CrossRef
PT Aksamala Adi Andana is a startup company in the health sector, one of the products produced, namely Vitabumin. the product is produced in the internal liquid product department which uses several production machines with different functions. The machine often experiences damage to cause downtime, so this study aims to propose a maintenance schedule using the Reliability Centered Maintenance (RCM) method. The results of this study obtained several components of the production machine that must be scheduled for replacement maintenance, including, label shrink steam machine on heating element components every 700 hours, safety valve 500 hours, flexible house 900 hours, steam exhaust 2043 hours, honey pump machine for bearing components every 800 hours, BB04 seal 700 hours, igear boxes 3091 hours. filling machine for nozzle components 800 hours, piston seal 800 hours, valve TG-23 3283 hours. On the capping machine on the spring component 1296 hours, chuks 672. The ink jet machine is in the filter component 2016 hours, and the print head 624 hours. Then for the estimated replacement maintenance costs for a period of one year based on the proposed interval time on the heating element component IDR 14,638,985, valve safety IDR 3,623,673, flexible house IDR 12,620,894, bearing IDR 271,287, seal BB04 IDR 1,877,927, nozzle IDR 13,520,445, and piston seal components IDR 37,828,337. spring IDR 40,000, chuks IDR 320,000, filter IDR 100,000, and print head components IDR 1,100,000.
Institut Sains and Teknologi AKPRIND Yogyakarta
Title: USULAN PERAWATAN MESIN PRODUKSI CAIRAN DALAM BERDASARKAN ANALISIS METODE RELIABILITY CENTERED MAINTENANCE (RCM)
Description:
PT Aksamala Adi Andana is a startup company in the health sector, one of the products produced, namely Vitabumin.
the product is produced in the internal liquid product department which uses several production machines with different functions.
The machine often experiences damage to cause downtime, so this study aims to propose a maintenance schedule using the Reliability Centered Maintenance (RCM) method.
The results of this study obtained several components of the production machine that must be scheduled for replacement maintenance, including, label shrink steam machine on heating element components every 700 hours, safety valve 500 hours, flexible house 900 hours, steam exhaust 2043 hours, honey pump machine for bearing components every 800 hours, BB04 seal 700 hours, igear boxes 3091 hours.
filling machine for nozzle components 800 hours, piston seal 800 hours, valve TG-23 3283 hours.
On the capping machine on the spring component 1296 hours, chuks 672.
The ink jet machine is in the filter component 2016 hours, and the print head 624 hours.
Then for the estimated replacement maintenance costs for a period of one year based on the proposed interval time on the heating element component IDR 14,638,985, valve safety IDR 3,623,673, flexible house IDR 12,620,894, bearing IDR 271,287, seal BB04 IDR 1,877,927, nozzle IDR 13,520,445, and piston seal components IDR 37,828,337.
spring IDR 40,000, chuks IDR 320,000, filter IDR 100,000, and print head components IDR 1,100,000.
Related Results
Effect Western Medicines Combined With Nao-Xue-Shu in Patients With Hypertensive Intracerebral Hemorrhage: A Network Meta-Analysis
Effect Western Medicines Combined With Nao-Xue-Shu in Patients With Hypertensive Intracerebral Hemorrhage: A Network Meta-Analysis
Purpose: To explore the efficacy of nimodipine, nifedipine, and edaravone (EDA) combined with Nao-Xue-Shu in patients with hypertensive intracerebral hemorrhage (HICH) and to deter...
Usulan Perencanaan Pemeliharaan Mesin Cetak GTO Menggunakan Metode Reliability Centered Maintenance (RCM) II
Usulan Perencanaan Pemeliharaan Mesin Cetak GTO Menggunakan Metode Reliability Centered Maintenance (RCM) II
Abstract. PT.Granesia is a company engaged in printing and publishing. The obstacle experienced by PT.Granesia when carrying out the production process is the number of defective p...
Perancangan Model Simulasi dan Perbaikan Lini Produksi Pompa Air Tipe PS – 135 E Menggunakan Simulasi Diskrit dan Theory Of Constraint pada PT. Tirta Intimizu Nusantara
Perancangan Model Simulasi dan Perbaikan Lini Produksi Pompa Air Tipe PS – 135 E Menggunakan Simulasi Diskrit dan Theory Of Constraint pada PT. Tirta Intimizu Nusantara
Intisari— Permasalahan yang dialami oleh perusahaan adalah target produksi yang tidak tercapai. Hal tersebut terjadi pada lini produksi pompa air tipe PS - 135 E yang disebabkan ol...
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
Analisis waktu standar produksi merupakan salah satu analisis metoda kuantitatif yang dilakukan untuk mengukur waktu produksi dan bertujuan agar dapat memiliki waktu standar sebaga...
ANALISIS DAN PERANCANGAN SISTEM PENJADWALAN OPTIMUM PREVENTIVE MAINTENANCE MACINE MOLDING INJECTION DAN BLOW MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE (RCM)
ANALISIS DAN PERANCANGAN SISTEM PENJADWALAN OPTIMUM PREVENTIVE MAINTENANCE MACINE MOLDING INJECTION DAN BLOW MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE (RCM)
Perawatan mesin merupakan suatu kegiatan yang harus dilakukan secara maksimal agar kondisi mesin tetap terjaga dan mencegah terjadinya kerusakan secara tiba-tiba. PT Mandom Indones...
USULAN PERAWATAN MAINTANANCE TASK UNTUK MESIN B-67 DENGAN PENDEKATAN METODE REALIBILITY CENTERED MAINTANANCE DI PT BUMIMULIA INDAH LESTARI PLANT GRESIK (Studi Kasus PT BUMIMULIA INDAH LESTARI PLANT GRESIK)
USULAN PERAWATAN MAINTANANCE TASK UNTUK MESIN B-67 DENGAN PENDEKATAN METODE REALIBILITY CENTERED MAINTANANCE DI PT BUMIMULIA INDAH LESTARI PLANT GRESIK (Studi Kasus PT BUMIMULIA INDAH LESTARI PLANT GRESIK)
PT Bumimulia Indah Lestari – Gresik adalah salah satu cabang perusahaan yang bergerak di bidang pembuatan botol kemasan plastik. Terdapat tujuh mesin yang di gunakan untuk memprodu...
EFEKTIVITAS DAN EFISIENSI MESIN-MESIN DALAM SATU RANGKAIAN PADA PROSES PRODUKSI KAYU LAPIS (STUDI KASUS DI PT SURYA SATRYA TIMUR)
EFEKTIVITAS DAN EFISIENSI MESIN-MESIN DALAM SATU RANGKAIAN PADA PROSES PRODUKSI KAYU LAPIS (STUDI KASUS DI PT SURYA SATRYA TIMUR)
This research aims to analyze the effectiveness and efficiency value of plywood production machines. This research was conducted by observing and recording the production flow or w...
mesin bubut
mesin bubut
Perkembangan teknologi komputer saat ini telah mengalami kemajuan yang amat pesat. Dalam hal ini komputer telah diaplikasikan ke dalam alat-alat mesin perkakas di antaranya mesin b...