Javascript must be enabled to continue!
Optimasi Penjadwalan Produksi Sanjai Rina Menggunakan Algoritma Campbell Dudek Smith
View through CrossRef
Abstract — Kerupuk sanjai Rina business always run into lateness in product delivery because they haven’t done production which will be deliver and delivery deadline only based on intuition. Sanjai Rina have need to establist a better production schedule so that be able to minimizing all product work time total. There are many ways to minimizing total of work time, one of them is using Campbell Dudek Smith (CDS) algorithm. The purpose of the research to know best outcome sanjai Rina production prosess scheduling using CDS algorithm. CDS algorithm obtain k iteration with different values. From k iteration, minimal value will be use to determine production thread. Sanjai Rina business have total time work all of product is 435,88 hours by sequence 1-2-3-4-5-6-7-8. From CDS algorithm iterations, obtain minimal scheduling by sequence 4-8-3-1-2-6-7-5 with total work time all of yhe product is 375,26 hours that will attain saving 60,22 hours time work.
Title: Optimasi Penjadwalan Produksi Sanjai Rina Menggunakan Algoritma Campbell Dudek Smith
Description:
Abstract — Kerupuk sanjai Rina business always run into lateness in product delivery because they haven’t done production which will be deliver and delivery deadline only based on intuition.
Sanjai Rina have need to establist a better production schedule so that be able to minimizing all product work time total.
There are many ways to minimizing total of work time, one of them is using Campbell Dudek Smith (CDS) algorithm.
The purpose of the research to know best outcome sanjai Rina production prosess scheduling using CDS algorithm.
CDS algorithm obtain k iteration with different values.
From k iteration, minimal value will be use to determine production thread.
Sanjai Rina business have total time work all of product is 435,88 hours by sequence 1-2-3-4-5-6-7-8.
From CDS algorithm iterations, obtain minimal scheduling by sequence 4-8-3-1-2-6-7-5 with total work time all of yhe product is 375,26 hours that will attain saving 60,22 hours time work.
Related Results
Six Sigma” pada UMKM Rina Payakumbuh Untuk Minimasi Defect Produk Sanjai
Six Sigma” pada UMKM Rina Payakumbuh Untuk Minimasi Defect Produk Sanjai
<div><p class="1eAbstract-text"><em>Based on Survey data in 2018, Payakumbuh has a cracker industry of 44%, a wet cake industry 37%, 11% of the food industry whic...
Modal Sosial Industri Keripik Sanjai di Kota Bukitinggi
Modal Sosial Industri Keripik Sanjai di Kota Bukitinggi
The Sanjai area, which is one of the sanjai chip industries in Bukittinggi City, is still actively engaged in the sanjai chip industry. The sanjai chip industry will be able to sur...
PEMODELAN SISTEM PENJADWALAN PERKULIAHAN MENGGUNAKAN ALGORITMA GENETIKA
PEMODELAN SISTEM PENJADWALAN PERKULIAHAN MENGGUNAKAN ALGORITMA GENETIKA
Penjadwalan perkuliahan merupakan kegiatan pembuatan jadwal kuliah pada perguruan tinggi. Jadwal kuliah tersebut akan dijadikan sebagai acuan kegiatan belajar mengajar selama satu ...
Pengaruh Kualitas Pelayanan Terhadap loyalitas konsumen yang dimediasi oleh kepuasan konsumen Studi Kasus Sanjai Rina Kota Payakumbuh
Pengaruh Kualitas Pelayanan Terhadap loyalitas konsumen yang dimediasi oleh kepuasan konsumen Studi Kasus Sanjai Rina Kota Payakumbuh
Dalam dunia bisnis,semakin ketatnya persaingan antar UMKM dari tahun ke tahun menuntut UMKM harus mampu bertahan dan berkompetensi dengan UMKM lainnya. Salah satu UMKM yang harus b...
Plasma AR Alterations and Timing of Intensified Hormone Treatment for Prostate Cancer
Plasma AR Alterations and Timing of Intensified Hormone Treatment for Prostate Cancer
This randomized clinical trial explores whether hormone intensification at start of androgen deprivation therapy alters selection of androgen receptor (AR) gene alterations within ...
Perbandingan Algoritma Boruvka Dan Algoritma Sollin Pada Optimasi Kebutuhan Kabel Fiber Optik Universitas Bengkulu
Perbandingan Algoritma Boruvka Dan Algoritma Sollin Pada Optimasi Kebutuhan Kabel Fiber Optik Universitas Bengkulu
Optimasi adalah hal penting dalam suatu algoritma. Ini dapat menghemat kebutuhan dalam suatu kegiatan. Pada Minimum Spanning Tree, yang ingin dicapai adalah bagaimana semua vertexs...
PENJADWALAN DAN PENGEMBANGAN RENCANA KERJA DI INDUSTRI YOGHURT
PENJADWALAN DAN PENGEMBANGAN RENCANA KERJA DI INDUSTRI YOGHURT
Penjadwalan dan perencanaan kerja pada industri diperlukan untuk memastikan ketepatan dan efisiensi waktu proses produksi. Industri yoghurt berbahan baku susu yang rentan terkonta...
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
Analisis waktu standar produksi merupakan salah satu analisis metoda kuantitatif yang dilakukan untuk mengukur waktu produksi dan bertujuan agar dapat memiliki waktu standar sebaga...

