OPTIMALISASI LETAK TOWER CRANE TERHADAP WAKTU SIKLUS PADA PROYEK Y
View through CrossRef
In a construction project, there are various kinds of very complex activities. Therefore, heavy equipment, especially Tower Cranes is used to assist the work on the construction project. The layout of the Tower Crane must be considered because the optimal location of the Tower Crane will result in efficient cycle times and productivity values. Thus, the purpose of this study is to obtain the factors that must be considered in determining the location of the Tower Crane, and the location of the Tower Crane that is the most optimal and efficient in the project under review. In this study, 3 scenarios will be conducted according to the feasible area and the location of the Tower Crane closing to the building structure in under construction. Scenario 1, is the existing location in project Y. In scenario 2, the setting out of location of Tower Crane 1 is moved to coordinates (152.10; 43.30) and Tower Crane 2 is moved to coordinates (41.36; 29, 38). Scenario 3, the location of Tower Crane 2 is set to coordinates (36.60; 21.38). Analysis and comparison of the cycle time and productivity of Tower Crane were conducted on this paper. Result of the lowest total cycle time of 17277.32 minutes was obtained in scenario 3, 1048.53 minutes faster than the existing condition (scenario 1). In addition, the highest productivity value was obtained in scenario 3, with 5078.00 kg/hour for Tower Crane 1 and 5559.73 kg/hour for Tower Crane 2. From analysis performed for (3) three scenarios, Scenario 3 was also considered as the most optimal scenario based on several consideration factors in determining the location of the Tower Crane.
Keywords: Cycle Time, Optimization, Productivity, Scenario, Tower Crane.
Title: OPTIMALISASI LETAK TOWER CRANE TERHADAP WAKTU SIKLUS PADA PROYEK Y
Description:
In a construction project, there are various kinds of very complex activities.
Therefore, heavy equipment, especially Tower Cranes is used to assist the work on the construction project.
The layout of the Tower Crane must be considered because the optimal location of the Tower Crane will result in efficient cycle times and productivity values.
Thus, the purpose of this study is to obtain the factors that must be considered in determining the location of the Tower Crane, and the location of the Tower Crane that is the most optimal and efficient in the project under review.
In this study, 3 scenarios will be conducted according to the feasible area and the location of the Tower Crane closing to the building structure in under construction.
Scenario 1, is the existing location in project Y.
In scenario 2, the setting out of location of Tower Crane 1 is moved to coordinates (152.
10; 43.
30) and Tower Crane 2 is moved to coordinates (41.
36; 29, 38).
Scenario 3, the location of Tower Crane 2 is set to coordinates (36.
60; 21.
38).
Analysis and comparison of the cycle time and productivity of Tower Crane were conducted on this paper.
Result of the lowest total cycle time of 17277.
32 minutes was obtained in scenario 3, 1048.
53 minutes faster than the existing condition (scenario 1).
In addition, the highest productivity value was obtained in scenario 3, with 5078.
00 kg/hour for Tower Crane 1 and 5559.
73 kg/hour for Tower Crane 2.
From analysis performed for (3) three scenarios, Scenario 3 was also considered as the most optimal scenario based on several consideration factors in determining the location of the Tower Crane.
Keywords: Cycle Time, Optimization, Productivity, Scenario, Tower Crane.
Related Results
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
Analisis waktu standar produksi merupakan salah satu analisis metoda kuantitatif yang dilakukan untuk mengukur waktu produksi dan bertujuan agar dapat memiliki waktu standar sebaga...
Optimasi Penempatan Tower Crane terhadap Waktu Siklus pada Proyek X
Optimasi Penempatan Tower Crane terhadap Waktu Siklus pada Proyek X
ABSTRAKKegiatan konstruksi adalah suatu rangkaian kegiatan yang saling berkaitan dan mempunyai tujuan tertentu. Tujuan dari proyek konstruksi adalah mampu merealisasikan kegiatan p...
PENENTUAN LOKASI TOWER CRANE PADA PROYEK KONSTRUKSI BERBASIS SIMULASI
PENENTUAN LOKASI TOWER CRANE PADA PROYEK KONSTRUKSI BERBASIS SIMULASI
Development of high-level building construction projects that require complex equipment that can be used in high-level construction, equipment used to help complete construction pr...
MENINGKATKAN HASIL BELAJAR FISIKA MENGGUNAKAN MODEL Lc 7e SISWA MTsN 1 ACEH BARAT
MENINGKATKAN HASIL BELAJAR FISIKA MENGGUNAKAN MODEL Lc 7e SISWA MTsN 1 ACEH BARAT
Tujuan Penelitian ini adalah untuk untuk mengetahui peningkatan hasil belajar siswa kelas VIII A MTsN 1 Aceh Barat setelah menggunakan model pembelajaran Lc 7e. Pada siklus I dan s...
Analisis Estimasi Penyelesaian Proyek Konstruksi terhadap Waktu dan Biaya
Analisis Estimasi Penyelesaian Proyek Konstruksi terhadap Waktu dan Biaya
Proyek konstruksi merupakan kegiatan yang memiliki tingkat kompleksitas tinggi, sehingga sering terjadi keterlambatan penyelesaian proyek maupun pembengkakan biaya akibat sistem ma...
Operational Dynamics Of An Offshore Crane
Operational Dynamics Of An Offshore Crane
Abstract
A computational method is described for calculating the detailed dynamics of fixed offshore platform cranes based on finite element techniques. The metho...
ANALISIS PERBANDINGAN WAKTU PELAKSANAAN PEKERJAAN PENGECORAN MENGGUNAKAN TOWER CRANE DENGAN CONCRETE PUMP
ANALISIS PERBANDINGAN WAKTU PELAKSANAAN PEKERJAAN PENGECORAN MENGGUNAKAN TOWER CRANE DENGAN CONCRETE PUMP
Pemilihan alat yang tepat untuk melakukan pekerjaan konstruksi sangat dibutuhkan, agar pelaksanaan pekerjaan menjadi efektif dan efesien. Menggunakan alat yang tepat akan mempengar...
ANALISA PENJADWALAN PROYEK PEMBANGUNAN APARTEMEN MENGGUNAKAN METODE CPM (CRITICAL PATH METHOD)
ANALISA PENJADWALAN PROYEK PEMBANGUNAN APARTEMEN MENGGUNAKAN METODE CPM (CRITICAL PATH METHOD)
Peningkatan peduduk di Kota Tangerang berbanding terbalik dengan ketersedian lahan pada kota ini, oleh karena itu proyek permbangunan tempat tinggal dibuat menjadi kearah vertikal ...