Cement Isolation Packer - An Economic Method of Accessing Bypassed Marginal Reserves in Offshore Brown Field

View through CrossRef
Abstract Ravva is a mature field located offshore east coast of India with over 20 years of production history from Middle Miocene sandstone reservoirs. During the development phase of the field, Late Miocene (LM) sands were intersected in few wells at shallow depths. Due to the presence of more promising and critical zones below, these sands were not completed and fell above the production packer and behind the production casing. The marginal reserves in these sands did not justify workover operation to complete it. Rigless options were studied and a shut-in well was selected for implementation. In order to safely complete and access the bypassed shallow sands, a vessel based pumping operation was planned to place a cement packer in the tubing – casing annulus. The slurry was circulated into the production casing/tubing annulus through a circulation SSD installed above the production packer.The cement packer was thus placed across the zone of interest. Designing of the cement slurry was based on reservoir parameters and the setting time was optimized to prevent reversing of the slurry back into the tubing. The cement mix had a bonding agent to exhibit good metal-cement bonding providing prolonged endurance of the cement with the capability of holding the expected pressure differential. The cement packer emulated a production packer providing zonal isolation for the new completion. Size of the platform precluded spotting of the complete Coil Tubing spread on the platform. High cost prohibited catenary coil tubing operations. As an alternative, the pump spread was placed on a DP vessel and the coil tubing unit was spotted on the platform. A high pressure hose running up from the vessel to a standpipe on the main deck of the platform formed the main conduit for fluids being pumped from the vessel into the CT or wells. Onsite mixing of the cement slurry on the vessel required detailed planning and execution. The well was activated & tested at rates of 1500 bopd with no integrity concerns till date. This paper will emphasize on the operational procedure and challenges of successfully completing the zone and bringing the shut-in well online. The execution of this operation was done at 1/10th of the cost of a rig based workover. This has also opened up new opportunities to access similar bypassed reserves resulting in incremental production from reservoirs which would have otherwise been left untapped.
Title: Cement Isolation Packer - An Economic Method of Accessing Bypassed Marginal Reserves in Offshore Brown Field
Description:
Abstract Ravva is a mature field located offshore east coast of India with over 20 years of production history from Middle Miocene sandstone reservoirs.
During the development phase of the field, Late Miocene (LM) sands were intersected in few wells at shallow depths.
Due to the presence of more promising and critical zones below, these sands were not completed and fell above the production packer and behind the production casing.
The marginal reserves in these sands did not justify workover operation to complete it.
Rigless options were studied and a shut-in well was selected for implementation.
In order to safely complete and access the bypassed shallow sands, a vessel based pumping operation was planned to place a cement packer in the tubing – casing annulus.
The slurry was circulated into the production casing/tubing annulus through a circulation SSD installed above the production packer.
The cement packer was thus placed across the zone of interest.
Designing of the cement slurry was based on reservoir parameters and the setting time was optimized to prevent reversing of the slurry back into the tubing.
The cement mix had a bonding agent to exhibit good metal-cement bonding providing prolonged endurance of the cement with the capability of holding the expected pressure differential.
The cement packer emulated a production packer providing zonal isolation for the new completion.
Size of the platform precluded spotting of the complete Coil Tubing spread on the platform.
High cost prohibited catenary coil tubing operations.
As an alternative, the pump spread was placed on a DP vessel and the coil tubing unit was spotted on the platform.
A high pressure hose running up from the vessel to a standpipe on the main deck of the platform formed the main conduit for fluids being pumped from the vessel into the CT or wells.
Onsite mixing of the cement slurry on the vessel required detailed planning and execution.
The well was activated & tested at rates of 1500 bopd with no integrity concerns till date.
This paper will emphasize on the operational procedure and challenges of successfully completing the zone and bringing the shut-in well online.
The execution of this operation was done at 1/10th of the cost of a rig based workover.
This has also opened up new opportunities to access similar bypassed reserves resulting in incremental production from reservoirs which would have otherwise been left untapped.

Related Results

Successful High-Angle Through-Tubing Cement Packer Deployment and Reperforation Using Coiled Tubing: Offshore Niger Delta
Successful High-Angle Through-Tubing Cement Packer Deployment and Reperforation Using Coiled Tubing: Offshore Niger Delta
Abstract Most economically feasible production optimization plans for brown fields include deploying rigless technologies for accessing reserves originally considere...
The cement-bone bond is weaker than cement-cement bond in cement-in-cement revision arthroplasty. A comparative biomechanical study
The cement-bone bond is weaker than cement-cement bond in cement-in-cement revision arthroplasty. A comparative biomechanical study
This study compares the strength of the native bone-cement bond and the old-new cement bond under cyclic loading, using third generation cementing technique, rasping and contaminat...
Cement Packer Re-Perforation – Well-AA Case Study
Cement Packer Re-Perforation – Well-AA Case Study
Abstract Cement packer well work is a rig-less intervention method for accessing reserves above and between production packers. It is used to isolate a target comple...
Advances in Cement Packer Slurry Design Using Liquid Cement Latex: Offshore Nigeria Delta Case Study
Advances in Cement Packer Slurry Design Using Liquid Cement Latex: Offshore Nigeria Delta Case Study
Abstract The deployment of a coiled tubing (CT) conveyed cement packers for accessing bypassed hydrocarbon/ marginal reserves through rigless through-tubing well int...
First Implementation of Self-Healing Cement Systems in H2S/CO2 Aggressive Environment Across Pay-Zone
First Implementation of Self-Healing Cement Systems in H2S/CO2 Aggressive Environment Across Pay-Zone
Abstract Carbonate reservoirs are often characterized by high pressure and high content of H2S and CO2. For these reasons, drilling the reservoir is the most challen...
"Cement Packer": An Innovative Technique to Recover Reserves Above Packer Without Re-completion
"Cement Packer": An Innovative Technique to Recover Reserves Above Packer Without Re-completion
Abstract Reserves with marginal production potential are often by-passed during the early stages of reservoir development. Re-evaluations of well logging data has re...
Foamed Cement Solution for Deepwater Tophole Challenges Offshore West Africa
Foamed Cement Solution for Deepwater Tophole Challenges Offshore West Africa
Abstract One of the biggest challenges with cementing surface casings offshore in a deepwater environment is the requirement to place a cement column in unconsolidat...

Back to Top