Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

AXI Inspection Study with Heavily Shielded Press-Fit Connectors (IMPEL)

View through CrossRef
ABSTRACT The demand for increased network bandwidth and advanced technology has led to the development on complex and high performance backplane/mid-plane connector. Impel connector is the name of connector that meets growing demands of next generation telecommunication and data networking requirement. The usage of this type of connector has become more and more important in today networking product and more and more connectors are mounted onto PCBA due to their high performance in signal integrity and density. However, because its construction and density of the connector, performing inspection is one of the most critical area after insertion (press fit) process with current Automated X-ray inspection (AXI). It is become very challenging for getting clear AXI image with such heavily shielded press fit connectors. In this paper, we would like to share our experience with challenging Impel Press-Fit connector. Current PCBA populated with total 16 Impel connectors are go through AXI inspection process, to ensure that all the pins are properly inserted and ensure no bent pin, crushed, broken off and smashed issues enclosed inside the PCB drill hole. We have been working with AXI-A, AXI-B and AXI-C, and looking for inspection solutions since July 2015. AXI-A is normal AXI (Automated X-ray Inspection); whereas AXI-B are equipped with Computer Tomography (CT) capability. AXI-C is AXI without CT capabilities. AXI-B has the capability to detect connector defect with very clear X-ray images, and judgement of the pass/fail are very much on dependent well trained AXI operator. However, AXI-B testing times are longer than AXI-A, especially inspection PCBA with Impel connectors. We overcome all the arises issues and successfully develop a good method on the algorithm and threshold setting at AXI-B - it is discussed in detail in the paper. With the join studied for the past one year between Flex Penang P1 team and AXI-B Engineers including R&D support, our result of the collaboration is very impress. Machine defect escapee rate has been tremendously brought down from about 20% to 0% and false call rate DPPM has reduced significantly from >20,000 to
Title: AXI Inspection Study with Heavily Shielded Press-Fit Connectors (IMPEL)
Description:
ABSTRACT The demand for increased network bandwidth and advanced technology has led to the development on complex and high performance backplane/mid-plane connector.
Impel connector is the name of connector that meets growing demands of next generation telecommunication and data networking requirement.
The usage of this type of connector has become more and more important in today networking product and more and more connectors are mounted onto PCBA due to their high performance in signal integrity and density.
However, because its construction and density of the connector, performing inspection is one of the most critical area after insertion (press fit) process with current Automated X-ray inspection (AXI).
It is become very challenging for getting clear AXI image with such heavily shielded press fit connectors.
In this paper, we would like to share our experience with challenging Impel Press-Fit connector.
Current PCBA populated with total 16 Impel connectors are go through AXI inspection process, to ensure that all the pins are properly inserted and ensure no bent pin, crushed, broken off and smashed issues enclosed inside the PCB drill hole.
We have been working with AXI-A, AXI-B and AXI-C, and looking for inspection solutions since July 2015.
AXI-A is normal AXI (Automated X-ray Inspection); whereas AXI-B are equipped with Computer Tomography (CT) capability.
AXI-C is AXI without CT capabilities.
AXI-B has the capability to detect connector defect with very clear X-ray images, and judgement of the pass/fail are very much on dependent well trained AXI operator.
However, AXI-B testing times are longer than AXI-A, especially inspection PCBA with Impel connectors.
We overcome all the arises issues and successfully develop a good method on the algorithm and threshold setting at AXI-B - it is discussed in detail in the paper.
With the join studied for the past one year between Flex Penang P1 team and AXI-B Engineers including R&D support, our result of the collaboration is very impress.
Machine defect escapee rate has been tremendously brought down from about 20% to 0% and false call rate DPPM has reduced significantly from >20,000 to.

Related Results

Eyes on Air
Eyes on Air
Abstract We at ADNOC Logistics & Services have identified the need for a Fully Integrated Inspection and Monitoring Solution to meet our operational, safety and ...
Electrical Connectors
Electrical Connectors
Abstract Electrical connectors are mechanical devices that connect wires, cables, printed circuit boards, and electronic components to each other and to related equipment...
Machine Learning-Assisted Optimal Schedule of Underground Water Pipe Inspection
Machine Learning-Assisted Optimal Schedule of Underground Water Pipe Inspection
Abstract There are over 2.2 million miles of underground water pipes serving the cities in the United States. Many are in poor conditions and deteriorate rapidly. Failures ...
Withdrawal Capacity of Joints Constructed with 9.5-mm and 15.9-mm Through-Bolts and Diameter Nominal 15-mm and 25-mm Pipe-Nut Connectors
Withdrawal Capacity of Joints Constructed with 9.5-mm and 15.9-mm Through-Bolts and Diameter Nominal 15-mm and 25-mm Pipe-Nut Connectors
Tests were conducted to determine the withdrawal capacities of 10-mm (nominal ⅜-in.) and 15.9-mm (nominal ⅝-in.) through-bolts with Diameter Nominal (DN) 15-mm (nominal ½-in.) and ...
Shear Performance Study of Sleeved Stud Connectors in Continuous Composite Girder
Shear Performance Study of Sleeved Stud Connectors in Continuous Composite Girder
In order to reveal the mechanism of sleeved stud connectors, 15 push-out specimens were designed, and static loading tests were conducted to evaluate the mechanical performance. Th...
Closed‐loop Soldering
Closed‐loop Soldering
This paper discusses some basic ideas about process development and control in Part I and applies them to soldering in Part II. Because it is possible to understand how design, mat...
Person-work Environment Fit Perceptions on employee performance in Civil Service Sector employees in Addis Ababa and Dire Dawa
Person-work Environment Fit Perceptions on employee performance in Civil Service Sector employees in Addis Ababa and Dire Dawa
Scholars of organizational behaviour have long been interested in understanding the interactions between employees and their environments, and how these interactions can influence ...
A Refinery Approach to Address Corrosion under Insulation & External Corrosion
A Refinery Approach to Address Corrosion under Insulation & External Corrosion
Abstract Corrosion under Insulation (CUI) and External Corrosion continue to be a major issue for all Petrochemical facilities throughout the world. Over many years,...

Back to Top