Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

The Instability Analysis and Processing Scheme of ChangXin Viaduct Abutment

View through CrossRef
In order to solve the abutment instability problem of the ChangXin Viaduct in JiLin to YanJi highway, we had the detailed geology survey and exploration of the abutment and its back roadbed, and had also the test of soil bulk density and the shear strength, and the deformation monitoring. The results show that the groundwater runoff and seepage functions for the abutment and its back roadbed are both strong because they are in the slope which in the junction of large diameter group sandstone and mudstone. Because of the two months consecutive rain function, the group stratum became soft in water, and added the combined function of the abutment and its back filled soil, so caused this group stratum sliding under the abutment and its back subgrade, and led to the abutment instability. To prevent the continuing landslide development, and maintain the landslide stability and the security of the bridges and roadbed, according to the causes above, we took the following treatment measures: Dismantling the finished 0th abutment and 1st pier, increasing two holes bridges, so making the abutment away from the landslide area, and at the same time transforming the extending foundation form to pile foundation, so they can reduce the damage function to the original slope body; Appropriately cutting earthwork and lessening weight of the landslide, using antiskid pile supporting baffle in the landslide body, and adopting blind ditch and cutting, drainage ditch to process drainage treatment, all of these ensure the stability of landslide and no adverse effects on bridge foundation.
Title: The Instability Analysis and Processing Scheme of ChangXin Viaduct Abutment
Description:
In order to solve the abutment instability problem of the ChangXin Viaduct in JiLin to YanJi highway, we had the detailed geology survey and exploration of the abutment and its back roadbed, and had also the test of soil bulk density and the shear strength, and the deformation monitoring.
The results show that the groundwater runoff and seepage functions for the abutment and its back roadbed are both strong because they are in the slope which in the junction of large diameter group sandstone and mudstone.
Because of the two months consecutive rain function, the group stratum became soft in water, and added the combined function of the abutment and its back filled soil, so caused this group stratum sliding under the abutment and its back subgrade, and led to the abutment instability.
To prevent the continuing landslide development, and maintain the landslide stability and the security of the bridges and roadbed, according to the causes above, we took the following treatment measures: Dismantling the finished 0th abutment and 1st pier, increasing two holes bridges, so making the abutment away from the landslide area, and at the same time transforming the extending foundation form to pile foundation, so they can reduce the damage function to the original slope body; Appropriately cutting earthwork and lessening weight of the landslide, using antiskid pile supporting baffle in the landslide body, and adopting blind ditch and cutting, drainage ditch to process drainage treatment, all of these ensure the stability of landslide and no adverse effects on bridge foundation.

Related Results

Research on dynamic deformation monitoring of viaduct based on digital camera
Research on dynamic deformation monitoring of viaduct based on digital camera
Abstract In order to realize dynamic deformation monitoring of viaduct and provide data support for safe operation of viaduct, this paper studies the application of ...
Implant‐Abutment Interface: Biomechanical Study of Flat Top versus Conical
Implant‐Abutment Interface: Biomechanical Study of Flat Top versus Conical
ABSTRACT Background: Overloading has been identified as a primary factor behind dental implant failure. The peak bone stresses normally appear in the marginal bone. The anchorage s...
LONG-TERM RESPONSE PREDICTION OF INTEGRAL ABUTMENT BRIDGE UNDER TIME-DEPENDENT EFFECT
LONG-TERM RESPONSE PREDICTION OF INTEGRAL ABUTMENT BRIDGE UNDER TIME-DEPENDENT EFFECT
Parametric study was conducted to assess the time-dependent effect of creep on longterm behaviour of prestressed concrete Integral Abutment Bridge (IAB). Varying backfill soil type...
REUSE OF THE INTRAOSSEOUS PART OF THE DENTAL IMPLANT (THE CLINICAL CASE)
REUSE OF THE INTRAOSSEOUS PART OF THE DENTAL IMPLANT (THE CLINICAL CASE)
Introduction. Replacement of a small included defect in the frontal area with a fixed structure based on the implant is the optimal solution. It is not always required to remove th...
UPAYA PENGENDALIAN GERUSAN DI SEKITAR ABUTMEN JEMBATAN
UPAYA PENGENDALIAN GERUSAN DI SEKITAR ABUTMEN JEMBATAN
The research aims to know the influence of abutment cover on scouring process, depth and change of bedconfiguration around abutment. The research is carried out by experiment in hy...

Back to Top