High degree of depletion and overbalanced drilling have caused ideal conditions for fracturing and lost circulation. Thief zone introduces severe lost circulation and well control problems, often resulting into loss of the interval or the entire well. In most cases, operators choose to drill such depleted sections with SBM or OBM systems rather than WBM. Dumping mica, nut hulls and cross-linked polymer pills, certainly still work, for some applications, but have narrow operating limits. Very few lost circulation remedies have been successful, especially when using invert emulsion drilling fluids. Controlling losses in this zone has proved to be extremely difficult.
A novel alternative LCM pill has been designed to seal temporarily or indefinitely critical intervals where drilling and cementing operations are very difficult to successfully accomplish. This formulation is prepared with invert emulsion, cross-linked with magnesia, upto 90% soluble, especially designed to be used in pay zones, a low cost alternative and is appropriate for sealing non-productive intervals. The phase change of invert emulsion and addition of light burned magnesia form the viscous fluid and remains stable till activator is not added. By addition of activator, control process of static gelation starts and forms the magnesia cement. Such formulations have sp gr 1.10-1.45 and stable at high temperature (< 120deg C). The apparent viscosity of this pill is kept in the range of 45-60cp to avoid any settling of magnesia. This pill can be retarded for desired time of placement and gives its vertical setting. The compressive strength of the molds is observed 300-1000psi within a short time and also soluble in15%HCl.
The paper presents various formulations of innovative pills which can be used effectively and economically to combat circulation loss in depleted reservoir formations.
Title: An Innovative Material for Severe Lost Circulation Control in Depleted Formations
Description:
Abstract
High degree of depletion and overbalanced drilling have caused ideal conditions for fracturing and lost circulation.
Thief zone introduces severe lost circulation and well control problems, often resulting into loss of the interval or the entire well.
In most cases, operators choose to drill such depleted sections with SBM or OBM systems rather than WBM.
Dumping mica, nut hulls and cross-linked polymer pills, certainly still work, for some applications, but have narrow operating limits.
Very few lost circulation remedies have been successful, especially when using invert emulsion drilling fluids.
Controlling losses in this zone has proved to be extremely difficult.
A novel alternative LCM pill has been designed to seal temporarily or indefinitely critical intervals where drilling and cementing operations are very difficult to successfully accomplish.
This formulation is prepared with invert emulsion, cross-linked with magnesia, upto 90% soluble, especially designed to be used in pay zones, a low cost alternative and is appropriate for sealing non-productive intervals.
The phase change of invert emulsion and addition of light burned magnesia form the viscous fluid and remains stable till activator is not added.
By addition of activator, control process of static gelation starts and forms the magnesia cement.
Such formulations have sp gr 1.
10-1.
45 and stable at high temperature (< 120deg C).
The apparent viscosity of this pill is kept in the range of 45-60cp to avoid any settling of magnesia.
This pill can be retarded for desired time of placement and gives its vertical setting.
The compressive strength of the molds is observed 300-1000psi within a short time and also soluble in15%HCl.
The paper presents various formulations of innovative pills which can be used effectively and economically to combat circulation loss in depleted reservoir formations.
Related Results
Nonlinear optimal control for robotic exoskeletons with electropneumatic actuators
Nonlinear optimal control for robotic exoskeletons with electropneumatic actuators
Purpose
To provide high torques needed to move a robot’s links, electric actuators are followed by a transmission system with a high transmission rate. For instance, gear ratios of...
Experimental Study on Wellbore Strengthening with Fine Particles
Experimental Study on Wellbore Strengthening with Fine Particles
ABSTRACT
One of the most serious issues that arises during drilling operations is lost circulation. Significant study into wellbore strengthening has been conduct...
Real-time monitoring and early warning of well leakage based on big data analysis
Real-time monitoring and early warning of well leakage based on big data analysis
Abstract
In petroleum drilling engineering operations, complex lost circulation accidents not only affect the efficiency of drilling operations, but serious lost cir...
The Fourth International Milton Symposium
The Fourth International Milton Symposium
Matthew Allen. “‘Entertaining the Irksome Hours’: Paradise Lost 2.521–76 as the Fallen Counterpart of Milton's Curriculum in Of Education.”Peter Auksi. “‘Considerate Building’: The...
Collateral circulation and leptomeningeal anastomoses in acute ischemic stroke
Collateral circulation and leptomeningeal anastomoses in acute ischemic stroke
La collatéralité et les anastomoses leptoméningées dans les accidents vasculaires cérébraux
L’objet de cette thèse est centré sur l’évaluation de la circulation col...
Managing Total Circulation Losses with Crossflow While Drilling: Case History of Practical Solutions
Managing Total Circulation Losses with Crossflow While Drilling: Case History of Practical Solutions
Abstract
Lost circulation during drilling increases the drilling costs and also enhances possibility of stuck pipe. Generally, viscous mud pills with lost circulatio...
Novel Low-Solids Shear-Dependent Cement System Used to Cure Severe Lost Circulation while Drilling: A Case History
Novel Low-Solids Shear-Dependent Cement System Used to Cure Severe Lost Circulation while Drilling: A Case History
Abstract
Lost circulation in the oil industry is a recurrent and costly challenge, especially in mature fields or weak fracture-gradient zones. Incidents can result ...
A Comprehensive Case Study on Lost Circulation of Changqing Mizhi Block in Perspective of Geomechanics
A Comprehensive Case Study on Lost Circulation of Changqing Mizhi Block in Perspective of Geomechanics
ABSTRACT:
Drilling mud loss is of crucial importance in drilling. Lost circulation will extend the well construction period, cause investment losses, and even c...