Javascript must be enabled to continue!
Data Driven Optimization of Sidetrack Operation Planning and Execution
View through CrossRef
In the past year, a client in the Arabian Gulf has been increasing appraisal and development well activity from the same slot to reduce the uncertainty of reservoir depth, identify oil-water contact, and determine reservoir production strategy. The operator has been addressing these issues by drilling pilot sections from planned development wells, then plugging and abandoning the section prior to drilling the production lateral. The sidetracking operation is then performed from the previous casing shoe, aided by cement plug and landed to the required horizontal depth provided by the data from pilot section. Conventionally, positive displacement motors (PDM) have been used to perform the sidetrack effectively, then followed by a rotary steerable system (RSS) in the bottom hole assembly (BHA) combined with near-bit logging-while-drilling (LWD) tools to land the well. Because the pilot section is often drilled with water-based mud and penetrates through multiple layers of unstable shales and the reservoir, the hole condition normally deteriorates especially after extensive wireline logging runs, even after the cement plug has been set.
In collaboration with other service providers such as cementing and wireline, the directional service provider revisits the sidetracking procedures to improve the sidetrack operation and reduce overall well construction time. Combining extensive data otherwise kept within each service provider's domain, the directional service provider analyzes the hole condition specific to each pilot section using formation evaluation data, wireline caliper logs, and pilot section drilling mechanics data to determine the sidetrack depth, drilling parameters, cement plug type, and the optimized RSS and BHA to perform the sidetrack efficiently. This detailed sidetracking procedure is then shared to all concerned parties, including to clients at the wellsite and in the office, and other service providers for discussion to align all objectives and ensure the sidetracking operation will be efficient.
In 2018, the operator implemented the sidetracking procedures on 9 wells and achieved 100% success for drilling sidetrack from shoe-to-shoe in a single run. The detailed procedures mitigated the risks of using an RSS and subsequently eliminated the need to run a PDM to initiate the sidetracks. Comparative to sidetracks performed by the PDM, the sidetracking procedure using the RSS BHA managed to reduce drilling time on average of 1 day per well. The RSS BHAs also improved the hole condition for the subsequent activities of the well construction cycle, leading to less casing running issues and improved torque and drag for subsequent sections.
Title: Data Driven Optimization of Sidetrack Operation Planning and Execution
Description:
In the past year, a client in the Arabian Gulf has been increasing appraisal and development well activity from the same slot to reduce the uncertainty of reservoir depth, identify oil-water contact, and determine reservoir production strategy.
The operator has been addressing these issues by drilling pilot sections from planned development wells, then plugging and abandoning the section prior to drilling the production lateral.
The sidetracking operation is then performed from the previous casing shoe, aided by cement plug and landed to the required horizontal depth provided by the data from pilot section.
Conventionally, positive displacement motors (PDM) have been used to perform the sidetrack effectively, then followed by a rotary steerable system (RSS) in the bottom hole assembly (BHA) combined with near-bit logging-while-drilling (LWD) tools to land the well.
Because the pilot section is often drilled with water-based mud and penetrates through multiple layers of unstable shales and the reservoir, the hole condition normally deteriorates especially after extensive wireline logging runs, even after the cement plug has been set.
In collaboration with other service providers such as cementing and wireline, the directional service provider revisits the sidetracking procedures to improve the sidetrack operation and reduce overall well construction time.
Combining extensive data otherwise kept within each service provider's domain, the directional service provider analyzes the hole condition specific to each pilot section using formation evaluation data, wireline caliper logs, and pilot section drilling mechanics data to determine the sidetrack depth, drilling parameters, cement plug type, and the optimized RSS and BHA to perform the sidetrack efficiently.
This detailed sidetracking procedure is then shared to all concerned parties, including to clients at the wellsite and in the office, and other service providers for discussion to align all objectives and ensure the sidetracking operation will be efficient.
In 2018, the operator implemented the sidetracking procedures on 9 wells and achieved 100% success for drilling sidetrack from shoe-to-shoe in a single run.
The detailed procedures mitigated the risks of using an RSS and subsequently eliminated the need to run a PDM to initiate the sidetracks.
Comparative to sidetracks performed by the PDM, the sidetracking procedure using the RSS BHA managed to reduce drilling time on average of 1 day per well.
The RSS BHAs also improved the hole condition for the subsequent activities of the well construction cycle, leading to less casing running issues and improved torque and drag for subsequent sections.
Related Results
Sidetrack Trajectory Success Indicator
Sidetrack Trajectory Success Indicator
Abstract
The drilling of a secondary wellbore departing from a primary wellbore, known as a sidetrack, is used for many reasons during wellbore construction. Sidetra...
Innovative Strategy Enabling High Quality Cementing of a Challenging Sidetrack
Innovative Strategy Enabling High Quality Cementing of a Challenging Sidetrack
Abstract
Shell team was tasked to design and execute a complex ~9,000 ft sidetrack from vertical kick off design from a 9-5/8" casing. Goal was to drill and run 7-in...
Coiled Tubing Drilling of Horizontal Sidetrack in House Mountain Field, Alberta
Coiled Tubing Drilling of Horizontal Sidetrack in House Mountain Field, Alberta
Abstract
The first horizontal section of an oil well was successfully drilled directionally using 2-3/8-in., 0.188-in. wall coiled tubing (CT) in House Mountain F...
Advanced Well Positioning with Magnetic Interference Based on Passive Magnetic MWD Ranging: Case Study
Advanced Well Positioning with Magnetic Interference Based on Passive Magnetic MWD Ranging: Case Study
Abstract
This paper presents an efficient application of Passive Magnetic Ranging (PMR) on the B3 well sidetrack drilled on the High Pressure/High Temperature (HP/HT...
WIRELINE TRACTOR SYSTEMS IN SIDETRACK WELLS
WIRELINE TRACTOR SYSTEMS IN SIDETRACK WELLS
Sidetrack wells are widely used to extend reservoir access and improve field recovery; however, their complex geometry limits conventional gravity-driven wireline conveyance. High ...
What is the Optimal Trajectory of Sidetrack Horizontal Well for Bypassing Obstacles in Cluster Wells?
What is the Optimal Trajectory of Sidetrack Horizontal Well for Bypassing Obstacles in Cluster Wells?
Abstract
Trajectory design of sidetrack horizontal well is faced with bypassing obstacles in cluster wells which makes the design process more complicated. The obsta...
Process scheduling analysis and dynamic optimization maintaining the operation margin for acetylene fixed-bed hydrogenation reactor
Process scheduling analysis and dynamic optimization maintaining the operation margin for acetylene fixed-bed hydrogenation reactor
AbstractThe full cycle operation optimization of acetylene hydrogenation reactor should be carried out rigidly according to the operation optimization scheme within the operation c...
GeneSys Doublet: setup and test of a geothermal well doublet in Lower Cretaceous sandstones of northern Germany – an outlook.
GeneSys Doublet: setup and test of a geothermal well doublet in Lower Cretaceous sandstones of northern Germany – an outlook.
<p>The Federal Institute for Geosciences and Natural Resources (BGR) has drilled the approx. 3,900m deep geothermal well Gro&#223; Buchholz Gt1 as part of the...