To increase production, the Deep Ore Zone (DOZ) mining department has a concept of implementing a staggered crew. A staggered crew is a crew formed specifically to support production activities. To assess the performance of the application of the staggered crew, an evaluation of the factors that influence production activities is carried out. Factors that are subject to evaluation are working time, number of operators, and production capability. The results of evaluating work time (optimum efficiency) for crew I, II, and III showed as follows 29%, 30%, and 28% respectively. Very low efficiency is due to time constraints in operation, which are affected by delay time, idle time, and maintenance time. Average productive work time (work) is 3.26 hours/day, delay time is 3.26 hours/day, idle time is 4.03 hours/day, and maintenance time is 0.53 hours/day. Idle time is the highest time of these four parameters. The results also showed that there were differences in the number of distribution operators, namely Crew I numbered 16 people, crew II numbered 12 people and Crew III numbered 15 people. But the number of operators on each crew is still sufficient to support production activities. The average production is 62.14 tons/hour and 4,784.78 tons/day. So with a production of 62.14 tons/hour and a working time of 11 hours/day, it takes a minimum of 8 dump truck operators to reach a value of 5,468.32 tons/day.
Title: STAGGERED CREW PRODUCTION EVALUATION IN DEEP ORE ZONE UNDERGROUND MINING PT. FREEPORT INDONESIA
Description:
To increase production, the Deep Ore Zone (DOZ) mining department has a concept of implementing a staggered crew.
A staggered crew is a crew formed specifically to support production activities.
To assess the performance of the application of the staggered crew, an evaluation of the factors that influence production activities is carried out.
Factors that are subject to evaluation are working time, number of operators, and production capability.
The results of evaluating work time (optimum efficiency) for crew I, II, and III showed as follows 29%, 30%, and 28% respectively.
Very low efficiency is due to time constraints in operation, which are affected by delay time, idle time, and maintenance time.
Average productive work time (work) is 3.
26 hours/day, delay time is 3.
26 hours/day, idle time is 4.
03 hours/day, and maintenance time is 0.
53 hours/day.
Idle time is the highest time of these four parameters.
The results also showed that there were differences in the number of distribution operators, namely Crew I numbered 16 people, crew II numbered 12 people and Crew III numbered 15 people.
But the number of operators on each crew is still sufficient to support production activities.
The average production is 62.
14 tons/hour and 4,784.
78 tons/day.
So with a production of 62.
14 tons/hour and a working time of 11 hours/day, it takes a minimum of 8 dump truck operators to reach a value of 5,468.
32 tons/day.

Related Results

Civil aircraft crew alarm ranking method
Civil aircraft crew alarm ranking method
Cockpit crew alerts are primarily used to draw the attention of flight crews to be aware of failures, malfunctions, abnormal states or unexpected state changes in aircraft and airc...
Freeport, the Environment, and the Amungme
Freeport, the Environment, and the Amungme
The Amungme and Kamoro managed their environments for thousands of years in what is now Papua, Indonesia. In the late 1960s, seeking foreign capital to boost the nation’s economy, ...
Study on the Effect of Ore-Drawing Shear Factor on Underground Debris Flow in the Block Caving Method
Study on the Effect of Ore-Drawing Shear Factor on Underground Debris Flow in the Block Caving Method
The shear factor of ore drawing is an important factor affecting the formation of underground debris flows. The aim of this study was to investigate the effect of the mining shear ...
Underground Blowouts In Deep Well Drilling
Underground Blowouts In Deep Well Drilling
ABSTRACT A kick occurs when the wellbore pressure becomes less than the formation pressure, and formation fluid enters the wellbore. When the flow of formation fl...
Alternative Entrances: Phillip Noyce and Sydney’s Counterculture
Alternative Entrances: Phillip Noyce and Sydney’s Counterculture
Phillip Noyce is one of Australia’s most prominent film makers—a successful feature film director with both iconic Australian narratives and many a Hollywood blockbuster under his ...
Project Management for Main Pass 299 Sulphur and Oil and Gas Facilities
Project Management for Main Pass 299 Sulphur and Oil and Gas Facilities
ABSTRACT Describes Project Management techniques used to organize and execute a major sulphur-oil and gas project located in the Gulf of Mexico. Project Managemen...
Proizvodnja željeza u kasnoj antici i ranome srednjem vijeku u Podravini – tehnološki aspekti i društveni kontekst
Proizvodnja željeza u kasnoj antici i ranome srednjem vijeku u Podravini – tehnološki aspekti i društveni kontekst
Previous archaeological investigations in present-day Gornja Podravina have created prerequisites for the study of the wider context of iron production in the period of Late Antiqu...
Empowering Underground Laboratories Network Usage in the Baltic Sea Region
Empowering Underground Laboratories Network Usage in the Baltic Sea Region
<p>In the Baltic Sea region, there are world leading science organisations and industrial companies specialised in geophysics, geology and underground construction. T...

Back to Top