Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

First Application of Pressure Mud Cap Drilling Technique with Manage Pressure Drilling in Unconventional Gas Exploratory Onshore Field in UAE Allowed Operator to Reach Target Depth and Complete the Wells

View through CrossRef
Abstract This paper undertakes the application of Pressurized Mud Cap Drilling (PMCD) technique with Manage Pressure Drilling (MPD) as a new drilling approach in the Unconventional Gas Exploratory field to successfully drill through Nahr Umr & Shuaiba formations managing the risks associated with total losses due to the natural fracs and faults in the area, which if drilled conventionally instigate well control situations, large amount of drilling fluid lost into reservoir and not reaching the target depth (TD). One of the most powerful drilling techniques to apply in unconventional wells is MPD, It's used to optimize drilling operations under critical challenges, such as narrow window between pore pressure, hole instability and fracture pressure, pressure heterogeneity when drilling different formations and severe downhole losses. Study was carried out to mitigate challenges across 8-½" and 6″ holes based on previous conventional drilling experiences of simultaneous kick and loss events, MPD system was introduced to overcome that challenge. When severe losses were encountered at Nahr Umr & Shuaiba formations PMCD, an MPD technique, offered the ability to reach well TD despite the total losses using 3 different drilling fluids, Sacrificial fluid (SAC), Light Annular Mud (LAM) and Kill Mud Weight (KMW) in closed-loop drilling without mud returns while stablishing a mud cap in the annulus managing the wellhead pressure by bullheading to stop gas migration. PMCD facilitated drilling under suddenly total losses minimizing the mud consumption, reduced time/cost and avoided un-controlled release of hydrocarbons. Four wells were successfully drilled, for a total of 1,183 ft, under severe Losses where LCM treatment could not heal the natural fracked formation. PMCD converted conventional drilling into close-loop drilling system by installing Rotating Control Device (RCD) on top of the annular Blow out Preventer (BOP) establishing mud-cap in the annulus and allowing constant monitoring of the well conditions via Surface Back Pressure (SBP). A positive injectivity test was performed after total losses to confirm the formation can take drilling fluid and cuttings. Drilling started with SAC injection in the string and LAM injected intermittently in the annulus through the RCD, whenever the SBP required to be managed due to gas migration effect into the mud cap. Tripping out of hole the drilling BHA and running completions were performed in PMCD mode. This paper is the number four written (Previous: SPE-207798-MS, SPE-211775-MS & SPE-211775-MS) for the milestones achieved to develop this new area with Geo-political strategic for UAE. Apply the PMCD, helped to reduce the time of drilling & completion in the UC wells, due to the losses control, from 35 days in average to 10 days, and saving ± 50% of the budget in the target sections (8-1/2″ & 6″).
Title: First Application of Pressure Mud Cap Drilling Technique with Manage Pressure Drilling in Unconventional Gas Exploratory Onshore Field in UAE Allowed Operator to Reach Target Depth and Complete the Wells
Description:
Abstract This paper undertakes the application of Pressurized Mud Cap Drilling (PMCD) technique with Manage Pressure Drilling (MPD) as a new drilling approach in the Unconventional Gas Exploratory field to successfully drill through Nahr Umr & Shuaiba formations managing the risks associated with total losses due to the natural fracs and faults in the area, which if drilled conventionally instigate well control situations, large amount of drilling fluid lost into reservoir and not reaching the target depth (TD).
One of the most powerful drilling techniques to apply in unconventional wells is MPD, It's used to optimize drilling operations under critical challenges, such as narrow window between pore pressure, hole instability and fracture pressure, pressure heterogeneity when drilling different formations and severe downhole losses.
Study was carried out to mitigate challenges across 8-½" and 6″ holes based on previous conventional drilling experiences of simultaneous kick and loss events, MPD system was introduced to overcome that challenge.
When severe losses were encountered at Nahr Umr & Shuaiba formations PMCD, an MPD technique, offered the ability to reach well TD despite the total losses using 3 different drilling fluids, Sacrificial fluid (SAC), Light Annular Mud (LAM) and Kill Mud Weight (KMW) in closed-loop drilling without mud returns while stablishing a mud cap in the annulus managing the wellhead pressure by bullheading to stop gas migration.
PMCD facilitated drilling under suddenly total losses minimizing the mud consumption, reduced time/cost and avoided un-controlled release of hydrocarbons.
Four wells were successfully drilled, for a total of 1,183 ft, under severe Losses where LCM treatment could not heal the natural fracked formation.
PMCD converted conventional drilling into close-loop drilling system by installing Rotating Control Device (RCD) on top of the annular Blow out Preventer (BOP) establishing mud-cap in the annulus and allowing constant monitoring of the well conditions via Surface Back Pressure (SBP).
A positive injectivity test was performed after total losses to confirm the formation can take drilling fluid and cuttings.
Drilling started with SAC injection in the string and LAM injected intermittently in the annulus through the RCD, whenever the SBP required to be managed due to gas migration effect into the mud cap.
Tripping out of hole the drilling BHA and running completions were performed in PMCD mode.
This paper is the number four written (Previous: SPE-207798-MS, SPE-211775-MS & SPE-211775-MS) for the milestones achieved to develop this new area with Geo-political strategic for UAE.
Apply the PMCD, helped to reduce the time of drilling & completion in the UC wells, due to the losses control, from 35 days in average to 10 days, and saving ± 50% of the budget in the target sections (8-1/2″ & 6″).

Related Results

Studi Pengaruh Kontaminasi Properti Rheology Water Based Mud di Lapangan Sunyu
Studi Pengaruh Kontaminasi Properti Rheology Water Based Mud di Lapangan Sunyu
This project focuses on Investigation of effect of contaminants on the Rheological Properties of Water-based Drilling Mud. For any drilling operation to be termed successful, care ...
High Temperature & High Pressure (HTHP) Mud P-?-T Behavior and Its Effect on Wellbore Pressure Calculations
High Temperature & High Pressure (HTHP) Mud P-?-T Behavior and Its Effect on Wellbore Pressure Calculations
Abstract Drilling and completing wells in HTHP environments is difficult and dangerous. The paper has studied the effects of formation temperature gradient, wellb...
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Drilling in deeper formations and in high pressure and high temperature (HPHT) environments is a new frontier for the oil industry. Fifty years ago, no one would have imagined dril...
Effect of different clay additions to concrete on its ultrasonic acoustic parameters and compressive strength
Effect of different clay additions to concrete on its ultrasonic acoustic parameters and compressive strength
Abstract Concrete may have different levels of mud content due to various factors, which can lead to reduction in strength and changes in ultrasonic acoustic parameters. In...
Utilising Managed Pressure Drilling to Drill Shale Gas Horizontal Well in Fuling Shale Gas Field
Utilising Managed Pressure Drilling to Drill Shale Gas Horizontal Well in Fuling Shale Gas Field
AbstractThe SINOPEC Fuling shale gas field is the first large-scale commercial development shale gas field of China, which have been built as a productivity of 5 billion shale gas ...
Survey Of Horizontal Gas Well Activity
Survey Of Horizontal Gas Well Activity
Abstract This paper presents the results of a survey on horizontal gas well activity throughout the world. The survey was conducted for the Gas Research Institute...
Developments in Appalachian Area in 1943
Developments in Appalachian Area in 1943
ABSTRACT New York. The expected increase in wildcat drilling in New York state proved true in wells drilled but was utterly disappointing in results obtained. In ...

Back to Top