Implementation of multiphase metering on unmanned wellhead platform

View through CrossRef
Abstract In 1997 TotalFinaElf installed a multiphase meter on an offshore unmanned wellhead platform in the Middle East. The decision to go for the multiphase metering alternative, rather than a test separator, was based on the potential high savings in CAPEX and OPEX. Monitoring of the multiphase flow at the wellhead eliminates the need for dedicated testlines from remote wellhead completions, as well as the need for a dedicated test separator at the processing facility. At this field, the deployment of a multiphase meter has contributed in improving the economy of the full project and improving our understanding of the hydrodynamics of the reservoir near the wellbore. This experience demonstrates that MPFM can be a very reliable solution for well testing and well monitoring; nevertheless success requires a minimum involvement of all people (project people, specialists, users) from design studies to operations. Introduction At the beginning of the 90's, TotalFinaElf launched a major research and development project to extend the capabilities of multiphase export. This program included the simultaneous development of multiphase flow modeling, multiphase technology (qualification of multiphase pumps, development of multiphase meters, subsea separation), and a new process to fight fluid-related effects such as hydrates, waxes, etc. The initial aim was to simplify surface topside facilities; to avoid installation of separators, pumps, compressors, and safety/flaring systems. In a second stage, this technology could be subsea deployed. The development of these different disciplines would help to avoid duplicate processing and huge infrastructures, and would ease remote controlled operation of unmanned platforms. The multiphase meter was one component of this global approach. From 91 to 96, TotalFinaElf supported and tested multiphase meter prototypes. These were qualified on onshore fields. The application of an integrated multiphase approach to develop a Middle East offshore field reduced the investments and operating costs drastically. In such a development, the multiphase meter found its place by eliminating the need for a dedicated testing flowline or a test separator and flaring system. Therefore, in 1997 TotalFinaElf installed their first multiphase meter on an offshore unmanned wellhead platform. This paper describes the field facilities, the implementation of the multiphase meter, the operating conditions, and the experience gained and lessons learned about this equipment compared to test separators. The application The decision to use a multiphase meter was made back in 1994/1995. At that time, very few fields relied on a multiphase meter for well testing, without it being backed up by a test separator. The field layout is shown in Figure 1, and comprises wells that are clustered on a wellhead platform. The production is sent on shore through a 40 Km line. After separation, the oil is metered before custody transfer, which yields an excellent reference measurement. The platform is unmanned. It has minimum facilities: Production manifold, test manifold and the multiphase meter MPFM 1900VI. The local operator interface of the meter is housed in the electrical room.
Title: Implementation of multiphase metering on unmanned wellhead platform
Description:
Abstract In 1997 TotalFinaElf installed a multiphase meter on an offshore unmanned wellhead platform in the Middle East.
The decision to go for the multiphase metering alternative, rather than a test separator, was based on the potential high savings in CAPEX and OPEX.
Monitoring of the multiphase flow at the wellhead eliminates the need for dedicated testlines from remote wellhead completions, as well as the need for a dedicated test separator at the processing facility.
At this field, the deployment of a multiphase meter has contributed in improving the economy of the full project and improving our understanding of the hydrodynamics of the reservoir near the wellbore.
This experience demonstrates that MPFM can be a very reliable solution for well testing and well monitoring; nevertheless success requires a minimum involvement of all people (project people, specialists, users) from design studies to operations.
Introduction At the beginning of the 90's, TotalFinaElf launched a major research and development project to extend the capabilities of multiphase export.
This program included the simultaneous development of multiphase flow modeling, multiphase technology (qualification of multiphase pumps, development of multiphase meters, subsea separation), and a new process to fight fluid-related effects such as hydrates, waxes, etc.
The initial aim was to simplify surface topside facilities; to avoid installation of separators, pumps, compressors, and safety/flaring systems.
In a second stage, this technology could be subsea deployed.
The development of these different disciplines would help to avoid duplicate processing and huge infrastructures, and would ease remote controlled operation of unmanned platforms.
The multiphase meter was one component of this global approach.
From 91 to 96, TotalFinaElf supported and tested multiphase meter prototypes.
These were qualified on onshore fields.
The application of an integrated multiphase approach to develop a Middle East offshore field reduced the investments and operating costs drastically.
In such a development, the multiphase meter found its place by eliminating the need for a dedicated testing flowline or a test separator and flaring system.
Therefore, in 1997 TotalFinaElf installed their first multiphase meter on an offshore unmanned wellhead platform.
This paper describes the field facilities, the implementation of the multiphase meter, the operating conditions, and the experience gained and lessons learned about this equipment compared to test separators.
The application The decision to use a multiphase meter was made back in 1994/1995.
At that time, very few fields relied on a multiphase meter for well testing, without it being backed up by a test separator.
The field layout is shown in Figure 1, and comprises wells that are clustered on a wellhead platform.
The production is sent on shore through a 40 Km line.
After separation, the oil is metered before custody transfer, which yields an excellent reference measurement.
The platform is unmanned.
It has minimum facilities: Production manifold, test manifold and the multiphase meter MPFM 1900VI.
The local operator interface of the meter is housed in the electrical room.

Related Results

MMS 1200: Cooperation on a Subsea Multiphase Flow Meter Application
MMS 1200: Cooperation on a Subsea Multiphase Flow Meter Application
Abstract PETROBRAS (Brazil) and FLIJENTA (Norway and USA) are since beginning of 1996 working on this multiphase flow metering route development under a Technolog...
Design and simulation for seeding performance of high-speed inclined corn metering device based on discrete element method (DEM)
Design and simulation for seeding performance of high-speed inclined corn metering device based on discrete element method (DEM)
AbstractMechanical precision corn seed-metering planter has a compact structure, missed and repeated seeding advantages during high-speed operation. In this regard, the current res...
Multiphase Meters -- Operational Experience in the Asia-Pacific
Multiphase Meters -- Operational Experience in the Asia-Pacific
Abstract In recent years, oil field operators in the Asia Pacific region have installed and made operational a significant number of multiphase flow meters. ...
Multiphase Flow Metering:An Evaluation of Discharge Coefficients
Multiphase Flow Metering:An Evaluation of Discharge Coefficients
Abstract The orifice discharge coefficient (CD) is the constant required to correct theoretical flow rate to actual flow rate. It is known that single phase orifi...
Development of an Automatic Reentry Positioning System
Development of an Automatic Reentry Positioning System
ABSTRACT This paper describes the concept, design, analysis and sea trials of the reentry system, and particularly its positioning system. Its development was con...
Virtual Flow Metering as an Emerging Flow Measurement Technology
Virtual Flow Metering as an Emerging Flow Measurement Technology
Abstract The accurate measurement of multiphase rates of produced oil, water and gas has always been a significant challenge to the oil and gas industry. Over the la...
New Pseudo-Pressure and Pseudo-Time Functions for Multiphase Flow
New Pseudo-Pressure and Pseudo-Time Functions for Multiphase Flow
Abstract The development of pressure transient analysis was based on the assumption of a single phase slightly compressible fluid. This assumption was later relaxed ...
Method for identifying a connection with a metering defect among multiple connections on a single busbar section
Method for identifying a connection with a metering defect among multiple connections on a single busbar section
Purpose. The purpose of this work is to develop a methodology for identifying a defective connection on a single medium- or low-voltage busbar section among several parallel connec...