Revisiting Causative Factors of Project Cost Overrun in Building Construction Projects in Nigeria

View through CrossRef
Abstract The growing need for construction of all types coupled with a tight monetary supply has provided the construction industry with a big challenge to cut cost. The total cost of construction in normal circumstances is expected to be the sum of materials, labour, site overheads, eEquipment/plant, head office cost and profit but in many parts of the world particularly in Nigeria, there are other costs to be allowed for. To the end user, the added costs are passed on as higher rental/lease costs or prices. The aim of this study is to appraise the causative factors of cost overrun on building construction project in the Nigerian construction industry. This study was carried out using quantitative research method. This involved the collection of data relating to the research study through questionnaires prepared using literature search and carried out among professionals in the construction industry such as Architects, Builders, Engineers, Project Managers and Quantity Surveyors. Random sampling technique was employed in selecting the 156 respondents for the research study within the South Western region of Nigeria. Data retrieved were analysed using Percentile, Mean item Score and Kruskal-Wallis H-test. Findings revealed that additional cost (e.g. variations), poor financial control on site, contract management, previous experience of contractor, wrong estimation method are the major factors leading to cost overrun on building construction projects. The study concluded that construction projects experience cost overrun as a result of negligence in one way or the other by all the stakeholders involved in the construction process from inception to final completion.
Title: Revisiting Causative Factors of Project Cost Overrun in Building Construction Projects in Nigeria
Description:
Abstract The growing need for construction of all types coupled with a tight monetary supply has provided the construction industry with a big challenge to cut cost.
The total cost of construction in normal circumstances is expected to be the sum of materials, labour, site overheads, eEquipment/plant, head office cost and profit but in many parts of the world particularly in Nigeria, there are other costs to be allowed for.
To the end user, the added costs are passed on as higher rental/lease costs or prices.
The aim of this study is to appraise the causative factors of cost overrun on building construction project in the Nigerian construction industry.
This study was carried out using quantitative research method.
This involved the collection of data relating to the research study through questionnaires prepared using literature search and carried out among professionals in the construction industry such as Architects, Builders, Engineers, Project Managers and Quantity Surveyors.
Random sampling technique was employed in selecting the 156 respondents for the research study within the South Western region of Nigeria.
Data retrieved were analysed using Percentile, Mean item Score and Kruskal-Wallis H-test.
Findings revealed that additional cost (e.
g.
variations), poor financial control on site, contract management, previous experience of contractor, wrong estimation method are the major factors leading to cost overrun on building construction projects.
The study concluded that construction projects experience cost overrun as a result of negligence in one way or the other by all the stakeholders involved in the construction process from inception to final completion.

Related Results

Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry
Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry
Many construction projects exceed time and budget. The Saudi Arabian construction projects are not an exception to this phenomenon. However, the causes of time and cost overrun of ...
Significant factors affecting the Vietnam Roads Infrastructure Construction Cost Overrun - A Review
Significant factors affecting the Vietnam Roads Infrastructure Construction Cost Overrun - A Review
Cost overrun represents a significant challenge faced in construction projects, particularly in the realm of transportation infrastructure. The investigation into the causes of cos...
A study of causes of delay and cost overrun in office construction projects in the eThekwini Municipal Area, South Africa
A study of causes of delay and cost overrun in office construction projects in the eThekwini Municipal Area, South Africa
On-time completion and conformity with assigned cost of every project are the most important factors in the success of project plans. Cost overruns and time overrun (delays) have b...
Unveiling Construction Quality Factors: Insights from Asian Economy's Building Projects
Unveiling Construction Quality Factors: Insights from Asian Economy's Building Projects
Economic growth of any country depends on the construction projects and industry in the region. Therefore, the construction industry in Pakistan is directly related to quality and ...
BIM-INTEGRATED SYSTEM: A SUCCESSFUL ALTERNATIVE FOR ESTIMATING CASH FLOW IN BUILDING PROJECTS
BIM-INTEGRATED SYSTEM: A SUCCESSFUL ALTERNATIVE FOR ESTIMATING CASH FLOW IN BUILDING PROJECTS
Cash flow calculation is an essential economic aspect of evaluating the success of a construction project. Strong cash flow positively impacts not only project effectiveness but al...
Complexity-driven Risk Decision Framework for Cost Overrun using Fuzzy-Bayesian Network
Complexity-driven Risk Decision Framework for Cost Overrun using Fuzzy-Bayesian Network
Abstract This study adheres to find important complexity-risk interdependent causes of cost overrun in infrastructure transport projects rather considering an independent s...
The integration of BIM in the application of green building materials in construction projects
The integration of BIM in the application of green building materials in construction projects
In recent years, with the growing call for sustainable development, green building materials, which are of great meaning for reducing resource and environmental impacts, have attra...
Material Cost Optimization and Quality Control Improvement of Building Construction
Material Cost Optimization and Quality Control Improvement of Building Construction
A building construction project cannot be completed successfully by only planning and scheduling. Project controlling that consists of project monitoring and updating, is the other...