Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Behavior of partially earth anchored cable-stayed bridge considering construction phase and operational phase

View through CrossRef
<p>In this study, the behavior of a cable-stayed bridge with a partially earth anchored cable system was studied both for the construction phase and for the operational phase. The recently constructed 3- span cable-stayed bridge with a usual self anchored cable system in Korea was modified into a partially earth anchored cable system. According to the FCM construction method, the construction sequence analysis was performed to find optimal cable stressing forces. Effects of the systems with partially earth anchored cables were examined by comparing the self anchored cable system.</p> <p>The behavior of the partially earth anchored cable-stayed bridge in the operational phase was investigated. The live load analysis was carried out according to the Korean vehicle class. Also, the response spectrum analysis for the seismic load and the buffeting analysis for the wind dynamic load were carried out. From these results, it is shown that the partially earth anchored cable-stayed bridge increases the resistant capacity against the service loads.</p>
International Association for Bridge and Structural Engineering (IABSE)
Title: Behavior of partially earth anchored cable-stayed bridge considering construction phase and operational phase
Description:
<p>In this study, the behavior of a cable-stayed bridge with a partially earth anchored cable system was studied both for the construction phase and for the operational phase.
The recently constructed 3- span cable-stayed bridge with a usual self anchored cable system in Korea was modified into a partially earth anchored cable system.
According to the FCM construction method, the construction sequence analysis was performed to find optimal cable stressing forces.
Effects of the systems with partially earth anchored cables were examined by comparing the self anchored cable system.
</p> <p>The behavior of the partially earth anchored cable-stayed bridge in the operational phase was investigated.
The live load analysis was carried out according to the Korean vehicle class.
Also, the response spectrum analysis for the seismic load and the buffeting analysis for the wind dynamic load were carried out.
From these results, it is shown that the partially earth anchored cable-stayed bridge increases the resistant capacity against the service loads.
</p>.

Related Results

Life-Cycle Cost Analysis of Long-Span CFRP Cable-Stayed Bridges
Life-Cycle Cost Analysis of Long-Span CFRP Cable-Stayed Bridges
With the advantages of high strength, light weight, high corrosion and fatigue resistance, and low relaxation, carbon-fiber-reinforced polymer (CFRP) is an excellent cable material...
SEISMIC VULNERABILITY ANALYSIS OF CABLE-STAYED BRIDGE DURING ROTATION CONSTRUCTION
SEISMIC VULNERABILITY ANALYSIS OF CABLE-STAYED BRIDGE DURING ROTATION CONSTRUCTION
          Due to the swivel construction, the structural redundancy of cable-stayed bridge is reduced, and its seismic vulnerability is significantly higher than that of non-swirli...
At Sea Test: Hawaii Deepwater Cable Program
At Sea Test: Hawaii Deepwater Cable Program
ABSTRACT In order to investigate and demonstrate the technical feasibility of laying a Submarine power cable in the open ocean, in depths exceeding 6000 feet, ove...
The Basic Differential Equations of Self‐Anchored Cable‐Stayed Suspension Bridge
The Basic Differential Equations of Self‐Anchored Cable‐Stayed Suspension Bridge
The static behavior of self‐anchored cable‐stayed suspension bridge under vertical load is described with the continuum method. Based on the partition generalized variation princip...
Evaluation of Cable Force Changes Effects on Cable Stayed Bridge
Evaluation of Cable Force Changes Effects on Cable Stayed Bridge
The proposed bridge, which is cable stayed bridge crosses the Hlaing River that flows through Western Yangon. It was completed in 2000 and is currently used to connect Insein Towns...
Theia can arrive late and be oxidized, but not if it is large compared to proto-Earth
Theia can arrive late and be oxidized, but not if it is large compared to proto-Earth
The Moon-forming impact was the most significant event during the accretion of Earth substantially establishing the physical and chemical states of the Earth-Moon system. In the ca...
Mechanical Analysis of Stayed Bridge
Mechanical Analysis of Stayed Bridge
Cable stayed bridge, also known as the cable-stayed bridge is of box girder with many cable directly to the towers is a kind of bridge, is by the pressure of the tower, tension of ...

Back to Top