Javascript must be enabled to continue!
Optimization of the joint startup of the boom and load hoisting mechanisms of a jib crane
View through CrossRef
During the joint motion of the boom and load hoisting mechanisms, dynamic loads increase, leading to additional energy consumption, which subsequently contributes to the deterioration of the crane’s structure. The aim of the research was to enhance the efficiency of the jib crane by optimising the joint startup modes of the boom and load hoisting mechanisms, which will minimise energy consumption. To achieve this aim, methods of analytical mechanics, variational calculus, and a modified particle swarm optimisation metaheuristic method were used. As a result of using these methods, the joint startup of the boom and load hoisting mechanisms was optimised. The joint motion of the crane mechanisms is represented by a dynamic model with four degrees of freedom, which accounts for the main motion of the mechanisms, as well as the elastic oscillations of the load hoisting mechanism’s drive and low-frequency oscillations of the load on a flexible suspension. Based on the dynamic model, a mathematical model in the form of a system of second-order differential equations was constructed, which was then reduced to a system of two fourth-order equations. The synthesis of the optimal startup mode of the mechanisms was carried out according to the criterion of the root mean square value of the total power of the drives, taking into account the constraints on the driving torques of the drives. The constrained optimisation problem was reduced to an unconstrained optimisation problem by developing a generalised criterion. The nonlinear problem of optimising the joint startup mode for the boom and load hoisting mechanisms of the crane was solved using a modified particle swarm optimisation metaheuristic method. As a result of the optimisation, startup modes for the boom and load hoisting mechanisms were obtained that minimise the total power of the drives and eliminate low- and high-frequency oscillations of the crane’s structural elements, which leads to increased reliability and reduced energy consumption. This mode is recommended for use in the control systems of crane boom and load hoisting mechanisms
National University of Life and Environmental Sciences of Ukraine
Title: Optimization of the joint startup of the boom and load hoisting mechanisms of a jib crane
Description:
During the joint motion of the boom and load hoisting mechanisms, dynamic loads increase, leading to additional energy consumption, which subsequently contributes to the deterioration of the crane’s structure.
The aim of the research was to enhance the efficiency of the jib crane by optimising the joint startup modes of the boom and load hoisting mechanisms, which will minimise energy consumption.
To achieve this aim, methods of analytical mechanics, variational calculus, and a modified particle swarm optimisation metaheuristic method were used.
As a result of using these methods, the joint startup of the boom and load hoisting mechanisms was optimised.
The joint motion of the crane mechanisms is represented by a dynamic model with four degrees of freedom, which accounts for the main motion of the mechanisms, as well as the elastic oscillations of the load hoisting mechanism’s drive and low-frequency oscillations of the load on a flexible suspension.
Based on the dynamic model, a mathematical model in the form of a system of second-order differential equations was constructed, which was then reduced to a system of two fourth-order equations.
The synthesis of the optimal startup mode of the mechanisms was carried out according to the criterion of the root mean square value of the total power of the drives, taking into account the constraints on the driving torques of the drives.
The constrained optimisation problem was reduced to an unconstrained optimisation problem by developing a generalised criterion.
The nonlinear problem of optimising the joint startup mode for the boom and load hoisting mechanisms of the crane was solved using a modified particle swarm optimisation metaheuristic method.
As a result of the optimisation, startup modes for the boom and load hoisting mechanisms were obtained that minimise the total power of the drives and eliminate low- and high-frequency oscillations of the crane’s structural elements, which leads to increased reliability and reduced energy consumption.
This mode is recommended for use in the control systems of crane boom and load hoisting mechanisms.
Related Results
Dynamic analysis of the joint movement of derricking mechanism and lifting mechanism of a load during a steady-state turn of a jib crane
Dynamic analysis of the joint movement of derricking mechanism and lifting mechanism of a load during a steady-state turn of a jib crane
Increasing the productivity of jib cranes is an urgent problem of improving their operation. Combining the work of separate mechanisms is one of the ways to increase the productivi...
Crane Load Moment System For Offshore Crane Operations
Crane Load Moment System For Offshore Crane Operations
Abstract
History has shown that dependency upon the crane operator to monitor loads and boom angle or load radius do not allow the margin necessary to perform the...
Dynamic Simulation Analysis of Truck Crane Based on ADAMS
Dynamic Simulation Analysis of Truck Crane Based on ADAMS
Background:
With a reduction in the weight of telescopic boom crane and an increase in its
lifting capacity, the contradiction between its speed, stability and safety becomes more ...
Optimization of the joint start-up mode of the hoisting and slewing mechanisms of a boom
Optimization of the joint start-up mode of the hoisting and slewing mechanisms of a boom
To increase the productivity of boom cranes, joint movement of mechanisms is performed. The simultaneous start-up of mechanisms significantly increases dynamic loads and intensifie...
Optimisation of tower crane rotation mechanism force acceleration mode at steady payload hoisting
Optimisation of tower crane rotation mechanism force acceleration mode at steady payload hoisting
The process of optimisation of the force acceleration mode of the rotation mechanism of the tower crane with the beam jib at steady payload hoisting was examined in the presented p...
Minimisation of the driving torque of the derricking mechanism of a tower crane during steady load hoisting
Minimisation of the driving torque of the derricking mechanism of a tower crane during steady load hoisting
Efficient use of a tower crane often requires combining various operations, such as hoisting load and derricking. In the case when the load is hoisted at a steady speed, the proble...
The dynamic analysis of the joint trolley movement and hoisting mechanism in the tower crane
The dynamic analysis of the joint trolley movement and hoisting mechanism in the tower crane
The task of this paper is to research the simultaneous use of trolley and hoisting mechanism by the tower crane with a beam jib. To conduct research, a dynamic model of joint movem...
Startup marketing: features, digital tools, and promotion channels
Startup marketing: features, digital tools, and promotion channels
The aim of the article. The purpose of the article is to study the digital marketing tools of a startup in terms of marketing strategy following the stage of the life cycle, the en...


