Javascript must be enabled to continue!
"Cement Packer": An Innovative Technique to Recover Reserves Above Packer Without Re-completion
View through CrossRef
Abstract
Reserves with marginal production potential are often by-passed during the early stages of reservoir development. Re-evaluations of well logging data has resulted in the discovery of potential reserves located above the production packer that were not previously considered in the initial completion strategy.
Conventional completion techniques required a workover to re-complete to these potential zones. However, due to marginal reserves or the presence of production from existing zones below the proposed re-completion (ex: a dual completion where the long string is still producing while short string is shut-in), a workover is not a good economic option to recover these zones. A novel technique of cement packer has been successfully developed in Offshore West Java (OWJ) field to re-complete these zones without pulling out the existing completion. Pressure isolation of potential zones is accomplished by placing cement in the tubing-casing annulus above the production packer. This cement then acts as a new production packer further up the wellbore. Conventional or oriented perforating is then used to complete the well in the new productive intervals.
The advantages of this technique are it is inexpensive (rigless), there is no need to wait for other tubing strings in the well to deplete to their economic limit before re-completing up-hole and –most importantly-access to and production from lower completion is not affected.
To date, a total of 9 wells have been reactivated using this technique to recover productive zones located above the production packer. The average cost was only 20-60% of conventional workovers and savings of up to US$ 800,000 have been achieved. These successful results have brought new opportunities for reactivating many more shut-in wells with by-passed reserves that are economically marginal.
Title: "Cement Packer": An Innovative Technique to Recover Reserves Above Packer Without Re-completion
Description:
Abstract
Reserves with marginal production potential are often by-passed during the early stages of reservoir development.
Re-evaluations of well logging data has resulted in the discovery of potential reserves located above the production packer that were not previously considered in the initial completion strategy.
Conventional completion techniques required a workover to re-complete to these potential zones.
However, due to marginal reserves or the presence of production from existing zones below the proposed re-completion (ex: a dual completion where the long string is still producing while short string is shut-in), a workover is not a good economic option to recover these zones.
A novel technique of cement packer has been successfully developed in Offshore West Java (OWJ) field to re-complete these zones without pulling out the existing completion.
Pressure isolation of potential zones is accomplished by placing cement in the tubing-casing annulus above the production packer.
This cement then acts as a new production packer further up the wellbore.
Conventional or oriented perforating is then used to complete the well in the new productive intervals.
The advantages of this technique are it is inexpensive (rigless), there is no need to wait for other tubing strings in the well to deplete to their economic limit before re-completing up-hole and –most importantly-access to and production from lower completion is not affected.
To date, a total of 9 wells have been reactivated using this technique to recover productive zones located above the production packer.
The average cost was only 20-60% of conventional workovers and savings of up to US$ 800,000 have been achieved.
These successful results have brought new opportunities for reactivating many more shut-in wells with by-passed reserves that are economically marginal.
Related Results
Cement Packer Re-Perforation – Well-AA Case Study
Cement Packer Re-Perforation – Well-AA Case Study
Abstract
Cement packer well work is a rig-less intervention method for accessing reserves above and between production packers. It is used to isolate a target comple...
Cement Packer Installation in Highly Deviated Well Using the Balanced Hydrostatic Plug Concept through Coiled Tubing: Offshore Niger Delta
Cement Packer Installation in Highly Deviated Well Using the Balanced Hydrostatic Plug Concept through Coiled Tubing: Offshore Niger Delta
Abstract
The "balanced cement plug" concept has long been a standard industry practice for setting plugs in a wellbore. This requires setting a hydrostatic plug cons...
Cement Isolation Packer - An Economic Method of Accessing Bypassed Marginal Reserves in Offshore Brown Field
Cement Isolation Packer - An Economic Method of Accessing Bypassed Marginal Reserves in Offshore Brown Field
Abstract
Ravva is a mature field located offshore east coast of India with over 20 years of production history from Middle Miocene sandstone reservoirs. During the d...
A Novel Underbalanced-Perforating Gun Deployment System Using Production Packer Technology Successfully Completes Offshore Horizontal Wells in a Single Trip
A Novel Underbalanced-Perforating Gun Deployment System Using Production Packer Technology Successfully Completes Offshore Horizontal Wells in a Single Trip
Abstract
An innovative completion method was recently used to complete two oil fields in the central and northern areas of the North Sea. The Skua field was a sin...
One-Trip Perforate and Gravel Pack System
One-Trip Perforate and Gravel Pack System
Abstract
A downhole tool system has been developed that makes it possible to perforate well casing with all the advantages of a TCP (Tubing Conveyed Perforating) gun...
Advances in Cement Packer Slurry Design Using Liquid Cement Latex: Offshore Nigeria Delta Case Study
Advances in Cement Packer Slurry Design Using Liquid Cement Latex: Offshore Nigeria Delta Case Study
Abstract
The deployment of a coiled tubing (CT) conveyed cement packers for accessing bypassed hydrocarbon/ marginal reserves through rigless through-tubing well int...
Successful High-Angle Through-Tubing Cement Packer Deployment and Reperforation Using Coiled Tubing: Offshore Niger Delta
Successful High-Angle Through-Tubing Cement Packer Deployment and Reperforation Using Coiled Tubing: Offshore Niger Delta
Abstract
Most economically feasible production optimization plans for brown fields include deploying rigless technologies for accessing reserves originally considere...
Probabilistic Reserves Estimation of Mara West Field, Maracaibo Basin, Venezuela: Case Study
Probabilistic Reserves Estimation of Mara West Field, Maracaibo Basin, Venezuela: Case Study
Abstract
Mara west field located onshore Lake Maracaibo in Western Venezuela, was discovered in 1951 by well DM-115. Other wells drilled afterwards showed rather ...

