Addition of the Guluk-Guluk Substation, it will affect the flow of power and voltage in the electric power system. Based on the analysis of normal conditions before and after the Guluk-Guluk Substation in terms of the voltage value on each connected bus, it is still within the permitted limits, while the contingency ranking calculation using the Voltage Performance Index (PIv) method can determine contingency conditions N-1 to N -3 before and after the Guluk-Guluk Substation. In this case, it was found that during the contingency conditions N-1 to N-3 before the Guluk-Guluk Substation there was a decrease in the value of the voltage which was still within the permissible limits, but in the N-3 contingency there was also an overload on the line due to the release of two generator units and one channel. After the existence of the Guluk-Guluk Substation, during the N-1 to N-2 contingency conditions the voltage value was still within the permissible limits, but the voltage drop that occurred was bigger than the condition before the Guluk-Guluk Substation. For the N-3 contingency condition the voltage value does not meet the standard due to overload on the Ujung Substation - Bangkalan Substation line and the lack of power flow.
Politeknik Negeri Malang
Title: Analisis Pengaruh Penambahan Gardu Induk Terhadap Aliran Daya dan Profil Tegangan
Description:
Addition of the Guluk-Guluk Substation, it will affect the flow of power and voltage in the electric power system.
Based on the analysis of normal conditions before and after the Guluk-Guluk Substation in terms of the voltage value on each connected bus, it is still within the permitted limits, while the contingency ranking calculation using the Voltage Performance Index (PIv) method can determine contingency conditions N-1 to N -3 before and after the Guluk-Guluk Substation.
In this case, it was found that during the contingency conditions N-1 to N-3 before the Guluk-Guluk Substation there was a decrease in the value of the voltage which was still within the permissible limits, but in the N-3 contingency there was also an overload on the line due to the release of two generator units and one channel.
After the existence of the Guluk-Guluk Substation, during the N-1 to N-2 contingency conditions the voltage value was still within the permissible limits, but the voltage drop that occurred was bigger than the condition before the Guluk-Guluk Substation.
For the N-3 contingency condition the voltage value does not meet the standard due to overload on the Ujung Substation - Bangkalan Substation line and the lack of power flow.
Related Results
Analisa Pengaruh Tegangan Harmonik Terhadap Regulasi Tegangan Eksitasi Generator Satu Fasa
Analisa Pengaruh Tegangan Harmonik Terhadap Regulasi Tegangan Eksitasi Generator Satu Fasa
Esensinya setiap generator listrik satu fasa maupun tiga fasa telah dilengkapi dengan sistem eksitasi. Sistem eksitasi generator ada tiga, yaitu sistem eksitasi statis, dinamis, da...
PERAN TATA KELOLA PERUSAHAAN DALAM MEMODERASI PENGARUH IMPLEMANTASI GREEN ACCOUNTING, CORPORATE SOCIAL RESPONSIBILITY DAN FIRM SIZE TERHADAP KINERJA KEUANGAN
PERAN TATA KELOLA PERUSAHAAN DALAM MEMODERASI PENGARUH IMPLEMANTASI GREEN ACCOUNTING, CORPORATE SOCIAL RESPONSIBILITY DAN FIRM SIZE TERHADAP KINERJA KEUANGAN
This study examines the role of corporate governance in moderating the influence of green accounting disclosure, corporate social responsibility (CSR), and firm size on the financi...
DAMPAK TEKNOLOGI TERHADAP PROSES BELAJAR MENGAJAR
DAMPAK TEKNOLOGI TERHADAP PROSES BELAJAR MENGAJAR
DAFTAR PUSTAKAAditama, M. H. R., & Selfiardy, S. (2022). Kehidupan Mahasiswa Kuliah Sambil Bekerja di Masa Pandemi Covid-19. Kidspedia: Jurnal Pendidikan Anak Usia Dini, 3(...
Pengembangan Relai Adaptif Proteksi Busbar Menggunakan Relai Berbasis Protokol IEC61850
Pengembangan Relai Adaptif Proteksi Busbar Menggunakan Relai Berbasis Protokol IEC61850
Kebutuhan manusia akan energi listrik bisa dikatakan mendekati kebutuhan primer. Sejalan dengan hal tersebut, PLN sebagai operator listrik di Indonesia, harus menjamin keandalan pa...
Simulasi Aliran Fluida Crude Palm Oil (CPO) dan Air Pada Pipa Horizontal Menggunakan Metode Volume Hingga
Simulasi Aliran Fluida Crude Palm Oil (CPO) dan Air Pada Pipa Horizontal Menggunakan Metode Volume Hingga
Telah dilakukan simulasi aliran dua fasa cair- cair crude palm oil (CPO) dan air yang mengalir satu arah dalam pipa horizontal untuk mendapatkan pola aliran campuran dan karakteris...
Analisis Penanganan Gangguan Kedip Tegangan Pada Penyulang Sampoerna 1 Tegangan 20 kV
Analisis Penanganan Gangguan Kedip Tegangan Pada Penyulang Sampoerna 1 Tegangan 20 kV
Berdasarkan kejadian pada tanggal 17 Desember 2017, terjadi gangguan kedip tegangan yang berhasil direkam dengan PQA (Power Quality Analyzer) milik PT. HM Sampoerna dengan nilai pe...
Kaji efisiensi temperatur penukar panas dengan variasi aliran untuk aplikasi pengering
Kaji efisiensi temperatur penukar panas dengan variasi aliran untuk aplikasi pengering
Abstrak Heat exchanger atau alat penukar panas adalah alat-alat yang digunakan untuk mengubah temperatur fluida atau mengubah fasa fluida dengan cara mempertukarkan panasnya dengan...
SISTEM PROTEKSI TEGANGAN UNTUK SMART MICRO INVERTER PADA PLTS ON GRID SKALA KECIL
SISTEM PROTEKSI TEGANGAN UNTUK SMART MICRO INVERTER PADA PLTS ON GRID SKALA KECIL
Inverter pada pembangkit listrik tenaga surya (PLTS) on grid kapasitas kecil adalah smart micro inverter (SMI). SMI mensinkronkan daya yang dihasilkan oleh PLTS ke grid apabila sya...