Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Decommissioning of Umbilicals and Flexible Pipes - A Sensitivity Analysis in Decision-Making Process

View through CrossRef
Abstract The decommissioning of subsea equipment is a reality in Brazil and worldwide, highlighting the need for the development of decision-making methodologies for application in decommissioning projects. In Brazil, the volume of umbilicals and flexible pipes to be decommissioned in the future is huge and an analysis of the best decommissioning alternative would be desirable. Based on a decision-making methodology developed by a COPPE/UFRJ research group, this work aims to present the technical criterion for decommissioning decision-making process and a sensitivity analysis regarding the approach developed for this criterion. Among five different criteria, the proposed technical approach is composed of two sub-criteria — Complexity of Operations and Technological Risk — allowing us to assess the complexity of execution and operational activities of decommissioning alternatives and the technological risk associated with them. The decommissioning alternatives were divided into two groups — leave in situ and removal — and a total of six alternatives were considered in this study. The analyses developed to show the influence of different parameters in the methodology results emphasizes the robustness of the proposed methodology. Also, this work presents a preliminary indication for various decommissioning scenarios, varying combinations of water depth, structural integrity, cleaning status, and other factors. The results obtained in this work contribute to the consolidation of a robust methodology for the application and foundation of decision-making in decommissioning projects for flexible and umbilical lines.
Title: Decommissioning of Umbilicals and Flexible Pipes - A Sensitivity Analysis in Decision-Making Process
Description:
Abstract The decommissioning of subsea equipment is a reality in Brazil and worldwide, highlighting the need for the development of decision-making methodologies for application in decommissioning projects.
In Brazil, the volume of umbilicals and flexible pipes to be decommissioned in the future is huge and an analysis of the best decommissioning alternative would be desirable.
Based on a decision-making methodology developed by a COPPE/UFRJ research group, this work aims to present the technical criterion for decommissioning decision-making process and a sensitivity analysis regarding the approach developed for this criterion.
Among five different criteria, the proposed technical approach is composed of two sub-criteria — Complexity of Operations and Technological Risk — allowing us to assess the complexity of execution and operational activities of decommissioning alternatives and the technological risk associated with them.
The decommissioning alternatives were divided into two groups — leave in situ and removal — and a total of six alternatives were considered in this study.
The analyses developed to show the influence of different parameters in the methodology results emphasizes the robustness of the proposed methodology.
Also, this work presents a preliminary indication for various decommissioning scenarios, varying combinations of water depth, structural integrity, cleaning status, and other factors.
The results obtained in this work contribute to the consolidation of a robust methodology for the application and foundation of decision-making in decommissioning projects for flexible and umbilical lines.

Related Results

Converted Barge for Wellhead Platform Decommissioning
Converted Barge for Wellhead Platform Decommissioning
Abstract This paper presents an alternative method for decommissioning offshore wellhead platform using converted flat top barge as decommissioning barge. The barge ...
Installability of Umbilicals
Installability of Umbilicals
Abstract Offshore umbilical systems are essential for transmitting power and signals required to operate subsea facilities. In particular, umbilicals are made of ...
Consistent VIV Fatigue Analysis Methodology of Umbilicals
Consistent VIV Fatigue Analysis Methodology of Umbilicals
The fatigue life assessment of umbilicals due to vortex induced vibrations (VIV) requires special attention to the structural properties of the umbilical due to the stick/slip beha...
Autonomy on Trial
Autonomy on Trial
Photo by CHUTTERSNAP on Unsplash Abstract This paper critically examines how US bioethics and health law conceptualize patient autonomy, contrasting the rights-based, individualist...
A New Multi-Criteria Decision-Making Tool for Subsea Oil and Gas Asset Decommissioning
A New Multi-Criteria Decision-Making Tool for Subsea Oil and Gas Asset Decommissioning
Abstract The decommissioning of offshore oil and gas (O&G) facilities poses significant challenges due to high costs, operational risks, social impacts, and envi...
Current Situation and Development Trend of Decommissioning of Nuclear Power Plants
Current Situation and Development Trend of Decommissioning of Nuclear Power Plants
Abstract The complete life of a nuclear power plant consists of three stages: construction, operation and decommissioning. In the last stage of the operation life of...
Collaborations Involving Malaysia Upstream Regulator to Enhance Decommissioning
Collaborations Involving Malaysia Upstream Regulator to Enhance Decommissioning
Abstract This paper aims to share the collaboration efforts of Malaysia's governing body for Upstream oil & gas industry with various stakeholders to enhance dec...
Environmental Implications Of Decommissioning A Major Sour Gas Plant In Alberta
Environmental Implications Of Decommissioning A Major Sour Gas Plant In Alberta
Abstract Concern regarding the environmental implications of decommissioning major industrial facilities has been growing in recent years. Long term plant operati...

Back to Top