Javascript must be enabled to continue!
The establishment of analysis methodology of NRCDose3 for Kuosheng nuclear power plant decommissioning
View through CrossRef
Abstract
In this research, the analysis methodology for Kuosheng BWR/6 nuclear power plant (NPP) decommissioning is established by using NRCDose3 code. NRCDose3 code includes XOQDOQ, GASPAR II, and LADTAP II programs that can assess atmospheric dispersion factor, gaseous radioactive effluents and offsite doses, and liquid radioactive releases and offsite doses, respectively. Therefore, this analysis methodology of NRCDose3 assesses the offsite doses of the gaseous radioactive effluents and liquid radioactive releases for Kuosheng NPP decommissioning. According to the analysis results, the results of NRCDose3 are consistent with Kuosheng NPP data.
Walter de Gruyter GmbH
Title: The establishment of analysis methodology of NRCDose3 for Kuosheng nuclear power plant decommissioning
Description:
Abstract
In this research, the analysis methodology for Kuosheng BWR/6 nuclear power plant (NPP) decommissioning is established by using NRCDose3 code.
NRCDose3 code includes XOQDOQ, GASPAR II, and LADTAP II programs that can assess atmospheric dispersion factor, gaseous radioactive effluents and offsite doses, and liquid radioactive releases and offsite doses, respectively.
Therefore, this analysis methodology of NRCDose3 assesses the offsite doses of the gaseous radioactive effluents and liquid radioactive releases for Kuosheng NPP decommissioning.
According to the analysis results, the results of NRCDose3 are consistent with Kuosheng NPP data.
Related Results
Current Situation and Development Trend of Decommissioning of Nuclear Power Plants
Current Situation and Development Trend of Decommissioning of Nuclear Power Plants
Abstract
The complete life of a nuclear power plant consists of three stages: construction, operation and decommissioning. In the last stage of the operation life of...
Modeling and Application of TRACE in the Kuosheng BWR/6 NPP Dry-Storage System
Modeling and Application of TRACE in the Kuosheng BWR/6 NPP Dry-Storage System
The dry-storage systems of nuclear power plants (NPPs) in Taiwan have become one of the major safety concerns. There are two steps considered in this study. The first step is the v...
Converted Barge for Wellhead Platform Decommissioning
Converted Barge for Wellhead Platform Decommissioning
Abstract
This paper presents an alternative method for decommissioning offshore wellhead platform using converted flat top barge as decommissioning barge. The barge ...
The core shroud leakage analysis and study for Kuosheng nuclear power plant
The core shroud leakage analysis and study for Kuosheng nuclear power plant
Abstract
Kuosheng Nuclear Power Plant (NPP) is a BWR/6 plant in Taiwan. First, this study focuses on the establishment of the TRACE/SNAP model for Kuosheng. To check...
Environmental Implications Of Decommissioning A Major Sour Gas Plant In Alberta
Environmental Implications Of Decommissioning A Major Sour Gas Plant In Alberta
Abstract
Concern regarding the environmental implications of decommissioning major industrial facilities has been growing in recent years. Long term plant operati...
Collaborations Involving Malaysia Upstream Regulator to Enhance Decommissioning
Collaborations Involving Malaysia Upstream Regulator to Enhance Decommissioning
Abstract
This paper aims to share the collaboration efforts of Malaysia's governing body for Upstream oil & gas industry with various stakeholders to enhance dec...
A New Multi-Criteria Decision-Making Tool for Subsea Oil and Gas Asset Decommissioning
A New Multi-Criteria Decision-Making Tool for Subsea Oil and Gas Asset Decommissioning
Abstract
The decommissioning of offshore oil and gas (O&G) facilities poses significant challenges due to high costs, operational risks, social impacts, and envi...
Using TRACE to establish the analysis model of Kuosheng nuclear power plant for decommissioning transition phase
Using TRACE to establish the analysis model of Kuosheng nuclear power plant for decommissioning transition phase
Abstract
The Unit 1 of Kuosheng nuclear power plant is in the decommissioning transition phase and still has spent fuel in the core of reactor now. The time to reach...

