Multiphase Meters -- Operational Experience in the Asia-Pacific
View through CrossRef
Abstract
In recent years, oil field operators in the Asia Pacific region have installed and made operational a significant number of multiphase flow meters.
During the 1990's a few test meters were installed at various locations in the Asia – Pacific. The first commercially supplied multiphase meters were installed in 1998, and since then a large number of meters have been supplied for various projects and operators.
Most of the installations in this area are on small, unmanned wellhead platforms with very limited power and communication. The multiphase metering technology has proven to be a very cost-effective and attractive solution for these types of fields.
The paper describes and discusses some of the particular challenges and solutions for multiphase meters used on unmanned wellhead platforms. One of the main challenges is how to build confidence in the measurements, as there is normally no alternative method for verification of the measurements on the platform. Suitable operating concepts for multiphase metering at remote wellhead platforms are presented.
Roxar has now supplied around 40 multiphase meters to this region, and as a consequence, a substantial amount of experience has been acquired. Operational experience and data from several installations is presented and discussed.
Title: Multiphase Meters -- Operational Experience in the Asia-Pacific
Description:
Abstract
In recent years, oil field operators in the Asia Pacific region have installed and made operational a significant number of multiphase flow meters.
During the 1990's a few test meters were installed at various locations in the Asia – Pacific.
The first commercially supplied multiphase meters were installed in 1998, and since then a large number of meters have been supplied for various projects and operators.
Most of the installations in this area are on small, unmanned wellhead platforms with very limited power and communication.
The multiphase metering technology has proven to be a very cost-effective and attractive solution for these types of fields.
The paper describes and discusses some of the particular challenges and solutions for multiphase meters used on unmanned wellhead platforms.
One of the main challenges is how to build confidence in the measurements, as there is normally no alternative method for verification of the measurements on the platform.
Suitable operating concepts for multiphase metering at remote wellhead platforms are presented.
Roxar has now supplied around 40 multiphase meters to this region, and as a consequence, a substantial amount of experience has been acquired.
Operational experience and data from several installations is presented and discussed.
Related Results
Implementation of multiphase metering on unmanned wellhead platform
Implementation of multiphase metering on unmanned wellhead platform
Abstract
In 1997 TotalFinaElf installed a multiphase meter on an offshore unmanned wellhead platform in the Middle East. The decision to go for the multiphase met...
MMS 1200: Cooperation on a Subsea Multiphase Flow Meter Application
MMS 1200: Cooperation on a Subsea Multiphase Flow Meter Application
Abstract
PETROBRAS (Brazil) and FLIJENTA (Norway and USA) are since beginning of 1996 working on this multiphase flow metering route development under a Technolog...
Multiphase Flow Measurement Using Multiple Energy Gamma Ray Absorption (MEGRA) Composition Measurement
Multiphase Flow Measurement Using Multiple Energy Gamma Ray Absorption (MEGRA) Composition Measurement
Abstract
Some multiphase flowmeters use the principle of Dual Energy Gamma Ray Absorption (DEGRA) composition measurement to determine the individual water, oil a...
New Pseudo-Pressure and Pseudo-Time Functions for Multiphase Flow
New Pseudo-Pressure and Pseudo-Time Functions for Multiphase Flow
Abstract
The development of pressure transient analysis was based on the assumption of a single phase slightly compressible fluid. This assumption was later relaxed ...
Field Validation Processes for Multiphase Wet Gas Surface Well Testing Solutions: Example from the Yamburgskoe Arctic Gas Condensate Field, Russia
Field Validation Processes for Multiphase Wet Gas Surface Well Testing Solutions: Example from the Yamburgskoe Arctic Gas Condensate Field, Russia
Abstract
Surface welltesting of Gas-Condensate with multiphase flowmeters is still considered a challenge for production metering. Traditional means of well testing ...
Multiphase Flow Metering:An Evaluation of Discharge Coefficients
Multiphase Flow Metering:An Evaluation of Discharge Coefficients
Abstract
The orifice discharge coefficient (CD) is the constant required to correct theoretical flow rate to actual flow rate. It is known that single phase orifi...
Virtual Flow Metering as an Emerging Flow Measurement Technology
Virtual Flow Metering as an Emerging Flow Measurement Technology
Abstract
The accurate measurement of multiphase rates of produced oil, water and gas has always been a significant challenge to the oil and gas industry. Over the la...
Operational Aspects of Offshore Multiphase Gas-Condensate Pipelines
Operational Aspects of Offshore Multiphase Gas-Condensate Pipelines
ABSTRACT
To describe how multiphase flow and hydrate prevention may affect the design of a multiphase gas condensate p1peline the TOGI 20" pipeline is use a as an...