Evaluation of Cable Force Changes Effects on Cable Stayed Bridge
View through CrossRef
The proposed bridge, which is cable stayed bridge crosses the Hlaing River that flows through Western Yangon. It was completed in 2000 and is currently used to connect Insein Township with Hlaing Tharyar Township. It has the 20 years' service life. It requires the inspection and the evaluation of the real condition of the structure. As cable element plays an important role in cable structures, evaluation of the real state of the stay cable is one of the main focuses of the cable stayed bridge. Firstly, in the research work all cables are inspected to evaluate the current condition of the cables with included visual inspection and vibration-based cable force measurement method. With the help of static and moving load analysis, the effect of force change cables in which the successive force changes are considered, and the possible cable loss effect on the structural behavior of the bridge are also investigated. The finite element model of the cable stayed bridge is developed based on the geometric shape and material properties from MOC and is modelled with finite element software MIDAS Civil. The tension forces obtained by inspection over years (2000 to 2018) using vibration-based measurements method are compared with the measured intact cable forces. According to the results of the data analysis, it is observed that the cables force variations of the seven cables are abnormal conditions. In order to evaluate the condition of a bridge effected by cable force variation, the two parameters are considered; percentage increase in tension stress of all cables and percentage increase in deflection of the deck. The present study describes the structural response of the bridge in order to evaluate the actual safety of the bridge with abnormal force change cables, and also examines the consequences of one cable failure. Doi: 10.28991/cej-2020-03091609 Full Text: PDF
Title: Evaluation of Cable Force Changes Effects on Cable Stayed Bridge
Description:
The proposed bridge, which is cable stayed bridge crosses the Hlaing River that flows through Western Yangon.
It was completed in 2000 and is currently used to connect Insein Township with Hlaing Tharyar Township.
It has the 20 years' service life.
It requires the inspection and the evaluation of the real condition of the structure.
As cable element plays an important role in cable structures, evaluation of the real state of the stay cable is one of the main focuses of the cable stayed bridge.
Firstly, in the research work all cables are inspected to evaluate the current condition of the cables with included visual inspection and vibration-based cable force measurement method.
With the help of static and moving load analysis, the effect of force change cables in which the successive force changes are considered, and the possible cable loss effect on the structural behavior of the bridge are also investigated.
The finite element model of the cable stayed bridge is developed based on the geometric shape and material properties from MOC and is modelled with finite element software MIDAS Civil.
The tension forces obtained by inspection over years (2000 to 2018) using vibration-based measurements method are compared with the measured intact cable forces.
According to the results of the data analysis, it is observed that the cables force variations of the seven cables are abnormal conditions.
In order to evaluate the condition of a bridge effected by cable force variation, the two parameters are considered; percentage increase in tension stress of all cables and percentage increase in deflection of the deck.
The present study describes the structural response of the bridge in order to evaluate the actual safety of the bridge with abnormal force change cables, and also examines the consequences of one cable failure.
Doi: 10.
28991/cej-2020-03091609 Full Text: PDF.
Related Results
Life-Cycle Cost Analysis of Long-Span CFRP Cable-Stayed Bridges
Life-Cycle Cost Analysis of Long-Span CFRP Cable-Stayed Bridges
With the advantages of high strength, light weight, high corrosion and fatigue resistance, and low relaxation, carbon-fiber-reinforced polymer (CFRP) is an excellent cable material...
Performance Assessment of Repair and Reinforcement of Concrete Cable-Stayed Bridges in Service Based on Time-Dependent Reliability under Environmental Sustainability Development
Performance Assessment of Repair and Reinforcement of Concrete Cable-Stayed Bridges in Service Based on Time-Dependent Reliability under Environmental Sustainability Development
The reliability of concrete cable-stayed bridge structure is time variant. This is due to strength deterioration and time-variant mechanical and environmental loadings. Demands for...
SEISMIC VULNERABILITY ANALYSIS OF CABLE-STAYED BRIDGE DURING ROTATION CONSTRUCTION
SEISMIC VULNERABILITY ANALYSIS OF CABLE-STAYED BRIDGE DURING ROTATION CONSTRUCTION
Due to the swivel construction, the structural redundancy of cable-stayed bridge is reduced, and its seismic vulnerability is significantly higher than that of non-swirli...
At Sea Test: Hawaii Deepwater Cable Program
At Sea Test: Hawaii Deepwater Cable Program
ABSTRACT
In order to investigate and demonstrate the technical feasibility of laying a Submarine power cable in the open ocean, in depths exceeding 6000 feet, ove...
Mechanical Analysis of Stayed Bridge
Mechanical Analysis of Stayed Bridge
Cable stayed bridge, also known as the cable-stayed bridge is of box girder with many cable directly to the
towers is a kind of bridge, is by the pressure of the tower, tension of ...
Long-Term Monitoring of Cable Tension Force in Cable-stayed Bridges using the Vibration Method. The Case Study of Binh Bridge, Vietnam
Long-Term Monitoring of Cable Tension Force in Cable-stayed Bridges using the Vibration Method. The Case Study of Binh Bridge, Vietnam
The tension force of a cable is an important parameter used to ensure the stable and safe working of cable-stayed bridges. This parameter needs to be strictly controlled throughout...
Behavior of partially earth anchored cable-stayed bridge considering construction phase and operational phase
Behavior of partially earth anchored cable-stayed bridge considering construction phase and operational phase
<p>In this study, the behavior of a cable-stayed bridge with a partially earth anchored cable system was studied both for the construction phase and for the operational phase...
Mechanical properties analysis of a cable-stayed bridge without backcables under the influence of temperature and inclination angle
Mechanical properties analysis of a cable-stayed bridge without backcables under the influence of temperature and inclination angle
Cable-stayed bridge without backcables is an important branch of the cable-stayed bridge family. It tilts the bridge tower to one side and removes the cable behind it. It balances ...