Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Cement Packer Re-Perforation – Well-AA Case Study

View through CrossRef
Abstract Cement packer well work is a rig-less intervention method for accessing reserves above and between production packers. It is used to isolate a target completion interval from other hydrocarbon or non-hydrocarbon zones. Cement packer is used as an alternative to the conventional production packer. The key benefit of cement packer application is the cost savings (in the order of $MM) realized instead of using a major rig workover to achieve the same objective of isolation of a target interval. A key challenge however is the attendant increased skin caused by reduced perforation efficiency through the extra layer of cement plug. This paper addresses this issue by showing the work-around adopted by one of the Assets in Chevron Nigeria JV to improve well productivity. Well-AA was evaluated and proposed for a zone switch non-rig workover intervention of the production interval from N-AA/Well-AA to K-AA/Well-5X reservoir in November 2012 using cement packer to isolate existing completion and recomplete in the new target reservoir. The zone switch and perforation were executed successfully via a cement packer operation but didn't flow after perforation. Several attempts to bring the well on production such as swabbing were made with no success. The outcome of the attempts indicated there was poor or lack of connectivity between the wellbore and the sand-face. A well performance lookback was done to identify the well problem and it was recommended to re-perforate the proposed interval of the well and initiate gas lift. The recommendation for re-perforation was based on productivity index analysis of previous cement packer completions and the perforation gun performance with respect to the required penetration through the cement plug, tubing/casing and the formation. Estimated productivity index (PI) from two previous cement packer operations were the basis of the recommendation. Well-BD (was perforated twice) with calculated PI of 2 Bbls/Day/Psi and Well-CX (which was perforated once) with calculated PI of 0.3 Bbls/Day/Psi. This paper will discuss the lessons learnt and best practice from re-perforation of Well-AA with a bigger and deeper penetrating perforation gun that restored initial production from 0 BOPD to 550 BOPD at natural flow condition via a SEWOP barge operation.
Title: Cement Packer Re-Perforation – Well-AA Case Study
Description:
Abstract Cement packer well work is a rig-less intervention method for accessing reserves above and between production packers.
It is used to isolate a target completion interval from other hydrocarbon or non-hydrocarbon zones.
Cement packer is used as an alternative to the conventional production packer.
The key benefit of cement packer application is the cost savings (in the order of $MM) realized instead of using a major rig workover to achieve the same objective of isolation of a target interval.
A key challenge however is the attendant increased skin caused by reduced perforation efficiency through the extra layer of cement plug.
This paper addresses this issue by showing the work-around adopted by one of the Assets in Chevron Nigeria JV to improve well productivity.
Well-AA was evaluated and proposed for a zone switch non-rig workover intervention of the production interval from N-AA/Well-AA to K-AA/Well-5X reservoir in November 2012 using cement packer to isolate existing completion and recomplete in the new target reservoir.
The zone switch and perforation were executed successfully via a cement packer operation but didn't flow after perforation.
Several attempts to bring the well on production such as swabbing were made with no success.
The outcome of the attempts indicated there was poor or lack of connectivity between the wellbore and the sand-face.
A well performance lookback was done to identify the well problem and it was recommended to re-perforate the proposed interval of the well and initiate gas lift.
The recommendation for re-perforation was based on productivity index analysis of previous cement packer completions and the perforation gun performance with respect to the required penetration through the cement plug, tubing/casing and the formation.
Estimated productivity index (PI) from two previous cement packer operations were the basis of the recommendation.
Well-BD (was perforated twice) with calculated PI of 2 Bbls/Day/Psi and Well-CX (which was perforated once) with calculated PI of 0.
3 Bbls/Day/Psi.
This paper will discuss the lessons learnt and best practice from re-perforation of Well-AA with a bigger and deeper penetrating perforation gun that restored initial production from 0 BOPD to 550 BOPD at natural flow condition via a SEWOP barge operation.

Related Results

The cement-bone bond is weaker than cement-cement bond in cement-in-cement revision arthroplasty. A comparative biomechanical study
The cement-bone bond is weaker than cement-cement bond in cement-in-cement revision arthroplasty. A comparative biomechanical study
This study compares the strength of the native bone-cement bond and the old-new cement bond under cyclic loading, using third generation cementing technique, rasping and contaminat...
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Abstarct Introduction Isolated brain hydatid disease (BHD) is an extremely rare form of echinococcosis. A prompt and timely diagnosis is a crucial step in disease management. This ...
First Implementation of Self-Healing Cement Systems in H2S/CO2 Aggressive Environment Across Pay-Zone
First Implementation of Self-Healing Cement Systems in H2S/CO2 Aggressive Environment Across Pay-Zone
Abstract Carbonate reservoirs are often characterized by high pressure and high content of H2S and CO2. For these reasons, drilling the reservoir is the most challen...
FLY ASH FOUNDATION REINFORCED BY CEMENT–SOIL MIXING PILES
FLY ASH FOUNDATION REINFORCED BY CEMENT–SOIL MIXING PILES
Cement-soil mixing piles have been commonly used to enhance the bearing capacity of fly ash stratum and mitigate the settlement damage to the surrounding environment. However, only...
Real-Time Distributed Fiber Optic Sensing for Cement Sheath Integrity Monitoring
Real-Time Distributed Fiber Optic Sensing for Cement Sheath Integrity Monitoring
ABSTRACT: The integrity of cement sheath is critical to oil and gas effective extraction, in which the cement displacement efficiency and solidify quality are the...
Behavior of Nano Calcium Carbonate Modified Smart Cement Contaminated with Oil Based Drilling Mud
Behavior of Nano Calcium Carbonate Modified Smart Cement Contaminated with Oil Based Drilling Mud
Abstract As oil and gas exploration and production expands around the world, there are unique challenges in well construction beginning at the seafloor. There are se...
Expanding Cements for Primary Cementing
Expanding Cements for Primary Cementing
Abstract The expansion of cement and the effect of various expansive aids upon oil well cementing compositions have been investigated to determine the amount of e...

Back to Top