Managing Total Circulation Losses with Crossflow While Drilling: Case History of Practical Solutions
View through CrossRef
Abstract
Lost circulation during drilling increases the drilling costs and also enhances possibility of stuck pipe. Generally, viscous mud pills with lost circulation materials and gels or cement plugs are placed to allow plugging of loss circulation zone. But in case of total circulation loss in conjunction with cross flow condition, even repeated LCM-mud plugs followed with cement plugs do not guarantee the durable sealing of lost zone. This paper discusses the properties, mechanism and placement technique for successful plugging off lost zone in such cases where very few lost circulation remedies were effective and more than several hundred cubic meter of drilling fluid and cement were already lost.
Details development of a novel sealant system consisting of an elastomer combined with cross-linking polymers, activator and bridging agents which provided quick, reliable control of loss has been deliberated in this paper. Initial low viscosity of this sealant allow easy placement against the lost zones and then gel activated near wellbore to set and form a stiff, rubbery gel stick with formation sediments to eliminate further losses. This development offers a proven means of controlling severe circulation losses resulting from large fractures or vugular spaces. The composition can be engineered to produce durable cross-linked polymeric rigid gel across a vide range of densities 8.6-14 ppg and temperature 45120 deg C. Addition of accelerators or retarders during mixing controls setting time and eliminates risk of premature setting inside the string while pumping.
Laboratory tests revealed effectiveness of this polymeric based sealant treatment and can improve stress around wellbore by forming a deformable, viscous and cohesive sealant inside a lost circulation fracture. Field application shows the restoration of well bore integrity in total loss with cross flow condition by the innovative approach of using this cross linked polymeric stiff rubbery gel in combination with high volume cement plug.
This paper deals with aspect of important lessons learnt from the field application of the developed cross linked polymeric stiff rubbery gel to control total circulation losses in conjunction with cross-water flow.
Title: Managing Total Circulation Losses with Crossflow While Drilling: Case History of Practical Solutions
Description:
Abstract
Lost circulation during drilling increases the drilling costs and also enhances possibility of stuck pipe.
Generally, viscous mud pills with lost circulation materials and gels or cement plugs are placed to allow plugging of loss circulation zone.
But in case of total circulation loss in conjunction with cross flow condition, even repeated LCM-mud plugs followed with cement plugs do not guarantee the durable sealing of lost zone.
This paper discusses the properties, mechanism and placement technique for successful plugging off lost zone in such cases where very few lost circulation remedies were effective and more than several hundred cubic meter of drilling fluid and cement were already lost.
Details development of a novel sealant system consisting of an elastomer combined with cross-linking polymers, activator and bridging agents which provided quick, reliable control of loss has been deliberated in this paper.
Initial low viscosity of this sealant allow easy placement against the lost zones and then gel activated near wellbore to set and form a stiff, rubbery gel stick with formation sediments to eliminate further losses.
This development offers a proven means of controlling severe circulation losses resulting from large fractures or vugular spaces.
The composition can be engineered to produce durable cross-linked polymeric rigid gel across a vide range of densities 8.
6-14 ppg and temperature 45120 deg C.
Addition of accelerators or retarders during mixing controls setting time and eliminates risk of premature setting inside the string while pumping.
Laboratory tests revealed effectiveness of this polymeric based sealant treatment and can improve stress around wellbore by forming a deformable, viscous and cohesive sealant inside a lost circulation fracture.
Field application shows the restoration of well bore integrity in total loss with cross flow condition by the innovative approach of using this cross linked polymeric stiff rubbery gel in combination with high volume cement plug.
This paper deals with aspect of important lessons learnt from the field application of the developed cross linked polymeric stiff rubbery gel to control total circulation losses in conjunction with cross-water flow.
Related Results
Buildup Analysis for Interference Tests in Stratified Formations
Buildup Analysis for Interference Tests in Stratified Formations
Summary
Interlayered crossflow modifies the responses of both the producing layer and the supporting less-permeable layer in such a manner that the conventional a...
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Drilling in deeper formations and in high pressure and high temperature (HPHT) environments is a new frontier for the oil industry. Fifty years ago, no one would have imagined dril...
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Abstarct
Introduction
Isolated brain hydatid disease (BHD) is an extremely rare form of echinococcosis. A prompt and timely diagnosis is a crucial step in disease management. This ...
Drilling Variables At Technical Limit Of Drilling Rate
Drilling Variables At Technical Limit Of Drilling Rate
Abstract
Recorded drilling times may show significant variations from well to well even for the same total depth in the same field. Apart from the formation chara...
Utility of Multiphase Production Logs in Optimising Performance of Horizontal Wells Exhibiting Crossflow
Utility of Multiphase Production Logs in Optimising Performance of Horizontal Wells Exhibiting Crossflow
Abstract
Horizontal wells are increasingly being completed with inflow control devices (ICDs) in order to equalize the flow profiles, avoid water coning, enhance ...
Film Superposition Characteristics With Laidback Fan-Shaped Holes Under the Influence of Internal Crossflow
Film Superposition Characteristics With Laidback Fan-Shaped Holes Under the Influence of Internal Crossflow
Abstract
In the serpentine passage of actual rotor blades, the coolant at the inlet of the film hole has an internal crossflow. The internal crossflow significantly ...
Planning Drilling Fluid Programs in Southeast Asia
Planning Drilling Fluid Programs in Southeast Asia
Planning the drilling fluids program is one of the most important steps in Planning the drilling fluids program is one of the most important steps in preparation for the drilling o...
First Application of Pressure Mud Cap Drilling Technique with Manage Pressure Drilling in Unconventional Gas Exploratory Onshore Field in UAE Allowed Operator to Reach Target Depth and Complete the Wells
First Application of Pressure Mud Cap Drilling Technique with Manage Pressure Drilling in Unconventional Gas Exploratory Onshore Field in UAE Allowed Operator to Reach Target Depth and Complete the Wells
Abstract
This paper undertakes the application of Pressurized Mud Cap Drilling (PMCD) technique with Manage Pressure Drilling (MPD) as a new drilling approach in the...