Environmental Implications Of Decommissioning A Major Sour Gas Plant In Alberta
View through CrossRef
Abstract
Concern regarding the environmental implications of decommissioning major industrial facilities has been growing in recent years. Long term plant operations can lead to substantial on-site and off-site contamination problems and decommissioned sites must be left in an environmentally secure condition. Limited practical experience is currently available to assist in planning and completing environmentally acceptable clean-up and reclamation programs in association with a plant decommissioning exercise.
Gulf Canada Resources Inc. retained Monenco Consultants Limited to assist in the clean-up and reclamation of their major sour gas plant in Pincher Creek, Alberta, as part of the decommissioning activities. Monenco completed the following major activities:reconnaissance field program to determine the extent, type and level of plant site contamination;hydrogeological program to define the geology and hydrogeology of the area to determine on-site contaminant problems and probable pathways of contamination off-site; andsampling program in the plant process area to determine existing conditions (location, type and level of contamination).
This paper summarizes the results of the above mentioned completed field programs. In addition, recommendations are made regarding the activities necessary to ensure that gas plant sites are decommissioned in an environmentally acceptable manner.
Introduction
Decommissioning major oil, gas or chemical plants involves more than simply shutting down the process facilities and dismantling and removing equipment, buildings and storage facilities. In addition to the normal generation and accumulation of liquid and solid wastes such as sludge's and sediments, years of plant operation generally are accompanied by spills and leaks of process chemicals and products. As a result, normal plant operations may have inadvertently contaminated the environment in the area of the plant.
The General Decommissioning Scheme
Any decommissioning program for oil, gas, or chemical plants must include consideration of the possibility that contaminated soils, sludge's, sediments, surface waters and groundwater may exist on the plant site and may have influenced the environment outside the plant boundary.
In order to formulate a clean-up and reclamation plan for the plant site that is acceptable to the government regulatory agencies and the public, the decommissioning program must be based on a clear understanding of the nature and extent of possible plant site contamination as well as the geological and hydrogeological setting of the facilities location.
The activities associated with the clean-up and reclamation part of the decommissioning programs should be based on a progressive, step-wise approach to the problem, such as described in Figure 1. The first step in the process includes a plant site assessment (or operational history) based on:plant waste management practices(past and present);site inspections;employee interviews;operations history;regulatory agency concerns;literature data;original plant setting;plant site data;process information; andgovernment information.
This initial assessment of the plant site, in turn, leads to the design of a reconnaissance level survey of the site. The objective of this survey is to identify the broad nature and extent of plant site contamination.
Title: Environmental Implications Of Decommissioning A Major Sour Gas Plant In Alberta
Description:
Abstract
Concern regarding the environmental implications of decommissioning major industrial facilities has been growing in recent years.
Long term plant operations can lead to substantial on-site and off-site contamination problems and decommissioned sites must be left in an environmentally secure condition.
Limited practical experience is currently available to assist in planning and completing environmentally acceptable clean-up and reclamation programs in association with a plant decommissioning exercise.
Gulf Canada Resources Inc.
retained Monenco Consultants Limited to assist in the clean-up and reclamation of their major sour gas plant in Pincher Creek, Alberta, as part of the decommissioning activities.
Monenco completed the following major activities:reconnaissance field program to determine the extent, type and level of plant site contamination;hydrogeological program to define the geology and hydrogeology of the area to determine on-site contaminant problems and probable pathways of contamination off-site; andsampling program in the plant process area to determine existing conditions (location, type and level of contamination).
This paper summarizes the results of the above mentioned completed field programs.
In addition, recommendations are made regarding the activities necessary to ensure that gas plant sites are decommissioned in an environmentally acceptable manner.
Introduction
Decommissioning major oil, gas or chemical plants involves more than simply shutting down the process facilities and dismantling and removing equipment, buildings and storage facilities.
In addition to the normal generation and accumulation of liquid and solid wastes such as sludge's and sediments, years of plant operation generally are accompanied by spills and leaks of process chemicals and products.
As a result, normal plant operations may have inadvertently contaminated the environment in the area of the plant.
The General Decommissioning Scheme
Any decommissioning program for oil, gas, or chemical plants must include consideration of the possibility that contaminated soils, sludge's, sediments, surface waters and groundwater may exist on the plant site and may have influenced the environment outside the plant boundary.
In order to formulate a clean-up and reclamation plan for the plant site that is acceptable to the government regulatory agencies and the public, the decommissioning program must be based on a clear understanding of the nature and extent of possible plant site contamination as well as the geological and hydrogeological setting of the facilities location.
The activities associated with the clean-up and reclamation part of the decommissioning programs should be based on a progressive, step-wise approach to the problem, such as described in Figure 1.
The first step in the process includes a plant site assessment (or operational history) based on:plant waste management practices(past and present);site inspections;employee interviews;operations history;regulatory agency concerns;literature data;original plant setting;plant site data;process information; andgovernment information.
This initial assessment of the plant site, in turn, leads to the design of a reconnaissance level survey of the site.
The objective of this survey is to identify the broad nature and extent of plant site contamination.
Related Results
Processing Sour Natural Gas To Meet Pipeline Quality
Processing Sour Natural Gas To Meet Pipeline Quality
Abstract
The processing of sour natural gas is gaining interest and popularity due to the search for additional sources of available energy. The decision to build...
Converted Barge for Wellhead Platform Decommissioning
Converted Barge for Wellhead Platform Decommissioning
Abstract
This paper presents an alternative method for decommissioning offshore wellhead platform using converted flat top barge as decommissioning barge. The barge ...
Current Situation and Development Trend of Decommissioning of Nuclear Power Plants
Current Situation and Development Trend of Decommissioning of Nuclear Power Plants
Abstract
The complete life of a nuclear power plant consists of three stages: construction, operation and decommissioning. In the last stage of the operation life of...
Collaborations Involving Malaysia Upstream Regulator to Enhance Decommissioning
Collaborations Involving Malaysia Upstream Regulator to Enhance Decommissioning
Abstract
This paper aims to share the collaboration efforts of Malaysia's governing body for Upstream oil & gas industry with various stakeholders to enhance dec...
A New Multi-Criteria Decision-Making Tool for Subsea Oil and Gas Asset Decommissioning
A New Multi-Criteria Decision-Making Tool for Subsea Oil and Gas Asset Decommissioning
Abstract
The decommissioning of offshore oil and gas (O&G) facilities poses significant challenges due to high costs, operational risks, social impacts, and envi...
Impossible to Possible - Decommissioning the UAE's Oldest Oil Refinery with Zero Flaring
Impossible to Possible - Decommissioning the UAE's Oldest Oil Refinery with Zero Flaring
Abstract
Decommissioning of Oil Refinery is not a regular affair, hence information on best practices being followed during facility decommissioning is not available...
Low BTU Gas Monetisation Technology Commercial Evaluation
Low BTU Gas Monetisation Technology Commercial Evaluation
Abstract
Natural gas is normally composed of three types of group components; i.e., hydrocarbons, inert and sour components.
The natural gas hyd...
Decommissioning of Umbilicals and Flexible Pipes - A Sensitivity Analysis in Decision-Making Process
Decommissioning of Umbilicals and Flexible Pipes - A Sensitivity Analysis in Decision-Making Process
Abstract
The decommissioning of subsea equipment is a reality in Brazil and worldwide, highlighting the need for the development of decision-making methodologies for...