Javascript must be enabled to continue!
The Instability Analysis and Processing Scheme of ChangXin Viaduct Abutment
View through CrossRef
In order to solve the abutment instability problem of the ChangXin Viaduct in JiLin to YanJi highway, we had the detailed geology survey and exploration of the abutment and its back roadbed, and had also the test of soil bulk density and the shear strength, and the deformation monitoring. The results show that the groundwater runoff and seepage functions for the abutment and its back roadbed are both strong because they are in the slope which in the junction of large diameter group sandstone and mudstone. Because of the two months consecutive rain function, the group stratum became soft in water, and added the combined function of the abutment and its back filled soil, so caused this group stratum sliding under the abutment and its back subgrade, and led to the abutment instability. To prevent the continuing landslide development, and maintain the landslide stability and the security of the bridges and roadbed, according to the causes above, we took the following treatment measures: Dismantling the finished 0th abutment and 1st pier, increasing two holes bridges, so making the abutment away from the landslide area, and at the same time transforming the extending foundation form to pile foundation, so they can reduce the damage function to the original slope body; Appropriately cutting earthwork and lessening weight of the landslide, using antiskid pile supporting baffle in the landslide body, and adopting blind ditch and cutting, drainage ditch to process drainage treatment, all of these ensure the stability of landslide and no adverse effects on bridge foundation.
Trans Tech Publications, Ltd.
Title: The Instability Analysis and Processing Scheme of ChangXin Viaduct Abutment
Description:
In order to solve the abutment instability problem of the ChangXin Viaduct in JiLin to YanJi highway, we had the detailed geology survey and exploration of the abutment and its back roadbed, and had also the test of soil bulk density and the shear strength, and the deformation monitoring.
The results show that the groundwater runoff and seepage functions for the abutment and its back roadbed are both strong because they are in the slope which in the junction of large diameter group sandstone and mudstone.
Because of the two months consecutive rain function, the group stratum became soft in water, and added the combined function of the abutment and its back filled soil, so caused this group stratum sliding under the abutment and its back subgrade, and led to the abutment instability.
To prevent the continuing landslide development, and maintain the landslide stability and the security of the bridges and roadbed, according to the causes above, we took the following treatment measures: Dismantling the finished 0th abutment and 1st pier, increasing two holes bridges, so making the abutment away from the landslide area, and at the same time transforming the extending foundation form to pile foundation, so they can reduce the damage function to the original slope body; Appropriately cutting earthwork and lessening weight of the landslide, using antiskid pile supporting baffle in the landslide body, and adopting blind ditch and cutting, drainage ditch to process drainage treatment, all of these ensure the stability of landslide and no adverse effects on bridge foundation.
Related Results
Stress analysis in implant, abutment, and peripheral bone with different restorative crown and abutment materials: A three-dimensional finite element analysis study
Stress analysis in implant, abutment, and peripheral bone with different restorative crown and abutment materials: A three-dimensional finite element analysis study
Background:
Stresses on prosthetic crown directly influences the survival rate of implants hence it should be considered while selecting prosthetic material.
...
Research on dynamic deformation monitoring of viaduct based on digital camera
Research on dynamic deformation monitoring of viaduct based on digital camera
Abstract
In order to realize dynamic deformation monitoring of viaduct and provide data support for safe operation of viaduct, this paper studies the application of ...
ImplantāAbutment Interface: Biomechanical Study of Flat Top versus Conical
ImplantāAbutment Interface: Biomechanical Study of Flat Top versus Conical
ABSTRACT Background: Overloading has been identified as a primary factor behind dental implant failure. The peak bone stresses normally appear in the marginal bone. The anchorage s...
LONG-TERM RESPONSE PREDICTION OF INTEGRAL ABUTMENT BRIDGE UNDER TIME-DEPENDENT EFFECT
LONG-TERM RESPONSE PREDICTION OF INTEGRAL ABUTMENT BRIDGE UNDER TIME-DEPENDENT EFFECT
Parametric study was conducted to assess the time-dependent effect of creep on longterm behaviour of prestressed concrete Integral Abutment Bridge (IAB). Varying backfill soil type...
REUSE OF THE INTRAOSSEOUS PART OF THE DENTAL IMPLANT (THE CLINICAL CASE)
REUSE OF THE INTRAOSSEOUS PART OF THE DENTAL IMPLANT (THE CLINICAL CASE)
Introduction. Replacement of a small included defect in the frontal area with a fixed structure based on the implant is the optimal solution. It is not always required to remove th...
UPAYA PENGENDALIAN GERUSAN DI SEKITAR ABUTMEN JEMBATAN
UPAYA PENGENDALIAN GERUSAN DI SEKITAR ABUTMEN JEMBATAN
The research aims to know the influence of abutment cover on scouring process, depth and change of bedconfiguration around abutment. The research is carried out by experiment in hy...
<span style="mso-ansi-language: EN;">Retrieval of Fractured Abutment Screw of Dental Implant. Case Report<span style="font-size: 10.0pt; mso-ansi-font-size: 18.0pt; font-family: 'Times New Roman',serif; mso-ascii-font-family: 'Palatino Linotype';
<span style="mso-ansi-language: EN;">Retrieval of Fractured Abutment Screw of Dental Implant. Case Report<span style="font-size: 10.0pt; mso-ansi-font-size: 18.0pt; font-family: 'Times New Roman',serif; mso-ascii-font-family: 'Palatino Linotype';
Background: The advancement of dental implants marks a significant milestone in modern dentistry, offering an effective solution for tooth replacement while improving both function...
Experimental investigation of three-dimensional turbulence and scour mechanisms around bridge piers and abutment using acoustic doppler velocimetry (ADV)
Experimental investigation of three-dimensional turbulence and scour mechanisms around bridge piers and abutment using acoustic doppler velocimetry (ADV)
Abstract
Understanding the three-dimensional flow turbulence generated by the combined presence of a bridge abutment and adjacent piers is es...

