Javascript must be enabled to continue!
Advanced Well Positioning with Magnetic Interference Based on Passive Magnetic MWD Ranging: Case Study
View through CrossRef
Abstract
This paper presents an efficient application of Passive Magnetic Ranging (PMR) on the B3 well sidetrack drilled on the High Pressure/High Temperature (HP/HT) Elgin field in the UK Central-North Sea. The planning and execution of this sidetrack presented an escalated set of challenges beyond those encountered in standard well conditions due to the high temperature (HT), the potential for magnetic interference and collision avoidance constraints. The PMR method was deployed in order to mitigate the risk of, and ultimately resolve, magnetic interference. This resulted in minimised collision risk and safe achievement of the sidetrack in a HT environment.
Challenges were faced in the 12 ½″ section which resulted in the open-hole being plugged and abandoned below the 14″ casing shoe, with the drill-string cemented in place. A complex sidetrack was planned below the 14″ shoe. Reservoir target and collision avoidance constraints required the planned sidetrack well-path to be close to the abandoned branch, therefore magnetic interference was possible. PMR was planned in the case of interference. The aim was to make the preparation and operational deployment process as efficient as possible, while drilling this sensitive section. A work-flow was developed to manage the performance of ranging passes, specifically interfaces between all parties involved in operations. PMR was deployed to map the relative position of the well during periods of interference and develop ‘synthetic surveys’ to construct the well-path, allowing collision avoidance calculations by defining reliable projection ahead and thus permitting steering of the drilling assembly.
The PMR process was successfully deployed on B3 after experiencing high magnetic interference allowing drilling to continue to planned depth with limited impact on operations. This paper provides information on the application of independent PMR and processing aspects to be considered when defining relative wellbore position based on synthetic surveys. Understanding advantages and limitations of PMR opens up opportunities to benefit from this technique in similar challenging drilling applications and help to reduce operational risk and optimise cost. PMR can thus provide a viable alternative to Gyro While Drilling (GWD), where conditions do not allow or where the probability of magnetic interference is marginal and high tool costs could be incurred when potentially not required.
Title: Advanced Well Positioning with Magnetic Interference Based on Passive Magnetic MWD Ranging: Case Study
Description:
Abstract
This paper presents an efficient application of Passive Magnetic Ranging (PMR) on the B3 well sidetrack drilled on the High Pressure/High Temperature (HP/HT) Elgin field in the UK Central-North Sea.
The planning and execution of this sidetrack presented an escalated set of challenges beyond those encountered in standard well conditions due to the high temperature (HT), the potential for magnetic interference and collision avoidance constraints.
The PMR method was deployed in order to mitigate the risk of, and ultimately resolve, magnetic interference.
This resulted in minimised collision risk and safe achievement of the sidetrack in a HT environment.
Challenges were faced in the 12 ½″ section which resulted in the open-hole being plugged and abandoned below the 14″ casing shoe, with the drill-string cemented in place.
A complex sidetrack was planned below the 14″ shoe.
Reservoir target and collision avoidance constraints required the planned sidetrack well-path to be close to the abandoned branch, therefore magnetic interference was possible.
PMR was planned in the case of interference.
The aim was to make the preparation and operational deployment process as efficient as possible, while drilling this sensitive section.
A work-flow was developed to manage the performance of ranging passes, specifically interfaces between all parties involved in operations.
PMR was deployed to map the relative position of the well during periods of interference and develop ‘synthetic surveys’ to construct the well-path, allowing collision avoidance calculations by defining reliable projection ahead and thus permitting steering of the drilling assembly.
The PMR process was successfully deployed on B3 after experiencing high magnetic interference allowing drilling to continue to planned depth with limited impact on operations.
This paper provides information on the application of independent PMR and processing aspects to be considered when defining relative wellbore position based on synthetic surveys.
Understanding advantages and limitations of PMR opens up opportunities to benefit from this technique in similar challenging drilling applications and help to reduce operational risk and optimise cost.
PMR can thus provide a viable alternative to Gyro While Drilling (GWD), where conditions do not allow or where the probability of magnetic interference is marginal and high tool costs could be incurred when potentially not required.
Related Results
Measuring-While-Drilling: Transforming Geotechnical Site Characterization Drilling
Measuring-While-Drilling: Transforming Geotechnical Site Characterization Drilling
"Interest in Measuring-While-Drilling (MWD) within the U.S. geotechnical industry has been growing significantly over the last several years. This largely began after the Federal H...
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Abstarct
Introduction
Isolated brain hydatid disease (BHD) is an extremely rare form of echinococcosis. A prompt and timely diagnosis is a crucial step in disease management. This ...
An Innovative MEMS-Based MWD Method for Directional Drilling
An Innovative MEMS-Based MWD Method for Directional Drilling
Abstract
To overcome the challenges and disadvantages of conventional simple vertical drilling methods, directional drilling, which directs a wellbore along a predef...
A New Measurement While Drilling System Designed Specifically For Drilling Unconventional Wells
A New Measurement While Drilling System Designed Specifically For Drilling Unconventional Wells
Abstract
The recent drilling explosion targeting unconventional reservoirs has created extraordinary opportunities for growth in the oil industry and has also presen...
Breast Carcinoma within Fibroadenoma: A Systematic Review
Breast Carcinoma within Fibroadenoma: A Systematic Review
Abstract
Introduction
Fibroadenoma is the most common benign breast lesion; however, it carries a potential risk of malignant transformation. This systematic review provides an ove...
A Study on Brand Positioning in Dairy Product at Villupuram, Tamil Nadu
A Study on Brand Positioning in Dairy Product at Villupuram, Tamil Nadu
Brand positioning is a core concept in marketing. Despite the importance of the concept however, there is limited research in the field of positioning clarifying to what extent var...
Case History of First Use of Extended-Range EM MWD in Offshore, Underbalanced Drilling
Case History of First Use of Extended-Range EM MWD in Offshore, Underbalanced Drilling
Abstract
This paper discusses the planning, results, problems, and lessons learned during the first use of the Extended-Range Electromagnetic (EM) MWD system for und...
Step Change in Wellbore Positioning Accuracy
Step Change in Wellbore Positioning Accuracy
Abstract
A survey program is designed for every well drilled to meet the well objective of penetrating the target reservoir and to avoid colliding with other offset ...

