Design Consideration Including Construction Stage Analysis for the Cable Stayed Bridge (FB01-Marina Bridge) in Port City Colombo Project, Sri Lanka

View through CrossRef
<p>Port City Colombo developed by CHEC Port City Colombo (Pvt) Ltd through China Harbour Engineering Company (CHEC) is a pristine city development in Colombo, Sri Lanka, spanning 269 hectares. Port City Colombo, built as an extension of Sri Lanka’s vibrant capital city Colombo, once completed, would be South Asia’s premiere residential, retail and business destination.</p><p>Atkins, a member of the SNC Lavalin Group, was appointed by CHEC Port City Colombo (Private) Limited to provide Consultancy Services for the design of all Infrastructure and Landscape works, public realm and associated infrastructure in Colombo Port City. This paper discusses the design criteria of the marina cable stayed foot bridge (FB01) in depth including the construction stage and service stage analysis and design checks.</p>
International Association for Bridge and Structural Engineering (IABSE)
Title: Design Consideration Including Construction Stage Analysis for the Cable Stayed Bridge (FB01-Marina Bridge) in Port City Colombo Project, Sri Lanka
Description:
<p>Port City Colombo developed by CHEC Port City Colombo (Pvt) Ltd through China Harbour Engineering Company (CHEC) is a pristine city development in Colombo, Sri Lanka, spanning 269 hectares.
Port City Colombo, built as an extension of Sri Lanka’s vibrant capital city Colombo, once completed, would be South Asia’s premiere residential, retail and business destination.
</p><p>Atkins, a member of the SNC Lavalin Group, was appointed by CHEC Port City Colombo (Private) Limited to provide Consultancy Services for the design of all Infrastructure and Landscape works, public realm and associated infrastructure in Colombo Port City.
This paper discusses the design criteria of the marina cable stayed foot bridge (FB01) in depth including the construction stage and service stage analysis and design checks.
</p>.

Related Results

SEISMIC VULNERABILITY ANALYSIS OF CABLE-STAYED BRIDGE DURING ROTATION CONSTRUCTION
SEISMIC VULNERABILITY ANALYSIS OF CABLE-STAYED BRIDGE DURING ROTATION CONSTRUCTION
          Due to the swivel construction, the structural redundancy of cable-stayed bridge is reduced, and its seismic vulnerability is significantly higher than that of non-swirli...
Behavior of partially earth anchored cable-stayed bridge considering construction phase and operational phase
Behavior of partially earth anchored cable-stayed bridge considering construction phase and operational phase
<p>In this study, the behavior of a cable-stayed bridge with a partially earth anchored cable system was studied both for the construction phase and for the operational phase...
Numerical Analysis of Long-Span Cable-Stayed Bridge in the Construction Phase
Numerical Analysis of Long-Span Cable-Stayed Bridge in the Construction Phase
The fabrication and erection of cable-stayed bridges involve major changes in structure configuration through the addition and removal of structure components. In every stage of th...
Mechanical Analysis of Stayed Bridge
Mechanical Analysis of Stayed Bridge
Cable stayed bridge, also known as the cable-stayed bridge is of box girder with many cable directly to the towers is a kind of bridge, is by the pressure of the tower, tension of ...
Construction control of cable-stayed bridges
Construction control of cable-stayed bridges
This work presents a study of the simulation of cable-stayed bridges built on temporary supports focused on their response during construction and in service. To simulate the behav...
Study of Port Tariff Structure and Port Pricing Approach
Study of Port Tariff Structure and Port Pricing Approach
In order to support National Logistics System continuity there are at least three (3) main components that should synergize well, namely the sea side (sea transport), the land side...
Long-Term Monitoring of Cable Tension Force in Cable-stayed Bridges using the Vibration Method. The Case Study of Binh Bridge, Vietnam
Long-Term Monitoring of Cable Tension Force in Cable-stayed Bridges using the Vibration Method. The Case Study of Binh Bridge, Vietnam
The tension force of a cable is an important parameter used to ensure the stable and safe working of cable-stayed bridges. This parameter needs to be strictly controlled throughout...